Manualios.com

Chris Coffee Service Vetrano Owner's Manual

Chris Coffee Service Vetrano Manual Online:

4, 572 votes
Chris Coffee Service Vetrano User Manual
Chris Coffee Service Vetrano User Guide
Chris Coffee Service Vetrano Online Manual

Text of Chris Coffee Service Vetrano User Guide:

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 2 - Table Of Contents Diagrams ........................................... .............................................. 3 Introduction ...................................................................................... 4 First Time Set Up ............................................................................. 4 Before Each Use .............................................................................. 5 Normal Operation ............................................................................ 5 Brewing Espresso ............................................................................ 6 Steaming Milk Basics. .....

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 3 - Diagrams 1. Steam Knob 2. Power Indicator Light 3. Steam Wand 4. Pressure Gauge 5. E61 Group Head 6. Main Power Switch 7. Cup Warming Tray 8. Heating Indicator Light 9. Hot Water Knob 10. Boiler Filling Indicator Light 11. Hot Water Wand 12. Brew Lever 13. Drip Tray 1. Single Portafilter 2. Double Portafilter 3. Cleaning Brush 4. Backflush Disc 5. Tamper/Coffee Scoop 1. Braided Water Line 2. F

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 4 - First of all, thank you for your business! You are going to love your new Vetrano – it combines beauty, value, and great brewing for making the best espressos, cappuccinos, and lattes you’ve ever tasted! These instructions include hints that will help you get started quickly. • Before connecting your machine to your water source, test your water for hardness using the provided test strips. Fill a glass with cold tap water; dip the tip of the test strip into the water for one second, then pull the strip out of the water and hold it hori

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 5 - • The boiler filling indicator light will illuminate and the pump will come on to start filling the boiler. The boiler should fill in approximately 60 seconds. If the pump has not turned off and finished filling after 60 seconds then turn the main power switch off and wait 5 minutes. • After waiting five minutes then turn the main power switch on again. The pump should come back on to continue filling the boiler. If the pump keeps running for more than 45-60 seconds again then unplug the machine

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 6 - Brewing Espresso First let me begin by explaining the three main variables of preparing great espresso. 1. Quantity of ground coffee 2. Tamp firmness 3. The grind The quantity of ground coffee. Loosely fill the basket slightly mounding over the top. Then lightly run your finger arched across the basket from left to right, right to left, front to back, and then lay your finger flat on the basket and go from back to front to remove any exces

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 7 - Steaming Milk - Basics F irst, let’s talk about some of the things you need to learn in order to become ‘barista-like’ in your techniques. Milk – Whole milk works best to steam, both in technique and in flavor! Lower fat milks contain mostly water which will not foam well and will be almost tasteless when steamed. After all your hard work you will be left with a less than desirable tasting beverage. Milk – Your whole milk needs to be as cold as

  • Vetrano Chris’ Coffee Service Inc. - 8 - Steaming Milk - Technique A s you face your espresso machine, point the steam arm over your drip tray and open up the steam valve in order to purge out any unwanted water that may have collected inside the wand due to condensation – you do not want that added to your delicious beverage! Next, pos

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 9 - Hot Water Wand Operation • The hot water wand uses the steam pressure to push the hot water out of the boiler so the machine must be up to temperature before it is able to give any hot water. • To use the hot water wand, position the cup or pitcher under the wand and then open the hot water knob. Once the water has reached the desired level then close the hot water knob. • It is not recommended to remove more than 6 oz. of water at any one time until the machine has had time to refill the boiler. Failure to do so may cause

  • Vetrano Chris’ Coffee Service Inc. - 10 - Backflushing with espresso machine cleaner is the same procedure as above with a few minor differences. The first difference is backflushing with espresso machine cleaner only needs to be done approximately once a month or every 35-50 espressos. I don't recommend backflushing with cleaner more often than once every three week

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 11 - Expansion Valve Adjustment W arning: This adjustment requires removing the shell and making an adjustment with the machine plugged in so it is very important to exercise extreme caution. Failure to do so may cause injury, and or electrical shock. Chris’ Coffee Service and it’s distributors assume no liabilty for failure to follow this warning. • The expansion valve is used to allow for the expansion of heated water in the heat exchange. This water is discharged into the drip tray via a black plastic spout. During heat up it is normal for the black plastic spout to discharge som

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 12 - Setting Steam Pressure Warning : This adjustment requires removing the shell and making an adjustment with the machine plugged in so it is very important to exercise extreme caution. Failure to do so may cause injury, and or electrical shock. Chris’ Coffee Service and it’s distributors assume no liabilty for failure to follow this warning. • It is only necessary to remove the top of the machine to adjust the steam pressure. • Before making an adjustment the mach

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 13 - Group Gasket And Shower Screen Replacement • The group gasket is a black rubber gasket that makes the seal between the portafilter and the group head. We recommend replacing the gasket on a yearly basis. The Vetrano uses an E61 8.5mm gasket. They can be purchased from our website at the link below. http://www.chriscoffee.com/products/home/e61groupparts/e61groupgasket • Replacing the group gasket requires the removal of the sho

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 14 - Cleaning The Group • Before installing the new gasket and screen it is very important to clean the group head. Make up a solution of hot water and backflushing cleanser. Using the provided cleaning brush and cleanser, clean the group head and be sure the groove that the gasket sits in is completely free of any residual gasket material and coffee grounds or the new gasket will not seat properly. Gasket And Screen Installation Step 1 With the writing/beveled

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 15 - Troubleshooting No Steam From Steam Wand • Make sure the machine has been turned on for at least 15 minutes. • Check the upper portion of the gauge for steam pressure. Pressure should be about 1.2 bar. If the gauge is at zero then refer to the “Not Heating” section of the troubleshooting manual. If pressure is good then continue with steps below. • Check the steam tip for a blockage. Clean steam tip holes with a paper clip. • Check the steam wand for a blockage by unscrewing the steam

  • Vetrano Chris’ Coffee Service Inc. - 16 - Not Heating • Verify the machine is plugged into the outlet and the outlet has power. Verify the power switch is in the “on” position. • Make sure the water is turned on to the machine. If the water was turned off, then turn the power switch off, unplug the machine and then wait 5 seconds and

  • Chris Coffee Service Vetrano, Vetrano Chris’ Coffee Service Inc. - 17 - Warranty The Vetrano comes with a 1 year warranty starting from the original date of purchase to protect against defects in materials or workmanship. The warranty is void if the product has been damaged by abuse, neglect, or modification. For more detailed information about the warranty please visit our website at the following link: http://www.chriscoffee.com/policy We Are Here To Help Enjoy your new espresso machine and remember, should you have any questions, either visit our FAQ section

Related Products and Documents (Coffee Maker):

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 Avaya 1120E Operation & user’s manual avaya/1120e-G62.pdf 22 Jul 2023 4 0.73 Mb
2 Craftsman 315.108420 Owner's manual craftsman/315-108420-D96.pdf 03 Mar 2023 22 1.05 Mb
3 Atlantic Technology 2200C Instruction manual atlantic-technology/2200c-4I9.pdf 04 Dec 2022 12 0.54 Mb
4 Roland TD-12 Owner's manual roland/td-12-G2E.pdf 17 Jul 2022 108 4.53 Mb
5 Craftsman 358.352162 Operator's manual craftsman/358-352162-C63.pdf 28 Nov 2022 20 1.54 Mb
6 Cisco 850 Series Manual  cisco/850-series-CW2.pdf 30 Dec 2023 108 2.08 Mb

Similar Resources:

  • Philips

    HD8837/32

    (28 pages)
    OPERATING INSTRUCTIONSREAD THESE OPERATING INSTRUCTIONS CAREFULLY BEFORE USING THE MACHINE.EnglishRegister your product and get support atwww.philips.com/welcomeENType HD8836 / HD8837SUP 037DR …
  • Mr. Coffee

    ECM150

    (1 pages)
    Service ManualModel CapacityWar PeriodFeatures/Description ColorECM1501 Year MRC,4CU,STEAM ESPRESSO BlackPictureKey # Type Description Component QtyLit CON Inst. Book, ECM150 114178-000-000 14 CON DECANTER FOR ECM8 DECM8S 13 CON Decanter lid ECM 4103 15 CON Filter Holder 5833 1** CON FILTER CUP 4101 11 CON Cap, Water Reservoir EC 115746-000-000 17 CON Drip …
  • Bunn

    ITB

    (36 pages)
    ITB/ITCBITCB-DV HVITCB TWIN HVInfusion Series®INSTALLATION & OPERATING GUIDEBUNN-O-MATIC CORPORATION OF CANADA280 INDUSTRIAL PARKWAY S.,AURORA, ONTARIO, L4G 3T9PHONE: (905) 841-2866 FAX: (905) 263-2256To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts Catalog, Programming Manual, or Service Manual, please …
  • Hamilton Beach

    46201

    (32 pages)
    CoffeemakerCafetièreCafeteraEnglish ...................... 2Français .................. 12Español .................. 22READ BEFORE USELIRE AVANT D’UTILISERLEA ANTES DE USARQuestions? Please call us – our friendly associates are ready to help.USA: 1.800.851.8900¿Preguntas?Por favor llámenos – nuestrosamables representantes están listos para ayudar …
  • Saeco

    HD8967

    (76 pages)
    Quick Instruction GuideREAD THIS GUIDE CAREFULLY BEFORE USING THE MACHINE.CHECK ON WWW.SAECO.COM/SUPPORT TO DOWNLOAD THE LATEST USER MANUALRegister your product and get support at www.saeco.com/welcomeAvanti App is compatible with iPad 3/4/Air/mini retina, running iOS7 and newer; and with Samsung Galaxy Tab 3 (8.0 inch)/Tab 4 (10.1 inch)/Note pro LTE (12.2 …
  • Cecilware

    ESP1

    (20 pages)
    Cecilware Corporation 43-05 20th. Avenue, LIC NY 11105Tel: 800.935.2211 / 718.932.1414 • Fax: 718.932.7860®Since 1911®Since 1911www.cecilware.comNR27A (05/08)ESP Espresso MachinesInstruction ManualModels: ESP1, ESP2 and ESP3 …

Comments, Questions and Opinions: