GREENSTAR 12Ri ErP Installation, Commissioning And Servicing Instructions
|
GREENSTAR 12Ri ErP, APPLIANCE INFORMATION Greenstar Ri ErP - 6 720 813 283 (2015/07)8 3.3 Energy efficiency NATURAL GAS APPLIANCES The following product data satisfy the requirements of the EU Regulations No. 811/2013 and No. 812/2013 supplementing Directive 2010/30/EU. Product data Symbol Unit 7733600074 7733600072 7733600070 7733600068 Product type – – 12Ri ErP NG 15Ri ErP NG 18Ri ErP NG 24Ri ErP NG Condensing boiler – – Yes Yes Yes Yes Low temperature boiler – – No No No No B1 boiler – – No No N
GREENSTAR 12Ri ErP, INSTALLATION, COMMISSIONING AND SERVICING INSTRUCTIONS WALL HUNG RSF GAS FIRED CONDENSING BOILER Greenstar Ri ErP 6720644744-00.1Wo FOR OPEN VENTED & SEALED CENTRAL HEATING SYSTEMS & INDIRECT MAINS FED DOMESTIC HOT WATER 6 720 813 283 (2015/07) If you smell gas: ▶ Well away from the building: call the National Gas Emergency Service on 0800 111 999. ▶ L.P.G. boilers: Call the supplier’s number on the side of the gas tank. These appliances are for use with: Natural Gas or L.P.G. (Cat. II 2H 3P type C13, C33 & C53) Model GC Number Natural Gas 12Ri ErP 41-406-41 15Ri ErP 41-406-43 18Ri ErP 41-406-45 24Ri ErP 41-406-47 LPG 1
GREENSTAR 12Ri ErP, APPLIANCE INFORMATION Greenstar Ri ErP - 6 720 813 283 (2015/07) 9 LPG appliances The following product data satisfy the requirements of the EU Regulations No. 811/2013 and No. 812/2013 supplementing Directive 2010/30/EU. Product data Symbol Unit 7733600075 7733600073 7733600071 7733600069 Product type – – 12Ri LPG 15Ri LPG 18Ri LPG 24Ri LPG Condensing boiler – – Yes Yes Yes Yes Low temperature boiler – – No No No No B1 boiler – – No No No No Cogeneration space heater (CHP) – – No No No No Combination heater – – No No No No Rated heat output P rated kW 12 15 18 24 Seasonal space heating energy efficiency s % 91919192 En
GREENSTAR 12Ri ErP, KEY TO SYMBOLS AND SAFETY PRECAUTIONS Greenstar Ri ErP - 6 720 813 283 (2015/07) 3 1 KEY TO SYMBOLS AND SAFETY PRECAUTIONS 1.1 Key to symbols Warnings The following keywords are defined and can be used in this document: • NOTICE indicates a situation that could result in damage to property or equipment. • CAUTION indicates a situation that could result in minor to medium injury. • WARNING indicates a situation that could result in severe injury or death. • DANGER indicates a situation that will result in severe injury or death. Important information Additional symbols Examples of additional symbols used A numbered step in an action sequen
GREENSTAR 12Ri ErP, SERVICE AND SPARES Greenstar Ri ErP - 6 720 813 283 (2015/07)40 7.8.4 FLUE OVERHEAT THERMOSTAT (WITH GROMMET) To remove and replace the thermostat either: ▶ Using a small terminal screwdriver, prise the thermostat and grommet from the plastic housing. Take care not to damage the plastic housing. -or- 1.Release the flue connection from the sump. 2.Push the flue tube up. Fig. 69 Lower exhaust section ▶ Remove electrical connections. 1.Push the flue limit thermostat in from the sump. ▶ Retrieve the thermostat from the sump well. Fig. 70 Remove
GREENSTAR 12Ri ErP, REGULATIONS Greenstar Ri ErP - 6 720 813 283 (2015/07) 5 2Regulations Installation regulations Current Gas Safety (Installation & Use) Regulations: All gas appliances must be installed by a competent person in accordance with the above regulations. Failure to install appliances correctly could lead to prosecution. The appliance must be installed in accordance with, and comply to, the current: Gas Safety Regulations, IET Regulations, Building Regulations, Building Standards (Scotland) (Consolidation), Building Regulations (Northern Ireland), local water by-laws, Health & Safet
GREENSTAR 12Ri ErP, APPLIANCE INFORMATION Greenstar Ri ErP - 6 720 813 283 (2015/07) 7 3.2 TECHNICAL DATA DESCRIPTION NATURAL GAS LPG UNIT 12Ri 15Ri 18Ri 24Ri 12Ri 15Ri 18Ri 24Ri Gas flow rate - Max. 10 minutes from lighting Natural Gas G20 m³/h 1.3 1.63 1.96 2.6 ---- Propane Gas (LPG) kg/h ----0.96 1.20 1.44 1.91 Central Heating Max. rated heat input (net) kW 12.32 15.40 18.48 24.62 12.32 15.40 18.48 24.62 Min. heat input kW 3.45 4.62 5.54 7.38 5.95 5.95 9.64 9.64 Maximum rated heat output 40/30 °C kW 12.85 16.06 19.28 25.67 12.85 16.06 19.28 25.67 Maximum r
SERVICE AND SPARES Greenstar Ri ErP - 6 720 813 283 (2015/07) 33 7 SERVICE AND SPARES 7.1 INSPECTION AND SERVICE • To ensure the continued efficient operation of the appliance it must be checked at regular intervals. • The frequency of servicing will depend upon the particular installation conditions and usage however, an annual service is recommended. • The
GREENSTAR 12Ri ErP, SERVICE AND SPARES Greenstar Ri ErP - 6 720 813 283 (2015/07) 47 7.9 SHORT PARTS LIST Fan 8 716 116 067 0 GC No. H26 536 Burner 12 & 15Ri: 8 716 116 379 0 GC No. H26 537 18 & 24Ri: 8 716 120 619 0 GC No. H26-538 Gas Valve 12/15/18 & 24Ri 8 716 111 325 0 GC No. H26 540 Control board 8 718 687 164 0 H26-541 Flue overheat thermostat (grommet type) 8 710 506 267 0 Electrodes (including gasket) 8 718 107 087 0 Gasket - burner WB6 8 716 110 534 0 Seal - Inner case/mantel 8 716 106 635 0 H26-545 Flow temperature sensor - (NTC) 8 716 106 688 0 GC No. H26 542 Air pressure switch 8 716 106 633 0 G.C. No. H26 543 Seals kit 8 716 107
GREENSTAR 12Ri ErP, PRE-INSTALLATION Greenstar Ri ErP - 6 720 813 283 (2015/07)14 Fig. 10 Condensate pump disposal 4.4.2 EXTERNAL CONNECTIONS If no other discharge method is possible then the use of an externally run condensate drainage pipe terminating at a suitable foul water discharge point, or purpose-designed soak away, may be considered. If this method is chosen then the following measures should be adopted: ▶ The external run be kept as short as possible and not exceed 3 metres. ▶ The pipe should be run in
GREENSTAR 12Ri ErP, SERVICE AND SPARES Greenstar Ri ErP - 6 720 813 283 (2015/07)34 7.2 CHECKING GAS INLET PRESSURE Refer to section 6.5.1 for checking the gas inlet pressure 7.3 CHECKING FLUE INTEGRITY The integrity of the flue system and performance of the boiler can be checked via the flue turret sample points. Fig. 50 Flue test points ▶ With the boiler case on and the boiler running at maximum. ▶ Insert the analyser probe into the air intake test point. ▶ Allow the readings to stabilise and check that: –O 2 is equal to, or greater than 20.6% –CO 2 is less than 0.2% ▶ If the readings are outside these limits the
GREENSTAR 12Ri ErP, COMMISSIONING Greenstar Ri ErP - 6 720 813 283 (2015/07)32 6.7 FINISHING COMMISSIONING 6.7.1 REPLACE THE OUTER CASE: Replace outer casing making sure that the securing points are properly located. 1.Replace top two screws. 2.Re-tighten bottom two screws. Fig. 46 Replacing outer case 6.7.2 INSTALL THE BOTTOM PANEL The cut out in the bottom panel fits easily over the syphon elbow and outlet, however care should be taken not to disturb any sealed components. 1.Hook the lip at the back of the bottom panel over the angled edge at the base of the connections manifold. 2.Push up into position. 3.Secure in position the screw provided. Fig. 47 Bottom
SERVICE AND SPARES Greenstar Ri ErP - 6 720 813 283 (2015/07) 37 1.Refer to figure 60 and rotate fan and air/gas manifold assembly around the top of the heat exchanger until it stops at the lug. ▶ Lift up assembly and remove from boiler. 2.Remove the cover panel by removing retaining screw. Fig. 60 Rotate air/gas manifold BURNER REMOVAL Refer to figure 61 1.Re
GREENSTAR 12Ri ErP, CONTENTS Greenstar Ri ErP - 6 720 813 283 (2015/07)2 CONTENTS 1 KEY TO SYMBOLS AND SAFETY PRECAUTIONS . . . . . . . . . . . . 3 1.1 Key to symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.2 Safety precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2 Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 3 APPLIANCE INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 3.1 Appliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GREENSTAR 12Ri ErP, COMMISSIONING Greenstar Ri ErP - 6 720 813 283 (2015/07)28 EXTERNAL WIRING CENTRE System components wired into terminal strip in accordance with system manufacturers instructions. Fig. 36 External wiring centre Refit electric control panel covers: ▶ Refit panel and secure with screws. 6 COMMISSIONING 6.1 PRE-COMMISSIONING CHECKS ▶ Check that the gas service pipe and water pipes are connected to the correct position on the manifold. 1.Gas inlet (22mm) 2.Flow (22mm) 3.Return (22mm) Fig. 37 ▶ Check the gas type specified on the identification plate (1) matches that of the gas supply. Fig. 38 Data plate location ▶ Turn on the mai
GREENSTAR 12Ri ErP, SERVICE AND SPARES Greenstar Ri ErP - 6 720 813 283 (2015/07) 43 7.8.10 ELECTRODE ASSEMBLY AND BURNER ▶ Refer to figure 80 and disconnect spark electrodes and flame sensor connection. ▶ Remove clamping plate. 1.Remove spark/flame electrode assembly from heat exchanger. 2.Remove the seal from the top of the heat exchanger. 3.Remove the burner. ▶ Replace new burner in correct position. ▶ Ensure that burner tabs, as shown in figure 80, fit correctly their respective locations. ▶ Ensure that the seal is fitted. ▶ Replace the clamping plate. Fig. 80 Electrode assembly and burner 7.8.11 RE-ASSEMBLY OF THE BURNER CLAMPING PLATE ▶ Ensure that the new
PRE-INSTALLATION Greenstar Ri ErP - 6 720 813 283 (2015/07)16 Fig. 16 Ventilated compartment 4.6.3 COMPARTMENTS: Follow the requirements of BS6798 and BS5440 Part 2 and note: • Minimum clearances must be maintained. • An access door is required to install, service and maintain the boiler and any ancillary equipment. • If the boiler is installed in an unventila
GREENSTAR 12Ri ErP, FAULT FINDING AND DIAGNOSIS Greenstar Ri ErP - 6 720 813 283 (2015/07) 51 8.3 PROTECTION FUNCTION Fig. 93 Protection function Internal boiler temperature between 8°C & 5°C Boiler automatic frost function (monitors internal boiler primary temperature) Internal boiler temperature below 5°C Internal boiler temperature rises above 9°C Pump runs Pump switches off after a 3 minute overrun period Internal boiler temperature rises above 12°C Central heating demand switches off Pump switches off after a 3 mi
GREENSTAR 12Ri ErP, PRE-INSTALLATION Greenstar Ri ErP - 6 720 813 283 (2015/07) 19 High level horizontal flue High level horizontal flue with additional elbows High level horizontal flue with additional elbows Vertical balanced flue assembly Vertical balanced flue with elbow offset (2 x 90 ° bends) Vertical balanced flue with elbow offset (2 x 45 ° bends) Maximum flue length (mm) 60/100 80/125 High level horizontal flue 4,600 13,000 Table 22 Maximum flue length (mm) 60/100 80/125 High level horizontal flue with 2 x 90° bends 2,600 11,000 Table 23 Maximum flue length (mm) 60/100 80/125 High level horizontal flue with 3 x 90° bends N/A 9,000 Tab
GREENSTAR 12Ri ErP, PRE-INSTALLATION Greenstar Ri ErP - 6 720 813 283 (2015/07)18 4.8 FLUE OPTIONS 4.8.1 Flue lengths The flue systems have different maximum flue lengths The Greenstar series has the option of two horizontal 60/100 RSF (telescopic and longer telescopic) and one horizontal 80/125 RSF (telescopic) flue system and two vertical RSF (60/100 or 80/125) flue systems: Refer to the following example Flue options for the maximum flue lengths. Horizontal high level flue assembly TELESCOPIC HORIZONTAL FLUE ASSEMBLY Extended horizontal flue Horizontal flue with additional elbow (1 x 90 ° bend) Horizontal flue with additional elbows (2 x 90 ° bends) WARNING: Flue systems
Ferroli T-ONE Boiler Instructions for use, installation and maintenance
T-ONE |
Viessmann VITOCELL 100-V Boiler Technical data manual
VITOCELL 100-V |
Sime RX 19 Boiler Installation instructions manual
RX 19 |
TANGRA HP 30 Boiler Installation and operation manual
HP 30 |
GREENSTAR 24i junior Boiler Instruction manual
24i junior |
GREENSTAR Highflow 440 Boiler Instruction manual
Highflow 440 |
Froling P2-15 Boiler Operating instructions manual
P2-15 |
Baxi Megao System 15 - Megao System 18 - Megao System 24 - Megao System 28 - Megao System 32 Boiler Operation & user’s manual
Megao System 15 - Megao System 18 - Megao System 24 - Megao System 28 - Megao System 32 |
# | Manufacturer | Model | Document Type | File | Updated | Pages | Size |
---|---|---|---|---|---|---|---|
1 | Yamaha | CVP-49 | Owner's manual | yamaha/cvp-49-185.pdf | 23 Jul 2023 | 56 | 1.14 Mb |
2 | Kenwood | UD-203 | Instruction manual | kenwood/ud-203-6XY.pdf | 17 Jul 2022 | 40 | |
3 | GBC | CombBind C150Pro | Specification | gbc/combbind-c150pro-8G9.pdf | 09 Oct 2022 | 1 | 0.2 Mb |
4 | Klipsch | Reference Series RF-7 II | Manual | klipsch/reference-series-rf-7-ii-D4S.pdf | 23 Nov 2023 | 8 | |
5 | LG | W1942T | Specifications | lg/w1942t-AFT.pdf | 24 Sep 2023 | 2 | |
6 | Braun | 3105 | Operation & user’s manual | braun/3105-EDZ.pdf | 02 Apr 2023 | 42 | 0.6 Mb |
ECR
P/N 240009024, Rev. B [12/2013]An ISO 9001-2008 Certified Company15B SERIES IICast Iron Gas Fired Boilers For Forced Hot WaterINSTALLATION, OPER ATION & MAINTENANCE MANUALManufactured by:ECR International, Inc.2201 Dwyer Avenue, Utica NY 13501web site: www.ecrinternational.comModels 15B045FE15B070FE15B096FE15B120FE15B145FE15B170FE15B195FE15B245FE15B295F …
Pennco 15B045FE(32 pages) |
Beretta
Idrabagno 11 - 13 ESIInstaller and user manualENFRESPTGRINSTALLER AND USER MANUALMANUEL D’INSTALLATION ET D’UTILISATIONMANUAL DE INSTALACIÓN Y USOMANUAL PARA INSTALAÇÃO E USOΕΓΧΕΙΡΙΔΙΟ ΕΓΚΑΤΑΣΤΑΤΗ ΚΑΙ ΧΡΗΣΤΗIT MANUALE INSTALLATORE E UTENTEHUTELEPÍTÉSI ÉS FELHASZNÁLÓI KÉZIKÖNYV
…
Idrabagno 11 ESI(68 pages) |
Beretta
ITISTRUZIONI PER L’INSTALLATORE E PER IL SERVIZIO TECNICO DI ASSISTENZA ENINSTRUCTIONS FOR THE INSTALLER AND FOR TECHNICAL ASSISTANCEFRINSTRUCTION POUR L’INSTALLATEUR ET LE SERVICE APRÈS-VENTEPLINSTRUKCJA MONTAŻU I OBSŁUGIInstaller and user manualCONNECT AT-BT LE
…
CONNECT AT LE(40 pages) |
Sime
ECOMFORTPLUS 25 HEInstallation and servicing instructionsGBITESPTFRNLUnit 3A, Thornton Road Ind. Estate Off Hockney Road Bradford, BD8 9HQ01274 488 388www.heatingspares247.com
…
ECOMFORT PLUS 25 HE(32 pages) |
Sime
MURELLE EV HE25-30-35-12 T-20 T-25 T-30 T-35 T199838USER INSTRUCTIONSENSURE THAT THESE INSTRUCTIONS ARE LEFT FOR THE USER AFTER COMPLETION OF THE BENCHMARK SECTIONPLEASE READ THE IMPORTANT NOTICE WITHIN THIS GUIDE REGARDING YOUR BOILER WARRANTYUKCod. 6316195 - 05/2012
…
MURELLE HE 25(16 pages) |
Ariston
Installation and Servicing InstructionsEGIS HECONDENSING WALL-HUNG GAS BOILEREGIS HE 24 EGIS HE 30Country of destination GB, IEGC Numbers: EGIS HE 24 47-116-71EGIS HE 30 47-116-72
…
EGIS HE 24(64 pages) |
Tripp Lite Network Cable N201-001-BKNetwork Cable #2V62V8 N201-001-BK, 3 |
Stamina Fitness Equipment STAMINA X Hyper BenchOwner's manual for Stamina STAMINA X Hyper Bench Fitness Equipment STAMINA X Hyper Bench, 18 |
Chevrolet Automobile 2011 HHRChevrolet Product Manual: 2011 HHR PDF Owner's manual - 644GL6 2011 HHR, 444 |
Sonel Test Equipment P-2Guide: Sonel P-2 (56LITP, Upd.Tuesday 17-10-2023) P-2, 16 |
ITC Mixer T-6240Mixer #25179R T-6240, 11 |
Transition Networks Network Card NANOMETER E-100BTX-SX-01Transition Networks Network Card NANOMETER E-100BTX-SX-01 Operation & user’s manual NANOMETER E-100BTX-SX-01, 2 |
Moffat Kitchen Appliance 500 TCMoffat 500 TC Guide (Doc Type: Kitchen Appliance Instruction book) 500 TC, 28 |
Sirius Satellite Radio Car Receiver SIRIUSOne SV1SIRIUSOne SV1 (Car Receiver ePDF Manual, #O43Z2K) SIRIUSOne SV1, 36 |
KYMCO Offroad Vehicle MXU 50 REVERSEOffroad Vehicle Owner's manual (KYMCO MXU 50 REVERSE) MXU 50 REVERSE, 140 |
Emerson Clock Radio BAR805PDF Guide (@ZRT2Z8), Emerson BAR805 Clock Radio (Thu 08.2023) BAR805, 17 |
Mitsubishi Electric Air Conditioner PLA-RP35BAAir Conditioner Operation manual (Mitsubishi Electric PLA-RP35BA) PLA-RP35BA, 30 |
Moog Security Camera QRHW SERIESMoog QRHW SERIES Security Camera Installation and operation instructions manual QRHW SERIES, 15 |