Siemens Simatic S7-300 Getting Started
|
Siemens Simatic S7-300, 1 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 Contents 1 Welcome. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2 Preparing the PC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 3 Installing and wiring the hardware. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 3.1 What components are required? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Siemens Simatic S7-300, 21 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 Wiring the motor 1. Connect the power supply for the digital inputs. / 0 / 0 / 1 / 0
5 Opening the program on the PC 48 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 5.2 Opening a program The program for controlling the conveyor belt is stored in the “conveyor” project. 1. Open the program. The program appears in the form of ladder logic (LAD). The operations are rep- resented as graphical symbols. LAD is a graphic
Siemens Simatic S7-300, 8 Additional information 60 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 8.2 Additional documentation For STEP 7 Lite and the PC Adapter USB: You will find the following documents on the CD and, after installation of STEP 7 Lite, via the start menu “Start > SIMATIC > Documentation > English”: • The electronic “Getting Started with STEP 7 Lite” Manual describes the main operating sequences using hands-on exercises. • The electronic “Programming with STEP 7 Lite” Manual imparts background knowledge for implementing control tasks with STEP 7 Lite. • The electronic “PC Adapter USB” Manual desc
Siemens Simatic S7-300, 4 Configuring the control in STEP 7 Lite 42 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 4.5 Downloading and checking the module configuration to the CPU 312C Before you download the module configuration to the CPU 312C, you will delete the old configuration from the CPU. After downloading, you will check whether downloadable system data were able to be generated from your module configu- ration. Performing a memory reset on the CPU 312C 1. Delete the old program blocks and configurations from the CPU 312C.
Siemens Simatic S7-300, 35 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 4.3 Reproducing the module configuration in STEP 7 Lite In the STEP 7 Lite project, you will create all of the modules you installed on the mounting rail. Creating the module configuration 1. Create a new S7-300 station. Four mounting rails are automatically displayed.
Siemens Simatic S7-300, 57 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 With the completion of the test run, you have successfully performed the tasks in “S7-300 Getting Started - First Time User” and have created an executable con- trol for your plant. If you wish, you can add to the control on your own and implement your own control tasks. Want to know more about SIMATIC S7-300? Contact us. Additional information is available through our Service & Support. Visit us on the Internet at: http:/
6 Performing a test run 54 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 4. Release the momentary contact switch for clockwise rotation and press and hold down the momen- tary contact switch for counter- clockwise rotation. The output LED 0.5 lights up. The input LED 0.3 lights up. 5. Release the momentary con
Siemens Simatic S7-300, 53 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 2. Press the green momentary con- tact switch to start the motor. The output LED 0.3 lights up and remains lit. The input LED 0.0 lights up briefly when the momentary contact switch is activated. The motor is ready to start. 3. Press and hold down the momen- tary contact switch for clockwise rotation. The output LED 0.0 lights up. The input LED 0.2 lights up. 287 '2 ',
Siemens Simatic S7-300, 49 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 You have configured the control and downloaded the control program in STEP 7 Lite. Next, you will download the entire STEP 7 Lite project to the CPU 312C and start a test run. The test run demonstrates the interaction between the wired ter- minals, the LED displays, and the program, which logically links the inputs and outputs to one another.
15 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 3.1 What components are required? In order to control the conveyor belt, you will need the components shown: • Power supply for the control components • CPU 312C with integrated input and output module • Mounting rail for installing the modules • Momentary co
59 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 8.1 Diagnostics / correction of errors Incorrect operation, faulty wiring, or an incorrect hardware configuration can cause errors. The CPU 312C displays such errors with the group error LED SF following a memory reset. For information on how to analyze errors a
Siemens Simatic S7-300, 3 Installing and wiring the hardware 22 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 2. Wire the motor, if available. This step is optional. YXX YYY YZZ Y[[ Y\\ Y]] Y^^ Y__ Y`` ZWXW sR t ZXXX ZYXY ZZXZ Z[X[ Z\X\ Z]X] Z^X^ Z_X_ Z`X` [WYW sR t sX u sR t
Siemens Simatic S7-300, 6 Performing a test run 52 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 6.2 Starting the test run 1. Set the mode switch of the CPU 312C to “RUN”. The STOP LED goes out. The RUN LED starts to flash and then displays a continuous light.
Siemens Simatic S7-300, 3 Installing and wiring the hardware 16 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 3.2 Installing the components In this section, we show you how to: • Install and ground the mounting rail • Install the modules on the mounting rail • Insert the front panel connector Installing and grounding the mounting rail 1. Screw the mounting rail to the subsurface. Use two M6 screws for this. 2. Connect the mounting rail to the ground wire. The prescribed minimum cross-section for the cable to the protective conductor is 10 mm 2 . Note the following information when installing the mounting rail: • Make sure to mai
Siemens Simatic S7-300, 29 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 3. Set the main switch of the power supply to “ON”. The DC24V LED on the power supply will light up. All LEDs on the CPU 312C will light up briefly, and the DC5V LED and the STOP LED will remain lit.
Siemens Simatic S7-300, 25 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 3.4 Commissioning the hardware When you commission the hardware, you establish the connections between the CPU 312C and your PC. You supply power to the installed equipment and test for proper wiring. Connecting the CPU 312C and the PC 1. Connect the USB cable to the PC Adapter and your PC. / 0 / 0 / 1 / 0
Siemens Simatic S7-300, 5 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 Materials and tools In order to install the conveyor belt control, you will need the following materials and tools: • The S7-300 starter kit contains the following: Quantity Item Order number (Siemens) 1 Mounting rail 6ES7390-1AB60-0AA0 1 CPU 312C 6ES7312-5BE03-0AB0 1 SIMATIC Micro Memory Card 6ES7953-8LF11-0AA0 1 Multipin front panel connector with screw-type contacts 6ES7392-1AM00-0AA0 1 PC Adapter USB with driver software 6ES7972-0CB20-0XA0 1 Manual Collection containing electronic manuals for the various SIMATIC products 6ES7998-8XC01-8YE0
Siemens Simatic S7-300, 1Welcome 6 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 • In addition, you will need the following components: Quantity Item Order number (Siemens) 1 Power supply 6ES7307-1EA00-0AA0 1 PC with USB interface - 1 STEP 7 Lite V3.0 + Service Pack 2 Can be downloaded free of charge on the Internet various M6 screws and nuts (length depends on installa- tion location) with suitable screwdriver/wrench Commercially available 1 Screwdrivers with 3.5 mm and 4.5 mm blade widths Commercially available
Siemens Simatic S7-300, 27 SIMATIC S7-300 Getting Started for First Time Users Getting Started, 04/2007, 6ZB5310-0NC02-0BA0 Supplying power to the CPU 312C 1. Connect the supply cable to the supply system. Warning Unanticipated operation can cause death or personal injury! Death or serious bodily injury and damage to machinery and equipment can occur if you do not observe the follow- ing safety precautions. A lways put the CPU in STOP before turning on power.
Siemens 6DL2804 Series Desktop Hardware installation manual
6DL2804 Series |
Siemens SINUMERIK 840D sl Desktop Manual
SINUMERIK 840D sl |
Siemens SIMATIC ET 200SP Desktop Manual
SIMATIC ET 200SP |
Siemens NCM S7 Desktop Operation & user’s manual
NCM S7 |
Siemens SIMATIC TI505 Desktop Operation & user’s manual
SIMATIC TI505 |
Siemens simovert masterdrives Desktop Operating instructions manual
simovert masterdrives |
Siemens SIMATIC ET 200SP IM 155-6 PN/2 HF Desktop Manual
SIMATIC ET 200SP IM 155-6 PN/2 HF |
Siemens SIRIUS 3RW55 Desktop Manual
SIRIUS 3RW55 |
# | Manufacturer | Model | Document Type | File | Updated | Pages | Size |
---|---|---|---|---|---|---|---|
1 | Garmin | GPS 10x | Technical specifications | garmin/gps-10x-69E.pdf | 12 Mar 2024 | 26 | 0.35 Mb |
2 | Billion | BiPAC 2073 R2 | Quick start manual | billion/bipac-2073-r2-2J3.pdf | 17 Feb 2023 | 10 | 1.16 Mb |
3 | Exido | COFFEMAKER 245-069 | Specification sheet | exido/coffemaker-245-069-675.pdf | 11 Aug 2022 | 1 | 1.14 Mb |
4 | SATO | CX200 | Programming manual | sato/cx200-667.pdf | 19 Jan 2024 | 99 | 0.42 Mb |
5 | Duerkopp Adler | 251-140042 | Manual | duerkopp-adler/251-140042-D6N.pdf | 14 Oct 2022 | 20 | 4.13 Mb |
6 | Wells | SMPT-EU | Operation manual | wells/smpt-eu-768.pdf | 06 Oct 2022 | 26 | 0.86 Mb |
Dell
Connect the keyboard and mouseSluit het toetsenbord en de muis aanConnectez le clavier et la sourisConecte el teclado y el ratónConnect the network cable — optionalSluit de netwerkkabel aan (optioneel)Connectez le câble réseau (facultatif)Conecte el cable de red (opcional)Connect the power adapter and press the power buttonSluit de netadapter aan en dr …
Inspiron 3252(2 pages) |
Dell
PowerEdge R720 and R720xd Technical Guide Built to run complex workloads using highly scalable memory, I/O capacity, and flexible network options.
…
PowerEdge R720 t(62 pages) |
Alera
ALE-AEWR2BDE1workstation1241ABCkeyboard t rayplastic c apcable managementallen w renchLifting WorkstationCAUTION!WARNINGHand PinchingDo not place your hand near the strut.Strut’s angle will change during the desktop lifts and it may hurt you.overhanging the surface to prevent them from accidentally falling.Adhesive buckle helps to keep cables organized. L …
ALE-AEWR2B(12 pages) |
Apple
073-0708 Rev. A Power Mac G4 ATA Cable Replacement Instructions Follow the instructions in this sheet carefully. Failure to follow these instructions could damage your equipment and void its warranty. Note: Written and video instructions covering customer-installable parts are available at http://www.info.apple.com/installparts/. Warning: During this …
Power Mac 073-0708(7 pages) |
HP
Installing and Configuring SAS HardwareRAID on HP WorkstationsIntroductionThis document provides an overview of hardware RAID solutions for HP workstations running theWindows and Linux operating systems. It assumes a basic understanding of computer hardware,filesystems, and the Linux operating system. It covers an overview of hardware RAID solutions, thediff …
xw4400(14 pages) |
Asus
ASUS All-in-One PC ET2410IUTSSKU # : ET2410IUTS-B018C/ ET2410IUTS-B019CSpace-Saving. Stylish. Smart. The ASUS All-in-One PC ET2410IUTS sports a refreshed design that’s sleek and modern.It is VESA wall mountable to fit neatly in rooms and its stand is made for easy tiltsupport. The display is LED backlight for enhanced visual clarity and energy savings,and …
ET2410IUTS(2 pages) |
Hitachi Nail Gun NV 100H#52Q521 NV 100H: Hitachi Nail Gun Owner Documentation NV 100H, 60 |
Danby Washer DWM060WDB#J6352Z: DWM060WDB Washer Owner's use and care manual DWM060WDB, 28 |
Sylvania MP3 Player SMPK7904Operation & user’s manual for Sylvania SMPK7904 MP3 Player SMPK7904, 32 |
Cisco Network Router ASR 9000 SeriesASR 9000 Series (Network Router ePDF Manual, #84XJ58) ASR 9000 Series, 64 |
Sony TV KV-DX29K9HSony TV Service manual (File: sony-kv-dx29k90b-tv-113, 02/01/2024) KV-DX29K9H, 113 |
Definitive Technology Speakers Mythos TenDefinitive Technology Speakers Mythos Ten Brochure Mythos Ten, 1 |
Yamaha Electronic Keyboard DJX-IIDJX-II Owner's manual - XY477F DJX-II, 100 |
Yamaha Music Mixer M2500-24Yamaha M2500-24 Music Mixer Service manual M2500-24, 15 |
Panasonic Network Card MA2J7040GSpecification sheet for Panasonic MA2J7040G Network Card MA2J7040G, 4 |
Toshiba Laptop L755-S5277L755-S5277 (Laptop ePDF User Guide, #324357) L755-S5277, 4 |
Brinkmann Grill HIL-5502-SMKBrinkmann Grill Operation & user’s manual (File: brinkmann-hil-5502-smk-operation-user-s-manual-13, Thu 09.2023) HIL-5502-SMK, 13 |
Hanover Ice Maker Luxury Series#R2612I: Luxury Series Ice Maker Instruction manual Luxury Series, 21 |