Cisco CISCO10720 Installation And Configuration Manual
|
Cisco CISCO10720, viii Cisco 10720 Internet Router Uplink Cards Installation and Configuration 78-13113-06 B0 Preface Organization This publication uses the following terminology to refer to the router and the uplink cards: ‘ Organization This document contains the following chapters: Product Name Reference Cisco 10720 Internet Router router OC-48/STM-16c SRP Uplink Module —Short Reach (SR) 2 km —Intermediate Reach (IR) 15 km —Long Reach 1 (LR1) 40 km —Long Reach 2 (LR2) 80 km uplink card or DPT uplink card OC-48/STM-16c POS/SRP Uplink Module —Short Reach (SR) 2 km —Intermediate Reach (IR) 15 km —Long Reach 1 (LR1) 40 km —Long Reach 2 (LR2) 80 km uplink card or POS/DPT uplink card O
Cisco CISCO10720, 3-20 Book Title 78-13113-06 B0 Chapter 3 Installing and Removing the Uplink Cards Turning On Power to the Router Figure 3-27 Power Switch in the Off Position Step 3 Verify that the power switch located on the front of the power supply is in the off (O) position. (See Figure 3-27.) Figure 3-28 Tightening the DC Lead Receptacle Step 4 Insert the stripped end of the ground lead all the way into the ground lead receptacle on the DC-input power supply and tighten the receptacle screw using a 1/8-inch flat-blade screwdriver. (See Figure 3-28.) Note Make sure the entire stripp
Cisco CISCO10720, 5-3 Book Title 78-13113-06 B0 Chapter 5 Troubleshooting the Uplink Cards LEDs The LEDs located on the right side of the uplink card provide system status information. Note Table 5-3 also indicates the system status of the card as it initializes. Table 5-2 POS/DPT Uplink Status LEDs LED Activity Description ACTIVE Green Port is active. Off Port is not active. CARRIER Green Framer has locked onto the SONET frames. Off Framer has not achieved lock. RX PACKET Green Packets are being received on the port
1-7 Book Title 78-13113-06 B0 Chapter 1 Overview and Specifications Console/Auxiliary Card Faceplate and Specifications Additional feature information is available online in the Cisco IOS Software Configuration for the Cisco 10720 Internet Router document and in the Cisco 10720 Internet Router Installation and Configuration Guide, and the IEEE 802.17 R
Cisco CISCO10720, 5-13 Book Title 78-13113-06 B0 Chapter 5 Troubleshooting the Uplink Cards Troubleshooting the Uplink Cards Installation SRP1/1 wrapped on side B (side A Self Detect Wait to Restore [WTR]) Wrap cleared, node initiated Wait to Restore (WTR) state WTR period is 10 to 360 seconds (user configured), node will unwrap at end of WTR. None. SRP1/1 wrapped on side B (side A Span Neighbor Forced Switch) Neighbor node Forced Switch initiated by user; Node wrap to protect failed span User initiated, none. SRP1/1 wrapped on side B (side A Span Neighbor Manual Switch) Neighbor node Manual Switch initiated by user; Node wrap User in
3-19 Book Title 78-13113-06 B0 Chapter 3 Installing and Removing the Uplink Cards Turning On Power to the Router Figure 3-26 Power Switch in the On Position Step 5 Press the power switch to on the (–) position. (See Figure 3-26.) Connecting the DC Power Supply Warning When you install the unit, the ground connection must always be made first and disconnected last. Warning Befor
Cisco CISCO10720, CHAPTER 2-1 Book Title 78-13113-06 B0 2 Preparing for Installation Installation prerequisites and preparation information for installing an uplink card in a Cisco 10720 router are in the following sections: • Hardware Requirements, page 2-1 • Software Requirements, page 2-2 • Safety and Compliance, page 2-3 Hardware Requirements Ensure that your equipment configuration meets the minimum requirements for the uplink card installation and that you have all the parts and tools you need. To ensure compatibility with the Cisco IOS software, your DPT or POS/DPT uplink card should have a hardware revision level of 73-05345-03 Rev. A0 or highe
Cisco CISCO10720, CHAPTER 5-1 Book Title 78-13113-06 B0 5 Troubleshooting the Uplink Cards This chapter contains the following sections: • Verifying the Uplink Card Connection, page 5-1 • LEDs, page 5-2 • Troubleshooting the Uplink Cards Installation, page 5-6 • Troubleshooting the RPR/SRP Uplink Card Installation, page 5-14 • Troubleshooting the RPR/SRP Uplink Card Installation, page 5-14 • Additional Troubleshooting Resources, page 5-17 • Cleaning the Fiber-Optic Connections, page 5-17 Verifying the Uplink Card Connection Read the following troubleshooting tips to help verify a successful uplink card connection with the system: • Verify LED status by checking uplink card LED
Cisco CISCO10720, CHAPTER 3-1 Book Title 78-13113-06 B0 3 Installing and Removing the Uplink Cards This chapter provides information about installing and removing the uplink cards. The following sections are in this chapter: • Tools and Equipment Required, page 3-1 • Preparing for Installation, page 3-2 • Removing the Cable-Management System, page 3-4 • Removing the Uplink Card, page 3-8 • Installing an Uplink Card, page 3-9 • SONET Distance Information for RPR/SRP, DPT, and POS/DPT Uplink Cards, page 3-11 • Connecting
Cisco CISCO10720, 4-2 Book Title 78-13113-06 B0 Chapter 4 Creating a Four-Node Ring Using the Uplink Cards DPT Uplink Card Step 1 Install a DPT uplink card in a Cisco 10720 Internet Router on the network. Step 2 Choose a router with a DPT uplink card to become Node 1 in the four-node DPT ring. Step 3 Add nodes to the ring by connecting the receive (RX) and transmit (TX) cables. The RX port on one DPT uplink card must be connected to a TX port on the next DPT uplink card. Figure 4-2 provides a view of the network when a four-node DPT ring is created. Table 4-1 Cable Co
Cisco CISCO10720, 3-23 Book Title 78-13113-06 B0 Chapter 3 Installing and Removing the Uplink Cards Verifying Uplink Card Functionality Verifying Uplink Card Functionality Observe the LEDs card is initialized (see Figure 3-31) and consult the LED tables in Chapter 5, “Troubleshooting the Uplink Cards,” to verify the status of the card. The console/auxiliary card contains only the four system LEDs on the right side of the card. Figure 3-31 DPT and POS/DPT Uplink Card LEDs (Left) and System LEDs (Right) Figure 3-32 RPR/SRP Uplink Card LEDs (Left) and Sy
Cisco CISCO10720, 5-17 Book Title 78-13113-06 B0 Chapter 5 Troubleshooting the Uplink Cards Additional Troubleshooting Resources Loopback Testing The POS uplink card supports two loopback modes for network testing, fault isolation, and agency compliance. The uplink card loopback modes are: Internal loopback mode—Packets sent from the Cisco 10720 Internet Router out of the uplink card POS port TX optics are also looped back into the Cisco 10720 Internet Router. Line loopback mode—Packets received by the POS uplink card port RX optics and sent into the Cisco 10720 Internet Router are also looped back out of the uplink c
Cisco CISCO10720, 3-14 Book Title 78-13113-06 B0 Chapter 3 Installing and Removing the Uplink Cards Connecting the Ports on the RPR/SRP, DPT, and POS/DPT Uplink Cards Figure 3-18 RPR/SRP Uplink Card Ports If you are connecting to an RPR/SRP network, the two ports represent the two sides of a single RPR or SRP connection: • Span West in RPR mode, side A in SRP mode (see Figure 3-18) • Span East in RPR mode, side B in SRP mode (see Figure 3-18) The left side of each port is TX and the right side of each
ix Cisco 10720 Internet Router Uplink Cards Installation and Configuration 78-13113-06 B0 Preface Electromagnetic Compliance Electromagnetic Compliance Electromagnetic compliance information is presented in the following sections: • Electromagnetic Compatibility Regulatory Statements, page ix • Site Wiring Distance and Interference Guidelines, page ix Electromagnetic Compatibility Regul
2-5 Book Title 78-13113-06 B0 Chapter 2 Preparing for Installation Safety and Compliance Following are guidelines for preventing ESD damage: • Always use an ESD-preventive wrist or ankle strap and ensure that it makes good skin contact. Connect the equipment end of the connection cord to bare metal on the router chassis. (See Figure 2-1.) • Attach an ESD-preventive wri
Cisco CISCO10720, 1-6 Book Title 78-13113-06 B0 Chapter 1 Overview and Specifications Optical Cable Specifications Optical Cable Specifications Table 1-7 provides optical cable specifications for the uplink cards. Table 1-5 OC48 SFP Module Specifications for the RPR/SRP Uplink Card Specification Description Dimensions (H x W x D) 0.34 in. x 0.54 in. x 2.2 in. (8.6 mm x 13.7 mm x 56.5 mm) Connectors LC-type connector Wavelength SFP-OC48-SR—1310 nm SFP-OC48-IR1—1310 nm OC48-SFP-LR2—1550 nm Cabling Distance (maximum) 1 1. Opti
Cisco CISCO10720, 3-5 Book Title 78-13113-06 B0 Chapter 3 Installing and Removing the Uplink Cards Removing the Cable-Management System Note It is not necessary to remove the cable-management tray in order to install or remove an uplink card. Only the cable-management cover must be removed in order to install or remove an uplink card. If the cable-management cover is not installed, go to the “Powering Down the Router” section on page 3-2. Perform the following steps to remove the cable-management cover: Figure 3-4 Removing the Cable-Management Cover Step 1 Verify that all cables are safe
Cisco CISCO10720, xiv Cisco 10720 Internet Router Uplink Cards Installation and Configuration 78-13113-06 B0 Preface Obtaining Technical Assistance Reporting Security Problems in Cisco Products Cisco is committed to delivering secure products. We test our products internally before we release them, and we strive to correct all vulnerabilities quickly. If you think that you have identified a vulnerability in a Cisco product, contact PSIRT: • For Emergencies only—[email protected] An emergency is either a condition in which a system is under active attack or a condition for which a severe and urgent security vulnerability should be reported. All other conditions are considered nonem
Cisco CISCO10720, 5-14 Book Title 78-13113-06 B0 Chapter 5 Troubleshooting the Uplink Cards Troubleshooting the RPR/SRP Uplink Card Installation Troubleshooting the RPR/SRP Uplink Card Installation Use the transceiver keyword to display additional information about the status of the small form-factor pluggable (SFP) module used in an RPR port. Router# show controllers rpr-ieee 1/1 transceiver Show Transceiver: West Span Static information ID: SFP transceiver Extended ID: 4 Connector: LC SONET compliance: OC48SR Gigabit Ethernet compliance: unspecified Fibre Channel lin
Cisco CISCO10720, 5-5 Book Title 78-13113-06 B0 Chapter 5 Troubleshooting the Uplink Cards LEDs The LEDs located on the right side of the uplink card provide system status information. Note Table 5-5 also indicates the system status of the card as it initializes. PROTECT Green Remote wrap. Off No wrap. Amber Local wrap. Blinking green Remote steer. Blinking amber Local steer. Table 5-4 RPR/SRP Uplink Status LEDs (continued) LED Activity Description Table 5-5 RPR/SRP Uplink Card System LEDs LED Activity Description OVERTEMP Green (default status when initialized) System is operating within the proper temperature range. (inlet <104 o F [40 o C]; outlet <109 o F [43 o C]) Amber/green Both LEDs
5-2 Book Title 78-13113-06 B0 Chapter 5 Troubleshooting the Uplink Cards LEDs LEDs The following LED information is found in this section: • DPT and POS/DPT Uplink Card LEDs, page 5-2 • RPR/SRP Uplink Card LEDs, page 5-4 DPT and POS/DPT Uplink Card LEDs Information on both uplink card specific LEDs and system LEDs for the DPT and POS/DPT uplink cards is in this section. The LEDs
Cisco CISCO10720, CHAPTER 1-1 Book Title 78-13113-06 B0 1 Overview and Specifications This publication contains instructions for installing and configuring the OC-48 RPR/SRP, OC-48/STM-16c DPT, and OC-48/STM-16c POS uplink cards as well as the console/auxiliary card on the Cisco 10720 Internet Router. Refer to the Cisco 10720 Internet Router Installation and Configuration Guide for more information about this product line, and the Cisco IOS Software Configuration Guide for the Cisco 10720 Internet Router For the software information about the OC-48 RPR/SRP uplink card, refer to the IEEE 802.17 Resilient Packet Ring Feature Guide. The following information is found in this chapter: • Pr
Cisco CISCO10720, THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS. THE SOFTWARE LICENSE AND LIMITED WARRANTY FOR THE ACCOMPANYING PRODUCT ARE SET FORTH IN THE INFORMATION PACKET THAT SHIPPED WITH THE PRODUCT AND ARE INCORPORA
Cisco DPC3825 Network Router Operation & user’s manual
DPC3825 |
Cisco 10008 Network Router Hardware installation manual
10008 |
Cisco 1805 Network Router Hardware installation manual
1805 |
Cisco 3750G-12S-E - Catalyst Switch - Stackable Network Router Product support bulletin
3750G-12S-E - Catalyst Switch - Stackable |
Cisco 3251 Network Router Datasheet
3251 |
Cisco 2800 Series Network Router Datasheet
2800 Series |
Cisco Catalyst 3750-X Network Router Command reference manual
Catalyst 3750-X |
Cisco 1805 Network Router Datasheet
1805 |
# | Manufacturer | Model | Document Type | File | Updated | Pages | Size |
---|---|---|---|---|---|---|---|
1 | Panasonic | TX-P42X50B | Operating instructions manual | panasonic/tx-p42x50b-D36.pdf | 21 Sep 2022 | 84 | 3.82 Mb |
2 | Hotpoint | HSS25IETAWW and | Owner's manual and installation instructions | hotpoint/hss25ietaww-and-A15.pdf | 23 Jul 2022 | 64 | 6.05 Mb |
3 | MGE UPS Systems | FlexPDU 12 IEC | Installation and user manual | mge-ups-systems/flexpdu-12-iec-NGW.pdf | 30 Mar 2023 | 12 | |
4 | MINOLTA-QMS | PagePro 4110W | Quick start manual | minolta-qms/pagepro-4110w-W7J.pdf | 13 Oct 2022 | 22 | |
5 | SMART | MN600 Cinema STEREOCHECK | Manual | smart/mn600-cinema-stereocheck-GN8.pdf | 12 Mar 2024 | 1 | 0.1 Mb |
6 | Regalo | 2660 | Owner's manual | regalo/2660-G8K.pdf | 17 Nov 2022 | 10 | 0.9 Mb |
Unboxing
Quick Installation Guide 24-port 10/1 OOM Ethernet Web-Smart PoE switch with 2 copper gigabit RJ-45 ports and 2 gigabit SFP ports (af Version 15.4W) . . . . . . • -L.I...I....:...t...:....:...:. r.__:__:_:__]-~ • • ~'"~ .. rT":"':"l ..... l .. . . _· • Table of Contents • Introduction ....................... …
POE-24MB2G-M(9 pages) |
Siemens
RUGGEDCOM RS940GInstallation Guide4/2014PrefaceIntroduction1Installing the Device2Communication Ports3Technical Specifications4Dimension Drawings5Certification6RC1036-EN-03
…
RUGGEDCOM RS940G(36 pages) |
Huawei
Quick Start GuideGuide de démarrage rapideSchnellstartanleitungGuida di avvio rapidoSnelstartgidsGuia de Início RápidoGuía de inicio rápidoInstrukcja obsługiSnabbstartguideHurtigveiledningKort startvejledningAloitusopasКороткий посібникGhid de pornire rapidăStručný návod k obsluzeWiFi Yönlendirici Hızlı Kullanım KılavuzuKratko …
WS8800(64 pages) |
D-Link
WIRELESS N 300 CLOUD ROUTERDIR-619LQUICK INSTALLATION GUIDE快速安裝指南� …
DIR-619L(52 pages) |
3onedata
- 1 - IES6116 Series Managed Industrial Ethernet Switch User manual Shenzhen 3onedata Technology Co., Ltd. Tel: +86-755-26702668 Fax: +86-755-26703485 www.3onedata.com 【Summarize】 IES6116 series is an industrial grade, managed and redundancy Ethernet switch. The IES6116 industrial Ethernet switches consists of 16 Ethernet ports. The I …
IES6116-2F-P(5 pages) |
Sanyo
SHA-LN16UAB LonWorks Interface: Building Maintenance IntegrationECO-i™ Submittal DataJob Name:Location:Engineer:Submitted to:Submitted by:Reference:Approval:Date:Construction:Unit #:Drawing #:Sanyo Commercial SolutionsA Division of SANYO North America1300 Michael Drive, Suite A Wood Dale, IL 60191 USAwww.sanyohvac.comFeatures/Benefits Schedule Time Setti …
ECO-i SHA-LN16UAB(1 pages) |
Panasonic Camcorder Palmcorder PV-A216Operation & user’s manual for Panasonic Palmcorder PV-A216 Camcorder Palmcorder PV-A216, 36 |
Etón Subwoofer MOVE 10-300A#W6Z9GI: MOVE 10-300A Subwoofer Installation operation user manual MOVE 10-300A, 8 |
Cebora Welding System SOUND MIG 3840/T PulseCebora Welding System SOUND MIG 3840/T Pulse Service manual SOUND MIG 3840/T Pulse, 54 |
HP Desktop Workstation x1000Workstation x1000 Installation instructions - 24667I Workstation x1000, 4 |
Honeywell Humidifier HE365VPIAQ - Furnace Humidifier Fan 4200 VisionPro#V2M7J3 HE365VPIAQ - Furnace Humidifier Fan 4200 VisionPro: Honeywell Humidifier Owner Documentation HE365VPIAQ - Furnace Humidifier Fan 4200 VisionPro, 8 |
Eaton Power Supply Power Xpert SeriesPower Supply PDF Installation and operation manual Power Xpert Series, 156 |
Tripp Lite Power Supply BP192V12-3UTripp Lite BP192V12-3U User Guide (Specification sheet), @43625Y BP192V12-3U, 2 |
Ericsson Modem W20Ericsson W20 User Manual (Doc Type: Modem Quick installation manual) W20, 10 |
Timex Sinclair Printer 2040PDF User Guide (@P4WS3T), Timex Sinclair 2040 Printer (19th Oct 2023) 2040, 8 |
Protemp Heater Protemp PT-45-KFAProtemp Protemp PT-45-KFA Manual (Doc Type: Heater User's manual & operating instructions) Protemp PT-45-KFA, 14 |
Powermate Air Compressor 200-2645Powermate 200-2645 User Guide (Doc Type: Air Compressor Operator's & parts manual) 200-2645, 20 |
Epson Printer STYLUS900 - Stylus Color 900 Inkjet Printer#4M69FS: STYLUS900 - Stylus Color 900 Inkjet Printer Printer Product support bulletin STYLUS900 - Stylus Color 900 Inkjet Printer, 4 |