Manualios.com

Blodgett CB24-24E Installation Operation & Maintenance

Blodgett CB24-24E Manual Online:

3.4, 1448 votes
Blodgett CB24-24E User Manual
Blodgett CB24-24E User Guide
Blodgett CB24-24E Online Manual

Text of Blodgett CB24-24E User Guide:

  • Blodgett CB24-24E, 1 CB-E SERIES ELECTRIC STEAM BOILER CABINETS INSTALLATION – OPERATION – MAINTENANCE BLODGETT OVEN COMPANY www.blodgett.com 44 Lakeside Avenue, Burlington, Vermont 05401 USA Telephone (800) 331-5842, (802) 860-3700 Fax: (802) 864-0183 S00045 Rev A (5/04)

  • Blodgett CB24-24E, 2 IMPORTANT NOTES FOR INSTALLATION AND OPERATION It is recommended that this manual be read thoroughly and that all instructions be followed carefully. This is the safety alert symbol. It is used to alert you to potential personal injury hazards. Obey all safety messages that follow this symbol to avoid possible injury or death. WARNING: Improper installation, operation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing, operating or servicing this equipment. CAUTION: Operating, testing, and servicing should only be performed by qualified personnel. WARNIN

  • Blodgett CB24-24E, 3 . TABLE OF CONTENTS DESCRIPTION PAGE 1.0 Service Connections ................................................................................................ 4 2.0 Installation Instructions ............................................................................................. 5 3.0 Operating Instructions .............................................................................................. 8 4.0 CSD-1 Optional Feature ......................................................................................... 10 5.0 Periodic Maintenance ............................................

  • Blodgett CB24-24E, 4 2.0 SERVICE CONNECTIONS NOTE: PRESSURE REDUCING VALVE -OPTIONAL DIMENSIONS ARE IN INCHES [MM] S Field Wiring Electrical Connection to be as specified on data plate. STEAM TAKE-OFF CONNECTION: 3/4"IPS to operate adjacent equipment. COLD WATER: 3/8" O.D. tubing at 25-50 PSI(170-345 kPa) DRAIN: 2"IPS piped to open floor drain. No Solid Connection. HOT WATER: 3/8" O.D. tubing at 25-50 PSI(170-345 kPa) inches UNITS mm 540 21.25 5.75 146222 A 8.75 DIMENSIONS 16.75 425 BCD 584 23 EF 89 3.5 G 267 10.5 H 64 2.5 J 283 11.12 K 121 4.75 2.5 L 64 MP 222 8.75 18 457 WIDTH 36 914 24 610 inches mm 70 2.75 330 13 502 19.75 N 4.75 121 171 6.75 ELECTRICA

  • 5 2.0 INSTALLATION INSTRUCTIONS GENERAL The electric boiler is designed to ASME Code and approved as a steam heating boiler restricted to operation at pressure not to exceed 15 psi. Boilers are electrically rated as shown on page 4. Boiler may have optional CSD1 controls. UNPACKING Immediately after unpacking, check for possible shipping damage. If the appliance is fo

  • Blodgett CB24-24E, 6 LEVELING AND ANCHORING THE CABINET 1. Place appliance in the installation position. 2. Place a carpenter’s level on top of the appliance and turn the adjustable feet to level side-to-side and front-to-back. 3. Mark hole locations on the floor through the anchoring holes provided in the rear flanged adjustable feet. 4. Remove appliance from installation position and drill holes in locations marked on the floor. (See installation diagram on page 4.) Insert proper anchoring devices (not supplied). 5. Place appliance back in the installation position. 6. Place carpenter’s level on top of appliance and re-level side-to-side and front-to- back. 7. Bolt and anchor appliance sec

  • Blodgett CB24-24E, 7 EXHAUST HOOD An exhaust system should be located directly above the boiler to exhaust steam and heat generated by the boiler. PLUMBING CONNECTIONS (See Page 4) WARNING: Plumbing connections must comply with applicable sanitary, safety, and plumbing codes. Water Supply Connection The incoming cold water supply connection, at the rear of the boiler cabinet, requires 3/8" tubing and water pressure of 25 - 50 psig. A manual shut-off valve must be provided convenient to the boiler; this valve should be open when the boiler is in operation. Drain Connection The

  • Blodgett CB24-24E, 8 3.0 OPERATING INSTRUCTIONS For CSD-1 equipped boilers, see section 4.0 CSD-1 Optional Feature for proper operating instructions. BOILER CONTROLS (Inside Cabinet) Main Power Switch - ON fills the boiler tank and turns the boiler heaters on. You should allow 20 minutes to fill the tank and generate steam. - OFF shuts off the boiler heaters and opens the Automatic Blowdown Valve, emptying the boiler tank and releasing water and steam to the drain. This should be done daily to remove sediment, lime, or scale. Pilot Light - Ind

  • 9 4.0 CSD-1 OPTIONAL FEATURE OPERATING, TESTING, SERVICING AND CLEANING INSTRUCTIONS Start-up Procedure 1. Close the manual blowdown valve. 2. Open cabinet door and turn “ON” power switch. The green pilot light will come “ON.” Water will begin to enter the boiler. When enough water has entered the boiler, the (amber) “STANDBY” pilot light will come on. 1. Press th

  • 10 SAFETY LOCKOUT CONDITIONS High Temperature Condition A high temperature safety device is installed on the boiler. Should the temperature exceed the limit of this device, the boiler will be shut down and put in a state of lockout. The “TEMPERATURE” pilot light (red), and the “STANDBY” pilot light (amber), will come on. High Pressure Condition A high pressure safety switch is in

  • Blodgett CB24-24E, 11 5.0 PERIODIC MAINTENANCE Be sure to flush your boiler water level control daily. Failure to follow this procedure can cause the control to malfunction resulting in serious boiler damage. The Boiler Water Level Control installed on your boiler requires periodic maintenance. As boiler water circulates into the float chamber, sand, scale and other sediment may be deposited in the float chamber. While the chamber has been designed with a large accumulation bowl, it is necessary to flush the sediment from the chamber by blowing down the control so that the accumulation of sediment does not interfere with the movement of the float in the control. Contro

  • Blodgett CB24-24E, 12 PERIODIC MAINTENANCE (Continued) Continue draining water for about fifteen (15) seconds, from control until water is clean. Manually close valve. Recheck gauge glass. If water level has dropped significantly, wait for the boiler to restore water level and pressure and repeat if necessary. 1. Observe that the water in gauge glass is clean and clear. Extreme murkiness in water indicates inadequate water quality. 2. Safety valve should be tripped during operation once a week to assure that it functions properly. 3. Keep all exposed cleanable areas of unit clean at all times. CAUTION: Take extra caution when blowing down water level control or

  • Blodgett CB24-24E, 13 6.0 TROUBLESHOOTING Water not being supplied to boiler 1. Water supply is “OFF”. 2. Defective water fill solenoid. 3. Water level control clogged or defective, unable to operate fill valve. 4. Check drain valve is closed. 5. Supply water pressure too low. Automatic blowdown valve does not drain 1. Defective blowdown valve. 2. Heat exchanger build up of scalant clogging drain lines and valve. Boiler achieves pressure slower than normal 1. Heavy build up of lime on elements. 2. Loose element connections. Safety valve blows 1. Defective safety valve. 2. Pressure too high, pressure switch requires adjustment (lower) or may be defective. At least t

Related Products and Documents (Boiler):

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 Gigabyte M912 Operation & user’s manual gigabyte/m912-6ZM.pdf 06 Jan 2023 44 4.35 Mb
2 Sony CDP-CX230 - Compact Disc Changer Operating instructions manual sony/cdp-cx230-compact-disc-changer-4F3.pdf 14 Aug 2023 28 0.38 Mb
3 Phoenix Contact FL SWITCH LM 5TX Operation & user’s manual phoenix-contact/fl-switch-lm-5tx-5D8.pdf 23 Apr 2023 120
4 AT&T E5640 Quick start manual vtech/e5640-8C6.pdf 18 Apr 2023 4 1.95 Mb
5 Yamaha DD-10 Owner's manual yamaha/dd-10-DC2.pdf 18 Mar 2024 20 2.55 Mb
6 Thermo Scientific Barnstead Smart2Pure Operating instructions manual thermo-scientific/barnstead-smart2pure-584.pdf 15 Jul 2022 44

Similar Resources:

  • Weil-McLain

    382-200-300

    (2 pages)
    Part number 550-141-589/0501Front Section Repair KitPart Number 382-200-300 for Series 1 & 2Part Number 382-200-300 for Series 3 & 4GV BOILERGV BOILERGV BOILERGV BOILERGV BOILERReplacement InstructionsReplacement InstructionsReplacement InstructionsReplacement InstructionsReplacement InstructionsFailure to follow items below can cause severe personal …
  • Alpha Boilers

    AL357i-B

    (36 pages)
    Model AL357i-B Alpha Inset BoilerMulti Fuel and Wood Burning Inset Boiler StoveInstruction Manualwww.alphastoves.com- -Published September 2012Please note This appliance has been independently CE tested and approved for the burning of wood and multi fuels and must, at all times, be used in accordance with these instructions to ensure safe and effi cient ope …
  • Harsco Industrial

    n700

    (64 pages)
    ©1989-2012 Harsco Industrial, Patterson-Kelley Printed 11/4/2011THERM201_2-19-12 P-K THERMIFIC® GAS-FIRED BOILER Model#: __________________________ Serial#: __________________________ Start-up Date: __________________________ Harsco Industrial, Patterson-Kelley 100 Burson Street East Stroudsburg, PA 18301 Telephone: (570) 476-7261 Fax …
  • Hamworthy

    Melbury HE 530

    (38 pages)
    Manual Melbury GB.doc edition 12.2020 Hamworthy Heating Limited – Dorset BH17 ONF Installation and operating instructions Melbury HE, C 530 – 3000 …
  • Worcester

    12/18

    (73 pages)
    GREENSTAR CAMRAY EXTERNAL12/18, 18/25, 25/32FLOOR STANDING EXTERNAL OIL FIRED CONDENSING BOILER USINGBALANCED FLUE SYSTEMFOR FULLY PUMPED OPEN VENT OR SEALED CENTRAL HEATING SYSTEMS AND DOMESTIC HOT WATERCYLINDERTHE APPLIANCE IS FOR USE WITH 28 SECOND KEROSENEONLYINSTRUCTION MANUALINSTALLATION COMMISSIONING& SERVICINGGB …
  • IDEAL

    Imax Plus II F90

    (8 pages)
    users guideYour Ideal users guideSee reverse for installation & servicing guideENGINEERED FOR PEACE OF MINDWhen replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly author …

Comments, Questions and Opinions: