Cisco Catalyst 2350 Installation Manual
|
Cisco Catalyst 2350, 4-4 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 4 Troubleshooting Clearing the Switch IP Address and Configuration To maximize switch performance and to ensure a link, follow one of these guidelines when changing the duplex or speed settings. • Let both ports autonegotiate both speed and duplex. • Manually set the speed and duplex parameters for the ports on both ends of the connection. • If a remote device does not autonegotiate, set the same duplex settings on the two ports. The speed parameter adjusts itself even if the connected port does not autonegotiate. Autonegotiation and Network Interface Cards Problems sometimes occur bet
Cisco Catalyst 2350, 1-4 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 1 Overview Front Panel Description System LED The System LED shows whether the system is receiving power and is functioning properly. For information on the System LED colors during power-on self-test (POST), see the “Diagnosing Problems” section on page 4-1. Port LEDs and Modes Each Ethernet port and 10-Gigabit Ethernet module slot has a port LED. These port LEDs, as a group or individually, display information about the switch and about the individual ports. The port mode determines the type of inform
Cisco Catalyst 2350, 3-6 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 3 Power Supply and Fan Module Installation Installing a DC-Power Supply Step 6 Using a ratcheting torque screwdriver, torque the ground-lug screws to 60 lbf-in (960 ozf-in) ( Figure 3-5). Step 7 Connect the other end of the grounding wire to an appropriate grounding point at your site or to the rack. Figure 3-5 Attaching the Ground Lug and Wire Assembly on Catalyst 2350 Switches Installing the DC Power Supply in the Switch Step 1 T
Cisco Catalyst 2350, CHAPTER 1-1 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 1 Overview The Catalyst 2350 switch, also referred to as the switch, is an Ethernet switch to which you can connect devices such as servers, routers, and other switches. • Switch Models, page 1-1 • Front Panel Description, page 1-1 • Rear Panel Description, page 1-5 • Management Options, page 1-8 Switch Models Note All switch models support the Cisco TwinGig Converter Module. Front Panel Description The switch front panel includes the 10/100/1000 Ethernet ports, the 10-Gigabit Ethernet module slots, and the switch LEDs. Figure 1-1 shows the Catalyst 23
Cisco Catalyst 2350, Contents v Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Ping End Device 4-3 Spanning Tree Loops 4-3 Switch Performance 4-3 Speed, Duplex, and Autonegotiation 4-3 Autonegotiation and Network Interface Cards 4-4 Cabling Distance 4-4 Clearing the Switch IP Address and Configuration 4-4 Finding the Switch Serial Number 4-5 APPENDIX A Technical Specifications A-1 APPENDIX B Connector and Cable Specifications B-1 Connector Specifications B-1 10/100/1000 Ports B-1 10-Gigabit Ethernet Module Interfaces B-2 SFP Modules B-2 10/100 Ethernet Managemen
Cisco Catalyst 2350, 3-2 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 3 Power Supply and Fan Module Installation Installation Overview Warning Do not reach into a vacant slot or chassis while you install or remove a module or a fan. Exposed circuitry could constitute an energy hazard. Statement 206 Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Statement 1030 Warning Do not work on the system or connect or disconnect cables during periods of lightning activity. Statement 1001
Cisco Catalyst 2350, C-3 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Appendix C Configuring the Switch with the CLI-Based Setup Program Entering the Initial Configuration Information Completing the Setup Program The initial setup dialog appears at the console when you first press Enter. Step 1 Enter Yes at the following two prompts. Would you like to enter the initial configuration dialog? [yes/no]: yes At any point you may enter a question mark '?' for help. Use ctrl-c to abort configuration dialog at any prompt. Default settings are in square brackets '[]'. Basic mana
viii Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Preface Warning This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of
2-12 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 2 Switch Installation Installing Devices in 10-Gigabit Ethernet Slots Installing Devices in 10-Gigabit Ethernet Slots These sections describe how to install and remove X2 transceiver converter modules. Use only Cisco X2 transceiver modules, converter modules, and SFP modules with the switch. Each C
Cisco Catalyst 2350, C-4 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Appendix C Configuring the Switch with the CLI-Based Setup Program Entering the Initial Configuration Information You have now completed the initial configuration of the switch, and the switch displays its initial configuration. This is an example of output that appears: The following configuration command script was created: hostname switch1 enable secret 5 $1$Ulq8$DlA/OiaEbl90WcBPd9cOn1 enable password enable_password line vty 0 15 password terminal-password no snmp-server ! no ip routing ! interface Vlan1 no shutdown ip address 10.4.120.106 255.0.0.0 ! interface GigabitEthernet1/0/1 ! interface Gig
Cisco Catalyst 2350, A-2 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Appendix A Technical Specifications Input current C3K-PWR-265WDC: 12 A DC input voltage C3K-PWR-265WDC: –36 to –72 VDC Output ratings C3K-PWR-265WDC: 12 V@22 A Voltage range domestic C3K-PWR-265WDC: –40.5 VDC (min), –48 VDC (nominal), –56 VDC (max) Voltage range international C3K-PWR-265WDC: –55 VDC (min), –60 VDC (nominal), –72 VDC (max) Total input BTU 1 C3K-PWR-265WDC: 1305 BTUs per hour, 379 W Total output BTU 1 C3K-PWR-265WDC: 90
Cisco Catalyst 2350, Index IN-4 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 port modes changing 1-3 LEDs 1-4 See also mode button ports 10/100/1000 connecting to 2-16 described 1-2 pinouts B-1 recommended cables 2-17 POST LEDs 4-1 running at power on 4-1 power connection warning 2-2 power specifications A-1 power-supply modules described 1-5 installation 3-1 procedures connection 2-12 to 2-13, 3-3 to 3-8 installation 2-6 to 2-11 product disposal warning 2-3 R rack-mounting 2-6 to 2-10 rear panel clearance
Cisco Catalyst 2350, Index IN-2 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 accessing by using Express Setup C-1 accessing through console port C-1 CNA See Cisco Network Assistant code compliance warning 2-4 command-line interface See CLI connection procedures 2-12 to 2-13, 3-3 to 3-8 connectors and cables B-1 to B-7 console port connecting to C-2 connectors and cables B-4 described 1-7 crossover cable See cables D DC circuit warning 2-2 DC power connecting to 3-4 power-supply module described 1-5 power supply module installation 3-4 specifications A-1, A-2 DC power warning 3-4 dev
2-17 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 2 Switch Installation Where to Go Next Where to Go Next If the default configuration is satisfactory, the switch does not need further configuration. You can use any of these management options to change the default configuration: • Start the device manager, which is in the switc
Cisco Catalyst 2350, ix Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Preface These compatibility matrix documents are available from this Cisco.com site: http://www.cisco.com/en/US/products/hw/modules/ps5455/products_device_support_tables_list.html • Cisco Gigabit Ethernet Transceiver Modules Compatibility Matrix • Cisco 100-Megabit Ethernet SFP Modules Compatibility Matrix • Cisco Small Form-Factor Pluggable Modules Compatibility Matrix • Compatibility Matrix for 1000BASE-T Small Form-Factor Pluggable Modules Obtaining Documentation and Submitting a Service Request For information on obtaining documentation, submitting a service request, and gathering additional
2-8 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 2 Switch Installation Installing the Switch Attaching the Rack-Mount Brackets You must first remove the screws from the switch chassis so that the mounting brackets can be attached. For a front-mounting position, remove two Phillips truss-head screws from the switch side panels ( Figure 2-2). For a mid-mo
Cisco Catalyst 2350, 3-7 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 3 Power Supply and Fan Module Installation Installing a DC-Power Supply Figure 3-6 Inserting the DC-Power Supply in Catalyst 2350 Switches Step 7 Align the two captive screws with the screw holes. Using a ratcheting torque screwdriver, torque each screw to 7 lbf-in (112 ozf-in). Step 8 Connect the input power as described in the “Wiring the DC-Input Power Source” section. Wiring the DC-Input Power Source Step 1 Using a wire-stripping tool, strip each of the four wires coming from the DC-input power source to the app
Cisco Catalyst 2350, 2-2 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 2 Switch Installation Preparing for Installation Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals. Statement 43 Warning Do not stack the chassis on any other equipment. If the chassis falls, it can cause severe bodily injury and equipment damage. Statement 48 Warning An exposed wire lead from a DC-input power source can conduct harmful levels of electricity. Be sure that no exposed port
Cisco Catalyst 2350, 2-6 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 2 Switch Installation Installing the Switch Tools and Equipment You need to supply a number-2 Phillips screwdriver to rack-mount the switch. Installing the Switch • Rack-Mounting, page 2-6 • Table- or Shelf-Mounting, page 2-11 • After Installing the Switch, page 2-11 The illustrations shown in this section show the Catalyst 2350 switch with AC power as an example. You can install both models of the Catalyst 2350 switch following the same proced
Cisco Catalyst 2350, 3-5 Catalyst 2350 Switch Hardware Installation Guide OL18479-01 Chapter 3 Power Supply and Fan Module Installation Installing a DC-Power Supply Grounding the Switch To make sure that the equipment is reliably connected to earth ground, follow the grounding procedure instructions and observe these warnings: Warning This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available. Statement 1024 Warnin
Cisco Catalyst 4124 Switch Product overview
Catalyst 4124 |
Cisco 2955 Switch Hardware installation manual
2955 |
Cisco IGX 8 Switch Specification sheet
IGX 8 |
Cisco 2975 - Catalyst LAN Base Switch Switch Getting started manual
2975 - Catalyst LAN Base Switch |
Cisco SRW2008P - Small Business Managed Switch Switch Datasheet
SRW2008P - Small Business Managed Switch |
Cisco SFE1000P - Small Business Managed Switch Switch Datasheet
SFE1000P - Small Business Managed Switch |
Cisco Catalyst 2960-SF Series Switch Datasheet
Catalyst 2960-SF Series |
Cisco Catalyst 3560V2-24PS Switch Datasheet
Catalyst 3560V2-24PS |
# | Manufacturer | Model | Document Type | File | Updated | Pages | Size |
---|---|---|---|---|---|---|---|
1 | TEFAL | PRO EXPRESS ANTI-CALC | Notice | tefal/pro-express-anti-calc-Y36.pdf | 18 Mar 2024 | 126 | 8.88 Mb |
2 | Havis-Shields | 2000-2005 Chevrolet Impala Trak-Mount Kit C-TM-IMP | Install instructions | havis-shields/2000-2005-chevrolet-impala-trak-mount-kit-c-tm-imp-3OM.pdf | 17 Jun 2023 | 2 | 0.24 Mb |
3 | Amigo | MicroModem | Installation manual | amigo/micromodem-3YI.pdf | 27 Sep 2023 | 37 | |
4 | Symphonic | ST131E | Owner's manual | symphonic/st131e-A3O.pdf | 06 Dec 2022 | 8 | |
5 | Toshiba | C650D-ST4NX1 | Specifications | toshiba/c650d-st4nx1-PXP.pdf | 17 Apr 2023 | 4 | |
6 | Epson | 836XL - Expression - Flatbed Scanner | Operation & user’s manual | epson/836xl-expression-flatbed-scanner-YWM.pdf | 14 Jul 2022 | 24 | 3.13 Mb |
Tripp Lite
Tripp Lite1111 West 35th StreetChicago, IL 60609 USATelephone: +(773) 869 1234E-mail: [email protected] Number: B060-016-2KVM Switch - 16-Port (2-User) 1U Rackmount Cat5 Matrix KVM Switch HighlightsTwo consoles independently and simultaneously control up to 16 directlyconnected computers, or over 1,000 when additional KVMs are connectedMulti-plat …
B060-016-2(3 pages) |
Extreme Networks
Summit WM200/2000 Controller Installation Instructions© 2007-2008 Extreme Networks, Inc. All rights reserved. Part number: 120389-00 Rev 02 Getting startedThese instructions provide installation technicians with a high-level overview for installing the Summit® WM200/2000 Controller. Unpack the controller:1 Lift the controller, in its protective foam casin …
WM200(2 pages) |
H3C
Operation Manual – File System Management H3C S3610&S5510 Series Ethernet Switches Table of Contents i Table of Contents Chapter 1 File System Management Configuration................................................................... 1-1 1.1 File System Management........................................................................................ …
S3610 Series(28 pages) |
Trimod Besta
www.trimodbesta.com 1 │ 8 LTB011EN │ 2016.04 LTB011EN Operating Instruction Trimod Besta Level Switch – type B…5 for use in potentially explosive atmospheres acc. to IECEx scheme Subject to technical modification Bachofen AG | Ackerstrasse 42 | CH-8610 Uster | Switzerland Phone +41 44 944 11 11 | F …
Bxxx5 Series(8 pages) |
Eaton
Types H, 4H, and V4H maintenance instructionsType H 50 Amp reclosers - Applicable to serial numbers above 246404 or beginning with CP57.Type 4H 100 Amp reclosers - Applicable to serial numbers above 69275 or beginning with CP57.Type V4H 200 Amp reclosers - Applicable to serial numbers above 7542 or beginning with CP57.COOPER POWERSERIESReclosers MN280052ENEf …
COOPER POWER SERIES(32 pages) |
Weidmuller
1 2 3 Hardware Installation Guide Managed Fast Ethernet Switch IE-SW-AL08M-8TX (Part No. 2682280000) 1. Introduction Ethernet Switches from Weidmüller are designed for industrial applications and fitted with a robust housing. To ensure reliable, error-free operation, and to prevent damage or injury, please read the operating ins …
IE-SW-AL08M-8TX(2 pages) |
Advantech Desktop TREK-734Advantech Desktop TREK-734 Operation & user’s manual TREK-734, 56 |
USB Share Switch USB-413Operation & user’s manual for USB Share USB-413 Switch USB-413, 21 |
Cisco Gateway Small Business Pro SA520Cisco Gateway Quick start up manual (File: cisco-small-business-pro-sa520-quick-start-up-manual-2, Wednesday 10-01-2024) Small Business Pro SA520, 2 |
Makita Rotary Hammer HR5000Makita HR5000 Rotary Hammer Instruction manual HR5000, 10 |
Whirlpool Refrigerator EB9SHKXVQRefrigerator Energy manual (Whirlpool EB9SHKXVQ) EB9SHKXVQ, 1 |
Me Tablet Tablet G1Me Tablet G1 Tablet Operation & user’s manual G1, 19 |
BMW Automobile X6 - BROCHURE 2010Brochure for BMW X6 - BROCHURE 2010 Automobile X6 - BROCHURE 2010, 30 |
Minolta Other K-QM-3501E - PART 5Minolta Other Manual (File: minolta-k-qm-3501e-part-5-other-3, 25th Aug 2023) K-QM-3501E - PART 5, 3 |
Kodak Digital Camera M340 - EASYSHARE Digital CameraDigital Camera PDF Extended user manual M340 - EASYSHARE Digital Camera, 71 |
KOBE Ventilation Hood CH3830SQB-1User Guide: KOBE CH3830SQB-1 (A8ALXE, Upd.Wednesday 03-01-2024) CH3830SQB-1, 40 |
Weslo Other Cadence J2.8 TreadmillUser Guide: Weslo Cadence J2.8 Treadmill (ZK671E, Upd.05/11/2023) Cadence J2.8 Treadmill, 19 |
Addonics Technologies Control Systems DGC7#84RQP4: DGC7 Control Systems Manual DGC7, 1 |