Manualios.com

Chesney's Wood Burning and Multi Fuel Stoves User's Installation Manual

  • Wood Burning and Multi Fuel Stoves Cooktop
  • maqtMIRBkQ4ts
  • User's Installation Manual
  • PDF / Adobe Acrobat Reader
  • 35

Chesney's Wood Burning and Multi Fuel Stoves Manual Online:

4.15, 1174 votes
Chesney's Wood Burning and Multi Fuel Stoves User Manual
Chesney's Wood Burning and Multi Fuel Stoves User Guide
Chesney's Wood Burning and Multi Fuel Stoves Online Manual

Text of Chesney's Wood Burning and Multi Fuel Stoves User Guide:

  • Chesney's Wood Burning and Multi Fuel Stoves, 15 6. Smoke Control All Chesney’s stoves are DEFRA exempt appliances that can be used in Smoke Control Zones. The “Smoke Tab” is fitted on the underside of the fire cube on the left hand side and must be removed with the retaining bolt and discarded. The Milan and Shoreditch stoves have heat shields under the stove that will have to be removed by undoing the four hexagonal bolts to reveal the “Smoke Tab”. Always replace the heat shields. Stove Operation in Smoke Control Zones Make up fire as described page 28. Do not red

  • 5 Wood Burning 5 Series Parameter Salisbury Beaumont Shoreditch Nominal heat output kW 4.9 4.9 4.9 Mean CO emission (at 13 % 02) 0.23 0.23 0.23 Mean flue Gas temperature oC 211 211 211 Flue gas mass flow g/s 3.6 3.6 3.6 Total efficiency % 84.5 84.5 84.5 Refuelling

  • 24 11. Stove Paint Application Instructions Chesney’s stove paint is quality, fast drying high temperature paint for use on wood, multi-fuel and gas stoves and other steel and cast iron products with in-service temperatures to 650°C. This product is not recommended for Vitreous Enamelled surfaces. Stoves, as supplied by the manufacturer, can be successfully

  • Chesney's Wood Burning and Multi Fuel Stoves, 12 Carbon Monoxide It is now a requirement for an electronic carbon monoxide detector conforming to BS EN 50291 to be fitted in the room where the appliance has been installed. This should be maintained and tested in accordance with the manufactures instructions. Flue Requirements This appliance must not be used in a shared flue system. The optimal flue draft is 12 pascals at nominal output. Minimum flue draft required is 10 pascals. Minimum flue height 5 meters. The 150mm diameter flue models may be increased to 170mm diameter. The 130mm diameter flue should be increased to 150mm. A 130mm flue may be used when

  • Chesney's Wood Burning and Multi Fuel Stoves, 23 10. The Curing Process Your Chesney’s stove has been designed to operate with minimum effort. As with all wood burning and multi fuel stoves your new stove will need to be ‘cured’ before commencing normal use. For the first lighting of the stove after installation it is VERY IMPORTANT that the door remains slightly ajar during the first firing. During the first firing the paint finish goes through a curing process which will soften the paint with the heat. As the stove cools down the paint will harden. This proc

  • Chesney's Wood Burning and Multi Fuel Stoves, 17 7. Apollo 4 and 8 Installation The Apollo range of inset stoves have been designed to be installed in two stages. The outer casing needs to be installed before the fire cube, and the outer frame and door will need to be removed to install this appliance. 1) Remove all internal parts (baffles, side and rear bricks, solid fuel grate and ash pan (8 series only). 2) Remove the frame which is secured with four hexagonal bolts under the top edge circled below (figure 3). 3)

  • 28 Note Before lighting please note the following points: Chesneys stoves must only use HETAS approved wood fuels and smokeless coal. Do not use any liquid fuels. Do not over load your stove. Never empty the ash when the fire is alight. Do not burn solid fuel and wood at the same time. Wood burns from the top down, whereas solid fuel burns from the bottom up, therefore there

  • Chesney's Wood Burning and Multi Fuel Stoves, 3 Contents Section Page 1 Technical Specifications and Dimensions 4 2 Distance to Combustibles 10 3 Pre Installation 11 4 Installation 13 5 Converting Top to Rear Exit 14 6 Smoke Control 15 7 Apollo 4 & 8 Installation 17 8 Door Seal Replacement & Door

  • Chesney's Wood Burning and Multi Fuel Stoves, 1                                

  • Chesney's Wood Burning and Multi Fuel Stoves, 35    To validate and start your warranty please fill out this form and send it back to Chesneys, Units 1-4 Zennor Road Business Park, London SW12 0PS. Alternatively log on to www.chesneys.co.uk/warranty/registration.asp and complete the online form. All items are required Your Details Name Address Postcode Email address Purchase Details Purchased From Purchase Date Product Details Appliance Name Appliance Colour Serial Number

  • Chesney's Wood Burning and Multi Fuel Stoves, 25 12. First Lighting and Operation Your Chesney’s stove has been designed and built to last, and provided the instructions and guidance in this manual have been followed the appliance will give you years of warmth and pleasure. This appliance is not to be used as an incinerator. Only HETAS approved wood logs and smokeless fuels are recommended by Chesneys for use in this appliance. This appliance is design to operate with the door closed, except for lighting and reloading, failure to close the door during operation will result in fume spillage. The Multi-Fuel Range 6 and 8 Series These are designed for use with wood and solid fuel. T

  • Chesney's Wood Burning and Multi Fuel Stoves, 32 Cleaning The body of the stove should be vacuumed with a brush attachment; any marks should be wiped with a very lightly damp cloth. The glass can be cleaned with damp newspaper dipped in the wood ash, or use a proprietary glass cleaner, no abrasives should be used. Always ensure the ash is cold before de ashing. On the 4 and 5 series stoves lift out the log retainer and scoop out the ash from the base of the fire cube. On the 6 and 8 series stoves carefully remove the ash pan from under the grate using the ash pan tool provided and dispose ash in a suitable

  • Chesney's Wood Burning and Multi Fuel Stoves, 20 9. Commissioning Check all internal parts are fitted correctly and there are no gaps between the firebricks and baffles and the log retainer is secure: Wood Burning Only 4 and 5 Series Secondary baffle. Firebricks: base, back, sides and baffle. Metal flue protector strip on top of the back brick Log retainer (not fitted on Milan 4 model) Multi-Fuel 6 and 8 Series Secondary baffle Ash pan Cast iron grate complete with riddling section. Log retainer. Firebricks: rear and sides. Check all the levers are operating fu

  • Chesney's Wood Burning and Multi Fuel Stoves, 18 Chimney Connection 1) Drop the liner through the outer casing and fix the flue adaptor, then fit the flue collar to the adaptor bending the adaptor lugs to secure the collar to the adaptor. 2) On the 8 series only there is an additional directional flue collar that bolts to the inside of the outer casing. This will need to be done at this stage. Note: If connecting to an existing chimney you will need to make an opening in the front face of the chimney breast above the outer casing to make a compliant appropriate connection to the outer casing flue

  • Chesney's Wood Burning and Multi Fuel Stoves, 4 1. Technical Specifications and Dimensions Wood Burning 4 Series Parameter Beaumont Belgravia Shoreditch Salisbury Apollo Alpine Milan Nominal heat output kW 4.6 4.5 4.6 4.6 Mean CO emission (at 13 % 02) 0.76 0.68 0.76 0.37 Mean flue Gas temperature oC 167 200 262 262 Flue gas mass flow g/s 3.2 3.5 3.6 3.6 Total efficiency % 84.0 82 80 80 Refuelling mins 45 60 45 60 Test fuel wood kg 1 1 1 1.38 Fuel size: 2 x logs mm at 13-14 % moisture 300 x 130 dia 300 x 130 dia 300 x 130 dia 300 x 130 d

  • Chesney's Wood Burning and Multi Fuel Stoves, 2 Congratulations on your purchase of a Chesney’s stove. Please note that it is a legal requirement under England and Wales Building Regulations that the installation of the stove is either carried out under Local Authority Building Control approval or is installed by a Competent Person registered with a Government Approved Competent Persons Scheme. HETAS Ltd operate such a scheme. Further information can be found at www.hetas.co.uk This appliance will become hot whilst in operation. It is recommended that a suitable guard be used for the protection of young children, the elder

  • Chesney's Wood Burning and Multi Fuel Stoves, 29 Operation with door left open Operation with the door open can cause excess smoke. The appliance must not be operated with the appliance door left open except as directed in the instructions. Refuelling Always refuel on a hot bed of ash. Pull Air Flow Bar fully out to setting III. Slowly open the door with the glove provided equalising the pressure inside the fire cube with the room (if you open the door quickly ash will be lifted from the furnace into the room). Place 2-3 logs bark side down onto a bed of hot ashes and close the door. When the logs have fully turned black set Air Flow Bar to des

  • Chesney's Wood Burning and Multi Fuel Stoves, 19 8. Door Seal Replacement and Door Handles Always use gloves when handling ceramic rope. Apollo and Milan Remove door from the stove and remove rope seal clamps. Discard old rope seal and replace with Chesney’s rope seal. Do not tighten rope seal clamps until all bots are in and hand tight, then tighten all bolts. Freestanding series stoves Remove door and place face side down on a suitably protected table. Remove old seal and clean the rope seal channel thoroughly with wire a brush. Ensure the rope channel is clean and dust free. Apply a continuous and even bead of glue in the channel. Place the new ceramic rope onto the glue, being car

  • 6 Multi-Fuel 6 Series Parameters Wood / Ancit Beaumont Belgravia Shoreditch Salisbury Shipton Alpine Milan Nominal heat output kW 7.0 / 6.0 6.2 / 6.0 6.2 / 6.7 Mean CO emission (at 13 % 02) 0.34 / 0.37 0.34 / 0.37 0.3 / 0.23 Mean flue Gas temperature oC 265 / 199 324 / 294 3

Related Products and Documents (Cooktop):

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 Zanussi 200336 Specifications zanussi/200336-Q31.pdf 17 May 2023 2 0.12 Mb
2 Grohe Axor 35115801 Installation instructions manual hans-grohe/axor-35115801-593.pdf 02 Mar 2024 16 1.17 Mb
3 Husqvarna BV650 Operator's manual husqvarna/bv650-72Z.pdf 17 Jul 2023 27
4 SilverStone TJ07 Manual  silverstone/tj07-HZX.pdf 26 Jan 2023 12
5 Yard Machines 660 Series Operator's manual yard-machines/660-series-72R.pdf 18 Dec 2023 28 1.22 Mb
6 Kodak Carousel S-AV 1050 Instruction manual kodak/carousel-s-av-1050-83A.pdf 19 Jul 2022 16

Similar Resources:

  • Roper

    FGP305KW

    (16 pages)
    IMPORTANT: Save for local electrical inspector’s use.INSTALLATION INSTRUCTIONS30" (76.2 CM) FREESTANDING GAS RANGEwith standard clean ovenW10032070Table of Contents..................................................2 …
  • Bartscher

    70 Series

    (69 pages)
    Bartscher AGIndustrie Fänn OstZugerstrasse 60CH-6403 Küssnacht am RigiTel.: 041 785 50 00Fax: 041 785 50 [email protected] d‘emploi286.410 (K7ECI05VV)286.415 (K7ECI05TT)286.420 (K7ECI10VV)286.425 (K7ECI10TT) …
  • Dimplex

    ELECTRALOG CS1205

    (11 pages)
    Owner’s ManualModel CS-12057207040100R08IMPORTANT SAFETY INFORMATION: Always read this manual rst before attempting to install or use this stove. For your safety, always comply with all warnings and safety instructions contained in this manual to prevent personal injury or property damage.To view the full line of Dimplex products, please visit www.dimpl …
  • Whirlpool

    W11213196D

    (36 pages)
    THANK YOU for purchasing this high-quality product. Register your new range at www.whirlpool.com. In Canada, register your range at www.whirlpool.ca.For future reference, please make a note of your product model and serial numbers. These can be located on the oven frame behind the top right side of the oven door.Model Number__________________________________ …
  • Cannon

    CANTERBURY

    (20 pages)
    Inbuilt Heater Instruction ManualPlease read this manual before installing and using this heater.Please leave instruction manual with the ownerDistributorThis appliance is designed, manufactured and distributed by:Tel: 1300 727 421FitzroyCanterbury …
  • GE

    Profile PB975SMSS

    (2 pages)
    †Note: Check local codes for required breaker size.Effective January 1, 1996, the National Electrical Code requires that new construction (not existing) utilize a 4-conductor connection to an electric range.Receptacle Locations: Locally approved flexible service cord or conduit must be used because terminals are not accessible after range installation. Se …

Comments, Questions and Opinions: