HP DB-102 Owner's Manual
|
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 13 WARM AIR DUCT & PLENUM CLEARANCES The following clearances must be observed and must meet all local building, electrical and fire codes. Follow the National Standard of Canada, Installation Code for Solid Fuel Burning Appliances and Equipment, CSA-B365-01; the National Board of Fire Underwriters and in the US the NFPA codes. The KERR SCOTTY Wood Furnace warm air plenum and first 6 feet (1.8 m) of warm air supply duct in any direction must be installed observing a minimum of 6 inches (155 mm) clearance from the joists or combustible materials. Beyond the first 6ft (1.8 m) of supply duct, a 2 inches (
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 14 2.7 FREE-STANDING (Fig S102-4) The KERR SCOTTY Wood Furnace is designed to be the sole source of central heating in medium sized, well-insulated houses using an integral blower to circulate warm air. In this system connect the ductwork, as you would for any conventional warm air heating system except you use increased clearances. NOTE: This furnace is not to be connected to ductwork that is still connected to another furnace. The wiring diagram for the Scotty is shown in Fig. S102-4. ALL ELECTRICAL WIRING MUST
HP DB-102, Terms and Conditions of Warranty 1) The warranty is not assignable and rights pursuant to it are given only to the original purchaser of the furnace from an authorized retailer. 2) The warranty is null and void unless the original purchaser fully completes the warranty registration card and the card is received by Kerr Heating Products within 30 (thirty) days after installation of the furnace. 3) The warranty applies only to defects in the heat exchanger resulting from defective material and/or workmanship and the rights of the purchaser as to claims resulting from defects in other parts or accessories of the furnace
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 7 DISPOSAL OF ASHES Ashes should be placed in a metal container with a tight fitting lid. The closed container of ashes should be placed on a non-combustible floor or on the ground, well away from all combustible materials, pending final disposal. If the ashes are disposed of by burial in soil or otherwise locally dispersed, they should be retained in the closed container until all cinders have thoroughly cooled. WARNING – A
HP DB-102, ATTENTION HEATING CONTRACTOR: THIS WARRANTY IS FOR THE ORIGINAL PURCHASER AND SHOULD BE GIVEN TO HIM/HER OR PLACED IN SIGHT NEAR THE WOOD FURNACE. SCOTTY WOOD FURNACE 5 YEAR WARRANTY Subject to the terms and conditions on the reverse side hereof Kerr Heating Products (hereinafter called “Kerr”) warrants as follows: The heat exchanger of the wood furnace (hereinafter called the “furnace”) against defects of materials and/or workmanship appearing within a period of five years from date of installation. All other parts and access
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 10 2.2 UNCRATING When you receive your KERR SCOTTY Wood Furnace, check it carefully to ensure that all components are present and in good condition. If there has been any damage or loss in transportation, please notify the carrier and retailer at once. Inspect for the following: o Firebox/Heat exchanger o Poker/coals rake o Marking template (return air and power failure bypass inlet) o For free-standing model optional equipment required: a
SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 6 1.4 MAXIMUM SOLID-FUEL CHARGE The maximum level for a solid-fuel charge is the middle of the loading door, or the level of the handle. DO NOT OVERFILL. The KERR SCOTTY Wood Furnace will accept whole or split logs up to 27 in. (686 mm) long, but a 24 in (610 mm) log length is recommended for
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 15 2.9 INSTALLERS FINAL CHECKLIST DUCTWORK INSPECTION 1) Furnace ducted properly? 2) Proper duct clearances maintained? FURNACE INSPECTION 1) DO NOT use firebrick in the furnace 2) Check settings on fan limit controls. WIRING INSPECTION 1) Is main disconnect switch within view? 2) Wiring cables protected from heat and not touching hot surfaces? FLUE AND SMOKE PIPE INSPECTION 1) Flue inner size equivalent to 7” round
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 8 1.8 ELECTRICAL POWER FAILURE If no one is home during a power failure, the damper will automatically close and some gravity heating will take place. Combustion air will continue to enter through the secondary air holes and a fire should be maintained. IMPORTANT – This furnace is CSA certified for operation under Power Failure only if the following procedure is followed. For optimum heating during a power failure follow
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 2 TABLE OF CONTENTS Specifications 3 1.0 Operating Instructions 4 1.1 Introduction 4 1.2 Wood-Burning 4 1.3 Storage of Wood 5 1.4 Maximum Solid-Fuel Charge 6 1.5 Maintenance 6 1.5.1 Cleaning 6 1.5.2 Servicing 7 1.6 Safety 7 1.7 Controls 7 1.8 Electrical Power Failure 8 1.9 Homeowner Checklist 9 2.0 Ins
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 12 We recommend that the KERR SCOTTY Wood Furnace be connected to its own chimney. However, two or more fuel fired appliances, other than fireplaces or incinerators, may be connected to the same chimney. The National Standard of Canada, Installation Code for Solid-Fuel-Burning Appliances and Equipment, CSA-B365-01 clause 5.2.9 states that: Two or more appliances shall not be connected to the same chimney flue unless:
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 9 1.9 HOMEOWNER CHECKLIST o Keep area around unit clean and clear of combustibles. o Use only dry wood. DO NOT burn garbage, gasoline or naphtha. o Load carefully. o Remove ashes as directed. o Watch for soot in smoke pipe – clean regularly. o Clean furnace heat exchanger regularly. o Be aware of danger due to over firing unit. o Do not load above maximum loading level (middle of loading door) or overheating may result. o This unit is NOT suitable for automatic stoking. o Load carefully. Do not slam fuel against rear or si
HP DB-102, SCOTTY WOOD FURNACE Model DB-102 OWNER’S MANUAL IMPORTANT READ OWNER’S MANUAL THOROUGHLY BEFORE INSTALLING FURNACE OR LIGHTING FIRE. CONSULT LOCAL AUTHORITIES IF IN DOUBT ABOUT YOUR LOCAL FIRE SAFETY REGULATIONS. ALL INSTALLATIONS MUST BE MADE IN ACCORDANCE WITH LOCAL AND STATE OR PROVINCIAL CODES WHICH MAY DIFFER FROM THIS MANUAL. IMPROPER INSTALLATION WILL RESULT IN VOIDING OF WARRANTY.
HP DB-102, SCOTTY WOOD FURNACE – INSTRUCTION MANUAL Scotty Oct-06 11 2.4.1 COMBUSTION AIR SUPPLY Air inlets of at least 200 square inches free area (1.5 in 2 /1000Btu) must be provided to the room occupied by the wood fired or oil fired furnace. These fresh air inlets must provide or allow free access of fresh outside air to the furnace. At no time or under any circumstances can a wood or oil-burning appliance be starved of combustion air. The appliance must at all times be able to maintain the approved stack draft. The barometric draft regulator must be installed on the furnace smoke pipe in the same room or at least in such a way that there is unres
Johnson Controls 33" Furnace User's information manual
33" |
Harman Stove Company PF 100 Furnace Installation and operating manual
PF 100 |
Granby KHM SERIES Furnace Nstallation, operation and service manual
KHM SERIES |
White Rodgers 80 Furnace Owner's manual
80 |
Lennox SLP98UH SERIES Furnace User's information manual
SLP98UH SERIES |
HP 422690 I Furnace Installer's information manual
422690 I |
Montigo MW38-BV Furnace Installation operation & maintenance
MW38-BV |
J. A. Roby ATF727 Furnace Owner's manual
ATF727 |
# | Manufacturer | Model | Document Type | File | Updated | Pages | Size |
---|---|---|---|---|---|---|---|
1 | SpeakerCraft | BassX-10 | Owner's manual | speakercraft/bassx-10-OM4.pdf | 28 Jul 2023 | 5 | 0.43 Mb |
2 | Philips | 33605-31-96 | Brochure | philips/33605-31-96-Q3G.pdf | 20 Feb 2024 | 3 | 1.56 Mb |
3 | Indesit | TVFG 85C Futura | Instruction booklet | indesit/tvfg-85c-futura-6VZ.pdf | 26 Apr 2023 | 20 | |
4 | Independence | iGLIDE R100 | Operation & user’s manual | independence/iglide-r100-6HB.pdf | 28 May 2023 | 24 | |
5 | Blue Wave | NG1031F | Assembly instructions manual | blue-wave/ng1031f-WJ6.pdf | 20 Nov 2022 | 9 | |
6 | Apple | AirPort Express 802.11n (2nd Generation | Setup manual | apple/airport-express-802-11n-2nd-generation-WQF.pdf | 03 Oct 2022 | 40 | 0.67 Mb |
ICP
These instructions must be read and understood completely before attempting installation.Safety Labeling and Signal WordsDANGER, WARNING, CAUTION, and NOTEThe signal words DANGER, WARNING,CAUTION, and NOTE are used to identify levels ofhazard seriousness. The signal word DANGER isonly used on product labels to signify an immediatehazard. The signal words WAR …
N9MP1(59 pages) |
ICP
NOTE TO INSTALLER:This manual must be left with the equipment user.USER: Please read all instructions in the manual andretain all manuals for future referenee.FIRE OR EXPLOSION HAZARDFailure to follow warnings could result in personal injury,death, or property damage.Do not store or use gasoline or other flammable vapors andliquids in the vicinity of this or …
GAS FURNACE(40 pages) |
York
TECHNICAL GUIDE 97% AFUE MODULATING PSC RESIDENTIAL GAS FURNACESMULTI-POSITIONMODELS: TM9MNATURAL GAS60 - 120 MBH INPUTDue to continuous product improvement, specifications are subject to change without notice.Visit us on the web at www.york.comAdditional rating information can be found at www.ahridirectory.orgWARRANTY SUMMARYA 20-year limited warranty on …
TM9M(4 pages) |
Bard
Page 1 of 53 INSTALLATION INSTRUCTIONSBard Manufacturing Company, Inc. Bryan, Ohio 43506www.bardhvac.comManual No.: 2100-631Supersedes: NEWDate: 4-1-15 WARNINGREAD ALL INSTRUCTIONS CAREFULLY BEFORE BEGINNING THE INSTALLATION.THE INSTALLATION MUST COMPLY WITH THESE INSTRUCTIONS AND THE REQUIREMENTS OF ALL GOVERNING CODES AND ORDINANCES FOR THE INSTALL …
W24G3DA(53 pages) |
COZY
GAS-FIREDVENTEDWALLFURNACE JINSTALLATION ANDOPERATING INSTRUCTIONSP/N 84502 REV. 11/04IIL :GAS W255F, W355F, W505F S W256F, W356F,W502F iW506FWARNING: If the information in this manual is notfollowed exactly, a fire or explosion may result causingproperty damage, personal injury or loss of life.Do not store or use gasoline or other flammable vapors andliquid …
W252F and(20 pages) |
Taylor
92-24161-104-03SUPERSEDES 92-24161-104-02INSTALLATION INSTRUCTIONSFOR RGFG UPFLOW HIGH EFFICIENCY MODULATINGCONDENSING GAS FURNACESIF THE INFORMATION IN THESE INSTRUCTIONS IS NOT FOLLOWED EXACTLY, A FIRE OR EXPLOSIONMAY RESULT, CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR DEATH.RECOGNIZE THIS SYMBOL AS AN INDICATION OF IMPORTANT SAFETYINFORMATION!THESE INSTRU …
RGFG(116 pages) |
Jasic Welding System TIG 200 AC/DC Digital SeriesTIG 200 AC/DC Digital Series (Welding System ePDF Manual, #E8C2S3) TIG 200 AC/DC Digital Series, 36 |
Swegon Heater TBLASwegon TBLA Heater Installation instructions TBLA, 2 |
Orion Tablet TP700AOrion Product User Manual: TP700A PDF Instruction manual - G44R31 TP700A, 10 |
Makita Impact Driver 6922NBUser Manual: Makita 6922NB (114R53, Upd.Sunday 07-01-2024) 6922NB, 3 |
Utax All in One Printer P-C2660 MFPAll in One Printer PDF Operation & user’s manual P-C2660 MFP, 578 |
Whirlpool Furnace WGFM195PDF User Manual (@6C7759), Whirlpool WGFM195 Furnace (Thu 11.2023) WGFM195, 48 |
Gateway TV 56-inchGateway TV 56-inch Replacement manual 56-inch, 8 |
LG LCD TV 47LY3DE SeriesLG LCD TV Service manual (File: lg-47ly3de-series-service-manual-46, 24.01.2024) 47LY3DE Series, 46 |
Carrier Heat Pump 50ZHA024-060Guide: Carrier 50ZHA024-060 (HT3RUL, Upd.21st Dec 2023) 50ZHA024-060, 20 |
Radio Shack Security System 49-2514#E8C17T: 49-2514 Security System Owner's manual 49-2514, 8 |
Ford Automobile SUPER DUTY 2015Ford SUPER DUTY 2015 User Manual (Quick reference manual), @6NMTWI SUPER DUTY 2015, 10 |
Dell Laptop Vostro 3400Dell Laptop Vostro 3400 Service manual Vostro 3400, 83 |