Manualios.com

GE 20 Owner's Manual And Installation Instructions

  • 20 Freezer
  • maAGBceIm1dW6
  • Owner's Manual And Installation Instructions
  • PDF / Adobe Acrobat Reader
  • 41

GE 20 Manual Online:

4.7, 1151 votes
GE 20 User Manual
GE 20 User Guide
GE 20 Online Manual

Text of GE 20 User Guide:

  • GE 20, 29 Installation Instructions REHANG REFRIGERATOR DOOR Lower the refrigerator door onto the center hinge pin. Insert the top hinge pin into the hinge hole on top of the refrigerator door. Make sure the door is aligned with the cabinet. Attach the hinge to the top of the cabinet loosely with the bolts. Make sure the gasket on the door is flush against the cabinet and is not folded. Support the door on the handle side and make sure the door is straight and the gap between the doors is even across the front. While holding the door in place, tighten the top hinge screws. Replace the hinge cover. 12 A B C

  • GE 20, ATTACH REFRIGERATOR DOOR HANDLE Look for an arrow label on the front of the handle. If the door mounting screws are located on the left side of the door, hold the handle so the arrow points to the right (arrow is at the top of the handle). If the door mounting screws are located on the right side of the door, hold the handle so the arrow points to the left (arrow is at the bottom of the handle). Align keyhole slots on the top and bottom of the back of the handle with the screws mounted on the front of the door. Press the handle against the door front,

  • GE 20, 17 Installation Instructions INSTALLING THE REFRIGERATOR REFRIGERATOR LOCATION • Do not install the refrigerator where the temperature will go below 60°F (16°C) because it will not run often enough to maintain proper temperatures. • Do not install the refrigerator where the temperature will go above 100°F (37°C) because it will not perform properly. • Install it on a floor strong enough to support it fully loaded. CLEARANCES Allow the following clearances for ease of installation, proper air circulation and plumbing and electrical connections. Sides 1/8″ (4 mm) Top 1″ (25 mm) Back 1″ (25 mm) CONNECTING THE

  • GE 20, 23 Installation Instructions REPLACING THE FREEZER DRAWER (on some models) ATTACH AND SECURE THE DRAWER FRONT TO THE SLIDES Pull out the rail assemblies to the full length on each side of the cabinet. Locate the slots on the inside of the rail assemblies near the back. Insert the hooks at the back of the drawer railings into the slots on the rail assemblies. Lower the front of the drawer, making sure the tabs on the sides of the railings fit into the front slots in the rail assemblies. 1 A B D C REPLACE THE FREEZER BASKET Replace the lower freezer basket by lowering it into the frame. 2 Two people may be required to complete this procedure. ATTACH AND SECURE THE

  • GE 20, Installation Instructions REVERSING THE DOOR SWING (cont.) TRANSFER REFRIGERATOR DOOR HANDLE TO RIGHT In order to correctly install the handle on the right side, place a small piece of masking tape near the top of the handle before removing. Grasp the handle tightly with both hands and slide the handle up (this may require some force). The keyhole slots on the back of the handle allow the handle to separate from the mounting screws. Using an adjustable wrench, remove the handle mounting screws. Carefully pry off the logo badge and plug button. Remove

  • GE 20, Installation Instructions REMOVE THE CENTER HINGE PIN On models with a freezer door, tape the door shut with masking tape. Using an adjustable wrench, remove the center hinge pin. 2 A B REMOVE THE FREEZER DOOR (freezer door models) Remove the tape and tilt the door away from the cabinet. Lift the door off the bottom hinge pin. NOTE: There is a plastic washer between the hinge and the top of the freezer door. Do not lose. Set the door on a non-scratching surface with the inside up. 3 A B REMOVE CENTER HINGE Using an adjustable wrenc

  • GE 20, Freezer Shelves and Baskets Depending on your model, your freezer may feature: A deep full-width basket A shallow full-width basket A half-width basket A full-width wire shelf A shelf above the ice storage bin Basket/Shelf Removal To remove the deep full-width baskets on freezer door models, the shallow full-width basket and the full-width wire shelf: Pull the basket/shelf out to the stop location. Lift the front up and over the stop location. Lift the basket/shelf up and out. To remove the deep full-width basket on freezer drawer models: Open the freezer drawer until it

  • GE 20, 33 Normal operating sounds. GEAppliances.com Before you call for service… Troubleshooting Tips Save time and money! Review the charts on the following pages first and you may not need to call for service. Problem Possible Causes What To Do Refrigerator does not Refrigerator in defrost cycle. • Wait about 30 minutes for defrost cycle to end. operate Control in 0 (off) position. •Move the control to a temperature setting. Refrigerator is unplugged. • Push the plug completely into the outlet. The fuse is blown/circuit • Replace fuse or reset

  • GE 20, Installation Instructions 21 SET THE CONTROLS Set the controls to the recommended setting. 8 START THE ICEMAKER (icemaker models) Set the icemaker power switch to the I (on) position. The icemaker will not begin to operate until it reaches its operating temperature of 15°F (–9°C) or below. It will then begin operation automatically. It will take 2–3 days to fill the ice bin. NOTE: In lower water pressure conditions, the water valve may turn on up to 3 times to deliver enough water to the icemaker. 9 Power switch

  • IMPORTANT SAFETY INFORMATION. READ ALL INSTRUCTIONS BEFORE USING. WARNING! Use this appliance only for its intended purpose as described in this Owner’s Manual. SAFETY PRECAUTIONS When using electrical appliances, basic safety precautions should be followed, including the following: ■ ■ This refrigerator must be properly installed and located in accordance with th

  • GE 20, 39 Manufactured for: General Electric Company, Louisville, KY 40225 Performance Data Sheet SmartWater Filtration System GSWF Cartridge This system has been tested according to NSF/ANSI 42/53 for reduction of the substances listed below. The concentration of the indicated substances in water entering the system was reduced to a concentration less than or equal to the permissible limit for water leaving the system, as specified in NSF/ANSI 42/53.* (100% safety factors built in for unmetered usage) Standard No. 42: Aesthetic Effects Parameter USEPA Influent Influent Challenge Effluent % Reduction Min. Required MCL Average Concentration Average Maximum

  • TOOLS YOU WILL NEED 24 Installation Instructions REVERSING THE DOOR SWING IMPORTANT NOTES When reversing the door swing: • Read the instructions all the way through before starting. • Handle parts carefully to avoid scratching paint. • Set screws down by their related parts to avoid using them in the wrong places. • Provide a non-scratching work surface for

  • Refrigerator Lights CAUTION: Light bulbs may be hot. Unplug the refrigerator. The bulbs are located at the top of the refrigerator compartment behind the controls. To remove the light shield, grasp the shield at the back and pull out to release the tabs at the back. Rotate the shield down and then forward to release the tabs at the front of the shield. After replacing wi

  • GE 20, Consumer SupportTroubleshooting TipsOperating InstructionsSafety Instructions Installation Instructions Care and cleaning of the refrigerator. GEAppliances.com 13 Cleaning the Outside The door handles and trim. Clean with a cloth dampened with soapy water. Dry with a soft cloth. Do not use wax on the door handles and trim. Keep the outside clean. Wipe with a clean cloth lightly dampened with kitchen appliance wax or mild liquid dish detergent. Dry and polish with a clean, soft cloth. Do not wipe the refrigerator with a soiled dish cloth or wet towel. These may leave a residue that can erode the paint. Do not use scouring pads, po

  • GE 20, Installation Instructions INSTALLING THE WATER LINE (ICEMAKER MODELS) 30 Recommended copper water supply kits are WX8X2, WX8X3 or WX8X4, depending on the amount of tubing you need. Approved plastic water supply lines are GE SmartConnect ™ Refrigerator Tubing (WX08X10002, WX08X10006, WX08X10015 and WX08X10025). When connecting your refrigerator to a GE Reverse Osmosis Water System, the only approved installation is with a GE RVKit. For other reverse osmosis water systems, follow the manufacturer’s recommendations. If the water supply to the refrigerator is from a Reverse Osmosis Water Filtration System AN

  • GE 20, 35 General Electric Company Warranty Registration Department P.O. Box 32150 Louisville, KY 40232-2150 GE Service Protection Plus ™ GE, a name recognized worldwide for quality and dependability, offers you Service Protection Plus ™ —comprehensive protection on all your appliances— No Matter What Brand! Benefits Include: • Backed by GE • All brands covered • Unlimited service calls • All parts and labor costs included • No out-of-pocket expenses • No hidden deductibles • One 800 number to call You

  • Consumer Support. GE Appliances Website In the U.S.: GEAppliances.com Have a question or need assistance with your appliance? Try the GE Appliances Website 24 hours a day, any day of the year! For greater convenience and faster service, you can now download Owner’s Manuals, order parts, catalogs, or even schedule service on-line. You can also “Ask Our Team of Experts ™ ” your

  • 27 Installation Instructions INSTALL CENTER HINGE Transfer the plug button and screws in the hinge holes on the left side to the right side. Install the center hinge on the left side. 7 A B INSTALL CENTER HINGE PIN Install the center hinge pin. NOTE: On models with a freezer door, be sure to put the washer between the top of the freezer door and the bottom of the center

  • GE 20, Consumer Support Troubleshooting Tips Operating Instructions Safety InstructionsInstallation Instructions About the crispers and pans. Not all features are on all models. Fruit and Vegetable Crisper Excess water that may accumulate in the bottom of the drawers or under the drawers should be wiped dry. Adjustable Humidity Crisper (on some models) Slide the control all the way to the HIGH setting to provide high humidity recommended for most vegetables. Slide the control all the way to the LOW setting to provide lower humidity levels recommended for most fruits. Snack Pan (on some models) This pa

  • GE 20, About the automatic icemaker. 12 Automatic Icemaker (on some models) The icemaker will produce seven cubes per cycle—approximately 100–130 cubes in a 24-hour period, depending on freezer compartment temperature, room temperature, number of door openings and other use conditions. See below for how to access ice and reach the power switch. If the refrigerator is operated before the water connection is made to the icemaker, set the power switch in the O (off) position. When the refrigerator has b

  • GE 20, 14 Consumer Support Troubleshooting Tips Operating Instructions Safety InstructionsInstallation Instructions For long vacations or absences, remove food and unplug the refrigerator. Move the freezer control to the 0 (off) position, and clean the interior with a baking soda solution of one tablespoon (15 ml) of baking soda to one quart (1 liter) of water. Leave the doors open. Set the icemaker power switch to the O (off) position and shut off the water supply to the refrigerator. If the temperature can drop below freezing, have a qualified servicer drain the water supply system (on some models) to prevent serious property damage due to floodi

  • GE 20, GEAppliances.com Refrigerators Bottom Freezer 3828JL8012A 197D4618P002 49-60282 05-03 JR Safety Instructions . . . . . . . . . . .2–4 Operating Instructions Additional Features . . . . . . . . . . . . .9 Automatic Icemaker . . . . . . . . . . .12 Controls . . . . . . . . . . . . . . . . . . . .5, 6 Crispers and Pans . . . . . . . . . . . . .10 Freezer . . . . . . . . . . . . . . . . . . . . . .11 Shelves and Bins . . . . . . . . . . . . .8, 9 Water Filter . . . . . . . . . . . . . . . . . . .7 C

  • GE 20, Consumer Support Troubleshooting Tips Operating Instructions Safety InstructionsInstallation Instructions About the controls with numbered settings. Initially, set the refrigerator control at 5 and the freezer control at 5 and allow 24 hours for the temperature to stabilize. Several adjustments may be required. Adjust the controls one increment at a time, and allow 24 hours after each adjustment for the refrigerator to reach the temperature you have set. Setting either or both controls to 0 stops cooling in both the refrigerator and freezer compartments, but does not shut off electrical power to the refrigerator. NOTE: The refrigerator is shipped wit

  • GE 20, About the water filter. (on some models) GEAppliances.com 7 Water Filter Cartridge The water filter cartridge is located in the back upper right corner of the refrigerator compartment. When to Replace the Filter The filter cartridge should be replaced every six months or earlier if you notice your ice cubes becoming smaller. Installing the Filter Cartridge If you are replacing the cartridge, first remove the old one. Open the cartridge cover by pressing in on the tab at the front and pulling down. Remove the ca

  • GE 20, Installation Instructions INSTALLING THE WATER LINE (CONT.) 32 Place the compression nut and ferrule (sleeve) for copper tubing onto the end of the tubing and connect it to the shutoff valve. Make sure the tubing is fully inserted into the valve. Tighten the compression nut securely. For plastic tubing from a GE SmartConnect ™ Refrigerator Tubing kit, insert the molded end of the tubing into the shutoff valve and tighten compression nut until it is hand tight, then tighten one additional turn with a wrench. Overtigh

  • GE 20, 22 Installation Instructions REMOVING THE FREEZER DRAWER (on some models) REMOVE THE BASKET Open the freezer drawer until it stops. The freezer basket rests on a frame inside the freezer drawer. Lift the basket up at the back. Lift the front up and lift the entire basket up and out of the drawer. 1 A B C REMOVE THE LEVELING LEGS (if needed) If, after removing the freezer drawer and refrigerator door, the refrigerator will still not fit through a doorway, the leveling leg brackets can be removed. Remove the base grille by grasping it at the bottom and pulling it straight out. Remove both brackets with a 3/8″ hex head driver. 3 The freezer drawer can be re

Related Products and Documents (Freezer):

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 Renesas HA31005ANP Specification sheet renesas/ha31005anp-43L.pdf 18 Sep 2023 8 0.12 Mb
2 Calix BC 60 Assembly instructions calix/bc-60-5V1.pdf 30 Jun 2022 4
3 AT&T 1477/1177 Operation & user’s manual at-t/1477-1177-LMH.pdf 01 Feb 2024 47 5.54 Mb
4 Duerkopp Adler 768 Operating manual duerkopp-adler/768-6EL.pdf 28 Jun 2022 28 1.21 Mb
5 Campbell Hausfeld 34 Clipped Head Framing Nailer JB349500 Replacement parts manual campbell-hausfeld/34-clipped-head-framing-nailer-jb349500-E8R.pdf 25 Aug 2023 4 0.24 Mb
6 KitchenAid KBLS22KWMS Energy manual kitchenaid/kbls22kwms-W61.pdf 08 Nov 2022 1

Similar Resources:

  • Midea

    MRC04M3AWW

    (14 pages)
    设 计 DESIGN 周军2019.7.30校 对 CO.BY 图号/物料编码 PART NO. 标准化 STANDARD图纸名称 PART NAME MIDEA美国家扇形面板冷柜通用说明书业务 seller 徐天梅周军图样标记 REL 版本号REV.NO. 重量(g) WEIGHT 比例scale材料 MATERIAL 80g双胶纸批 准 AUTHORIZE 共 页 TOTAL SHEETS 第 页 NO. OF SHEETS 美的冰箱事业 …
  • Danby

    DKC052BSLDB

    (45 pages)
    Model • Modèle • Modelo 20.01.14• Owner’s Use and Care Guide• Guide d’utilisation et d'entretien• Manual de instruccionesKEG COOLERGLACIÈRE DE BIÈRE PRESSIONBARRIL REFRIGERADORDKC052BSLDBDanby Products Limited, Ontario, Canada N1H 6Z9Danby Products Inc., Findlay, Ohio, USA 45840 …
  • Viking

    DDRB304

    (9 pages)
    REFRIGERATION Built-In 30”W. All Refrigerator PLANNING AND DESIGN GUIDEVIKINGRANGE.COM • 1-888-VIKING1RELEASED 12/1/07©2007 VRC—INFORMATION SUBJECT TO CHANGE All models include• Capacity—18.2 cu. ft. (515.1 L)o 84”H./24”D.• ProChill™ Temperature Management System oVariable-speed single compressorsystem includes the quietest, mosttechn …
  • True Fitness

    TS-49

    (2 pages)
    Specifi cations subject to change without notice.Chart dimensions rounded up to the nearest 1/8" (millimeters rounded up to next whole number).ROUGH-IN DATASt. Charles Industrial Center • P.O. Box 970 • O’Fallon, Missouri 63366(636)240-2400 • FAX (636)272-2408 • (800)325-6152 • www.truemfg.comParts Dept. (800)424-TRUE • Parts Dept. FAX# ( …
  • Whirlpool

    UPRIGHT FREEZER

    (24 pages)
    UPRIGHT FREEZERUse & Care GuideFor questions about features, operation/performanceparts, accessories or service, call: 1-800-253-1301.In Canada, call for assistance 1-800-461-5681, for installationand service, call: 1-800-807-6777or visit our website at...www.whirlpool.com or www.whirlpool.com/canadaCONGÉLATEURSVERTICAUXGuide d’utilisation et d’entr …
  • Dometic

    CFX Series

    (364 pages)
    CFX28, CFX35W, CFX40W, CFX50W, CFX65WCompressor CoolerOperating manual . . . . . . . . . . . . . . . . . . . . . 7Kompressor-KühlboxBedienungsanleitung . . . . . . . . . . . . . . . . .28Glacière à compressionNotice d’utilisation . . . . . . . . . . . . . . . . . . . 51Nevera por compresorInstrucciones de uso . . . . . . . . . . . . . . . . . .74Gelei …

Comments, Questions and Opinions: