Manualios.com

Ariterm 35+ Operating Instructions Manual

Ariterm 35+ Manual Online:

3.4, 2970 votes
Ariterm 35+ User Manual
Ariterm 35+ User Guide
Ariterm 35+ Online Manual

Text of Ariterm 35+ User Guide:

  • Ariterm 35+, 2 CONTENTS General .........................................................................................................2 Installation ................................................................................................ 4-5 Installation of temperature limit valve .......................................................6 Measurements and connections .................................................................7 Technical specifications and boiler cross-section .....................................8 Operati

  • Ariterm 35+, GENERAL e Ariterm 35+ is an economic, durable and environmentally-friendly, bottom fire, wood- burning central heating boiler. Heating is periodic and based on storing energy in the warm water accumulator tank. Usually this boiler is used for heating detached houses, farm buildings, etc. Logs up to 50 cm long can be used as fuel. Light fuel oil can also be used if an oil burner is fitted. In order to take advantage of all the features, it is important to observe the instructions given in this booklet. TRANSPORTATION, STORAGE AND OPENING THE PACKAGE Receiving the goods e boiler is delivered in a wooden frame. On the bottom is a pallet, which can be u

  • Ariterm 35+, 4 INSTALLATION Installation of the boiler can only be done by a company or individual with the necessary pro- fessional accreditations. Installation should be performed so that it meets the generally accepted laws and regulations applicable to the industry. Electrical installation work must be done only by a qualified electrician. Space requirements An area of 1 metre must be reserved in front of the boiler for cleaning and maintenance pro- cedures. Above the boiler, a space at least as high as the height of the boiler must be reserved for convection. Flue connec

  • Ariterm 35+, 5 e water returning to the boiler must be about 70°C. is is achieved by using a bypass con- nection in accordance with the circuit diagram. In order to maintain a sufficiently high tempe- rature during the heating period, the convection surfaces should be kept clean, to ensure highly efficient burning. e life expectancy of the boiler will also be increased, because corrosive acids will not be created on the heating surfaces. INSTALLATION Part Name 1 Ariterm 35+ boiler 2 3-way valve, underfloor heating 3 3-way valve, radiator heating 4 Heat supply pump, underfloor heating 5 Heat supply pump, radiator heating 6 Underfloor heating system ma

  • Ariterm 35+, 6 INSTALLING THE TEMPERATURE LIMIT VALVE e Pressure Vessel Directive requires that a manually-filled wood-burning boiler must be equipped with a safety device, which prevents the boiler from overheating if circulation in the accumulation tanks is prevented for some reason. e Ariterm 35+ boiler includes a cooling spiral. We recommend the SYR 3065 temperature limit valve for this boiler. is does not, ho- wever, replace other safety devices such as a safety vent. Installation e temperature limit valve is connected to the cooling spiral or to the fork-junction in the warm process water pipe so that when the valve operates, it sends hot

  • Ariterm 35+, 7 DIMENSIONS AND CONNECTIONS Part Name Unit 1 Turning plate adjustor 2 Water pressure gauge 3 Water thermometer 4 Combustion gas thermometer 5 Firebox hatch 6 Primary air damper 7 Secondary air damper 8 Refill hatch 9 Convection cleaning hatch 10 Convection ash removal hatch Part Name Unit 11 Fixed hatch for afterburning chamber (hinged service hatch an option) 12 Safety valve connection DN 20 13 Water accumulator outlet DN 50 14 Water accumulator return DN 50 15 Expansion unit DN 25 outer thread 16 Blow-off unit DN 15 17 Cooling spiral units Cu 15 18 Flue connection 168 19 Flue gas fan (A35-121D) 2

  • Ariterm 35+, 8 TECHNICAL SPECIFICATIONS / BOILER CROSS-SEC TION TECHNICAL SPECIFICATIONS Performance values: Power 20 - 40 kW Measurement data: Width Depth Height Weight empty Water capacity Storage chamber volume Burning time Size of refill opening Chimney recommendation 800 mm 1109 mm 1300 mm 690 kg 150 L 120 L 37 kg / 3 h 550x350 mm 150 mm, 4 m Design and adjustment values: Boiler operating pressure Permitted operating temperature Suitable size of accumulator Max. length of logs 0,5-1,5 bar Max 120 °C 1800 – 3000 L 0,5 m afterburning chamber convection section storage chamber grate direct damper

  • 9 OPERATING PRINCIPLE e Ariterm 35+ boiler is meant for use at full power, then complete gasification of the wood will take place and the combustion will be clean. e amount of energy available from the boiler to the accumulator will be optimal and the need for cleaning small. e boiler will also last lon- ger with proper burning. Wood gasication is take

  • 10 It is advisable to carry our installation with the assistance of somebody else. Clean the boiler well and carefully remove any pitch that may have accumulated, so that the parts will fit into place. e grate should be installed before the ceramic parts through the firebox hatch, so that the denser part of the grate goes backwards. Take care as the grate weighs about 50 kg. e bricks

  • 11 3. Lower part of front brick 4. Lower part of rear brick 5. Upper part of rear brick 5. Upper part of rear brick 6. Upper part of front brick. The upper parts support each other with a suitably sized piece of wood in between, for example. 6. Upper part of front brick INSTALLATION OF THE GRATE AND CERAMIC COMPO- NENTS

  • Ariterm 35+, 12 INSTALLATION OF THE GRATE AND CERAMIC COMPO- NENTS 6. Upper part of front brick. 7. Upper parts of side brick (2 pcs) (pay atten- tion to left-or right-handedness). Remove the temporary support then installation is complete. 1. 2. 3. Installation of base bricks

  • Ariterm 35+, 13 OPERATION Introduction into use Before running the boiler, check the following: • the heating system and boiler are full of water, pressure at least 0.5 bar • the heat supply pump is on • the system valves are open • the combustion air opening is open • the safety vent is in unhindered contact with the boiler and is operational • the relief valve is operational • CHECK that afterburning chambers bricks are in right position. First heating cycle e boiler’s afterburning chamber is ceramic, and may contain moisture when new. In order to ensure that the bricks dry out, it is advisable to keep the hatches open before heating if the boi- ler is inside. In the

  • Ariterm 35+, 14 HEATING Lighting the boiler Current regulations on limiting emissions resulting from wood burning have set major challen- ges on the development of combustion technology. As a result of the development, wood-bur- ning boilers have become increasingly efficient and less and less firewood is required for heating. ese changes make the boilers more difficult to operate by natural means. Unless the boiler is equipped with a flue gas fan, ignition by natural means is only possible with the help of adequa- te preheating. e following instructions should be followed carefully when igniting the boilers: 1. e service hatch must be fully cl

  • Ariterm 35+, 15 HEATING Relling Refilling is recommended when the storage chamber is about 1/3 full of wood. 1. Put the turning plate in the ignition position. 2. Slowly open the refill hatch, which will release the burning gases from the storage chamber. 3. Fill the storage chamber. N.B. Fuel should only be relled when the energy created can be stored in the accumulator tank or otherwise consumed. Boiling of the accumulator tank and boiler must be avoided. Primary air hatch to pos 5 Secondary air hatch to pos 3

  • Ariterm 35+, 16 SERVICE AND MAINTENANCE Cleaning 1. Before cleaning the boiler, it is advisable first to heat it, preferably with softwood, in order to make it easier to remove soot. Clean the boiler’s convection section 2-4 times per month and whenever required. 2. Once the fire has gone out but the boiler is still hot, open the cleaning hatch on top and brush/scrape it clean. 3. Open the cleaning hatch at the side and remove any loose incrustation with an ash scraper. 4. Open the firebox hatch, clean the grate and empty the ashbox into a fire-proof ash bucke

  • Ariterm 35+, 17 Use of an oil burner An oil burner can be installed in the burner opening on the side of the boiler, either with or wit- hout the use of the quick-change hatch. When using the quick-change hatch, a hatch coupling must be fitted. e burner must always be removed from the combustion chamber when solid fuel is being burned. All hatches and air openings must be tightly closed when using an oil bur- ner. Use of electricity No electrical resistors can be installed in this boiler. ey should be fitted in the accum

  • Ariterm 35+, 18 WARRANTY AND REMOVAL FROM USE Warranty For Warranty Issues Ariterm Sweden AB refers to our local Distributor. Removal from use A boiler that has reached the end of its life can be used for scrap. MOST COMMON SPARE PARTS Part number Name Additional information Quantity 13863 Plane grate 1 13886 Askew grate 1 13611 Front brick lower 545x115x109 1 13612 Rear brick lower 545x126x88 1 13613 Lower brick 446x255x50 1 13614 Side bricks lower part 50x150x275 2 13615 Side bricks upper part left 50x131x322 1 13616 Side bricks upp

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 SEAL AquaSEAL SW-2600 Owner's operation manual seal/aquaseal-sw-2600-B49.pdf 29 Dec 2023 44
2 Sony VGN-FW235J Specifications sony/vgn-fw235j-M5O.pdf 30 Dec 2023 2
3 Coby DVD-588 Specifications coby/dvd-588-U56.pdf 01 Apr 2023 1 0.21 Mb
4 JVC KD-AVX33 Installation & connection manual jvc/kd-avx33-2S1.pdf 18 Apr 2023 4
5 Whirlpool RM988PXV Use & care manual whirlpool/rm988pxv-UGB.pdf 04 Nov 2023 28
6 International comfort products DFS2A318J2A Installation, start-up and service instructions manual international-comfort-products/dfs2a318j2a-AQ8.pdf 21 Sep 2022 19

Similar Resources:

  • Blodgett

    SB-10G

    (2 pages)
    ProjectItem No.Quantity Model SB-6G (6 pan convection steamer on a 24” gas boiler base) Model SB-10G (10 pan convection steamer on a 24” gas boiler base) Model SB-16G (16 pan convection steamer on a 36” gas boiler base)STEAMER CONSTRUCTION #4 Satin finish 304 stainless steel Welded stainless steel door with removable inner stainless stee …
  • Glow-worm

    Swift flow 100

    (28 pages)
    Installation InstructionsTo be left with the userBOWDEN HEATING PTY. LIMITED30, BEDFORD STREET, QUEANBEYAN, NSW 2620.Tel: 06 2996000 Fax: 06 2996711Fanned Flue Combination Boiler221017B.03.971004309AUSTRALIATHIS APPLIANCE MUST BE INSTALLED BY ANAUTHORISED PERSON …
  • CTC Union

    950

    (36 pages)
    Art.no 580090002/3Eng.Feb -03Providing sustainable energy solutions worldwide161 505 10-1 Installation- and maintenance instructionCTC 950Wall mounted oil-/gas-fired unit …
  • Immergas

    Victrix Superior Series

    (40 pages)
    VICTRIX SuperiorTOP 32 X ENLHandleiding met instructies enwaarschuwingen*1.036645BE2*FRManuel d'instructions et avertissements*1.036645BE1*IEInstruction andwarning book*1.036645ENG*ROManual de instrucţiuni șiavertizări*1.036645RUM*RU   *1.03 …
  • U.S. Boiler Company

    Revolution

    (4 pages)
    1788% High Efficiency Gas-fired Water Boiler• High Efficiency up to 88% AFUE• 6 Sizes Available • 62 - 190 MBH • Natural or LP Gas• Direct Vent or Induced Draft• Cast Iron Sectional Design with Diamond Pin Heat Transfer Surface• Water Boiler with Low Temperature Return Water Capabilities• Lifetime Limited WarrantyRevolu …
  • EI

    ONEX

    (76 pages)
    INSTALLER, THESE INSTRUCTIONS TO BE AFFIXED ADJACENT TO THE BOILER.ASMEcertifi ed62403535.R00 9/02/2010Installation and maintenance instructions for gas-fi red condensing hot water boiler OXIOM-3 …

Comments, Questions and Opinions: