  • 4 evo HE H - Installation & Servicing GENERAL Boiler Size H12, H16, H19, H22 Gas supply type and connection 2H-G20-20 mbar Rc 1 /2 ( 1 /2" BSP Female) Injector size Stereomatic 5.6mm dia. (HE 12 5.8mm dia). Flow connection 22mm copper Return connection 22mm copper Flue terminal diameter mm (in.) 100 (4) Maximum static water head m (ft.) 30.5 (100) Minimum static water

  • Evo HE H12, 24 evo HE H - Installation & Servicing INSTALLATION FLUE OUTLET rf8394-1 690mm Fixed 300mm min 30 FLUE TERMINAL POSITION rf8393-1 300mm min 300mm min 625mm Fixed Flat roof - with structure The terminal should be positioned so that products of combustion can safely disperse at all times. Pluming may occur at the termination so, where possible, terminal positions where this could cause a nuisance should be avoided. Minimum dimensions are shown below Terminal Position Minimum Dimension Directly below an opening, air brick

  • Evo HE H12, 19 evo HE H - Installation & Servicing INSTALLATION FLUE OUTLET 1. A maximum of 6 extension ducts (one suitably cut) plus the standard flue duct may be used together. 2. Flue extensions of greater length than 1m (39") should be supported with the bracket provided, suitably adjusted. Refer to Frame 20 & 26. 21 FLUE EXTENSION DUCTS - continued nm8733 Boiler Standard flue Terminal grille Flue length Extension flue 20 FLUE EXTENSION DUCTS - For total flue lengths greater than 595mm Pack D Flue extension duct kit conte

  • Evo HE H12, SERVICE INTERVAL RECORD It is recommended that your heating system is serviced regularly and that you complete the appropriate Service Interval Record Below. Service Provider. Before completing the appropriate Service Interval Record below, please ensure you have carried out the service as described in the boiler manufacturer's instructions. Always use the manufacturer's specified spare part when replacing all controls SERVICE 1 DATE ENGINEER NAME COMPANY NAME TEL No. CORGI ID CARD SERIAL No. COMMENTS SIGNATURE SERVICE 2 DATE ENGINEER NAME COMPANY NAME TEL No. CORGI ID CARD SERIAL No.

  • Evo HE H12, 11 evo HE H - Installation & Servicing GENERAL Non-return valve Automatic air vent Hose unions Additional stop valve Hose connector Hosepipe (disconnect after filling) Double check valve assembly (note direction of flow) Temporary hose (disconnect after filling) ecl6060 Note. The pump manufacturers' minimum requirements must be complied with. 5 LOW HEAD AND LARGE SYSTEMS WITH EXTENSIVE PIPE RUNS - OPEN VENT All dimensions in mm (in.). NB. Imperial dimensions are approximate 6 SEALED SYSTEM REQUIREMENTS This arrangement is useful for large systems where radiators at the extremities are difficult to vent. This can lead to pumping over with conventio

  • Evo HE H12, 14 evo HE H - Installation & Servicing INSTALLATION nm8779 40 94 8. Flue manifold. 10. Interpanel. 11. Burner assy. 12. Combustion chamber Insulation. 13. Heat exchanger. 14. Injector & housing. 15. Venturi assy. 16. Fan assy. 17. Gas pipe assy. 19. Gas control valve assy. 20. Fan bracket assy. 21. Orifice plate. 22. Flue thermistor. LEGEND 1. Front casing panel. 2. Sealing panel. 3. Sump cover plate. 4. Bottom casing panel. 5. Flue sensing nipple. 6. Return pipe. 7. Flow pipe. 10 BOILER ASSEMBLY - Exploded view 23. Control thermistor. 24. Overheat thermostat. 25. Ignition el

  • Evo HE H12, 20 evo HE H - Installation & Servicing INSTALLATION 23 CONDENSATE DRAIN The condensate drain provided on the boiler must be connected to a drainage point, preferably within the building. Ensure that the condensate trap is full of water before commissioning the boiler. The routing of the drain must be made to allow a minimum fall of 1 in 20 away from the boiler, throughout its length. The drainage pipework must be arranged so that obstruction (e.g. through freezing) of external drainage pipe does not

  • Evo HE H12, 6 evo HE H - Installation & Servicing GENERAL nm8778 The boiler flow and return pipes are supplied fitted to the boiler ready for top connection Notes. a. For the heating loads in excess of 60,000 Btu/h, 28mm (1") flow and return pipes should be used to and from the boiler. b. This appliance is NOT suitable for use with a direct hot water cylinder. 1 BOILER WATER CONNECTIONS nm7291 nm7292 2 BOILER CLEARANCES all dimensions in mm (in.) The following minimum clearances must be maintained for operation and servicing. Additional space will be requir

  • Evo HE H12, CONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxes TIME & TEMPERATURE CONTROL TO HEATING ROOM T/STAT & PROGRAMMER/TIMER PROGRAMMABLE ROOMSTAT TIME & TEMPERATURE CONTROL TO HOT WATER CYLINDER T/STAT & PROGRAMMER/TIMER COMBI BOILER HEATING ZONE VALVES FITTED NOT REQUIRED HOT WATER ZONE VALVES FITTED NOT REQUIRED THERMOSTATIC RADIATOR VALVES FITTED AUTOMATIC BYPASS TO SYSTEM FITTED NOT REQUIRED FOR ALL BOILERS CONFIRM THE FOLLOWING THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOI

  • 48 evo HE H - Installation & Servicing FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING 75 H......F........ (FLAME DETECTION - SHORT CIRCUIT ERROR) Replace flame detection electrode Is there continuity between the 2 terminal pins ? Replace PCB. NO YES 76 H.....4...... (FLUE THERMISTOR ERROR) Check wiring for continuity from the PCB to the flue thermistor Ca

  • Evo HE H12, 36 evo HE H - Installation & Servicing SERVICING GENERAL When replacing ANY component: 1. Isolate the electricity supply. 2. Turn off the gas supply. 3. Remove the boiler front panel. Refer to Frame 38. After replacing ANY component check operation of the boiler including gas soundness, gas rate and combustion test. THE BOILER MUST NOT BE OPERATED WITHOUT THE SEALING PANEL FITTED 53 CONTROL THERMISTOR REPLACEMENT 1. Refer to Frame 52. 2. Remove the boiler front and sealing panels. Refer to Frames 45 & 46. 3. Pull the electrical leads off the control thermistor. 4. Pull the control thermistor and spring clip off the IMPORTANT When work is complete, the sealing panel mu

  • Evo HE H12, 18 evo HE H - Installation & Servicing INSTALLATION FLUE OUTLET 17 PREPARING THE WALL IMPORTANT. Ensure that, during the cutting operation, masonry falling outside of the building does not cause damage or personal injury. 1. Cut the flue hole (preferably with a 5" core boring tool), ensuring that the hole is square to the wall. Both wall faces immediately around the cut hole should be flat. 2. Drill 3 holes with a 7.5mm / 8mm masonry drill and insert the plastic plugs provided, for the wall mounting plate and the jacking screw plate. Note. If using the stand-off kit then drill 4 holes (choosi

  • 25 evo HE H - Installation & Servicing INSTALLATION FLUE OUTLET rf8737 rf8738 31 FLUE ARRANGEMENT Note. The equivalent flue length resistance of the elbow kits are: 90 o elbow kit = 1m 45 o elbow kit = 0.6m 203323-2.pmd 21/09/2007, 11:2625

  • Evo HE H12, 16 evo HE H - Installation & Servicing INSTALLATION 13 BOTTOM PANEL REMOVAL 1. To remove the front panel remove the 2 screws from the bottom panel. 2. Lift the panel up and off the top pegs. 3. To remove the bottom panel remove the 2 screws. 4. Pull the RH side of the panel down. Slide it to the right and withdraw. 3 1 Wall Thickness X 160 mm 160 + S = 193mm nm8943 IMPORTANT. The boiler MUST be installed in a vertical position. Dimension X - Wall thickness. Dimension L - Wall thickness plus boiler spacing. Dimension S - Stand-off frame depth = 33mm. 14 DETERMINING THE FLUE LENGTH AND FLUE PAC

  • Evo HE H12, 41 evo HE H - Installation & Servicing SERVICING 1. Refer to Frame 52. 2. Remove the boiler front and sealing panels. Refer to Frames 45 & 46. 3. Pull off the silicon tube from the thermistor housing. 4. Remove the aluminium nipple securing the thermistor to the flue manifold. 5. Withdraw the thermistor. 6. Unplug the inline electrical connector. 7. Fit the new thermistor, using the gasket supplied. 8. Reassemble in reverse order. 9. Check operation of the boiler. Refer to Frame 52. 1. Refer to Frame 52. 2. Remove the boiler front and sealing panels. Refer to Frames 45 & 46. 3. Pull off the electrical leads from the thermostat body. 4. Pull the thermostat and clip fro

  • Evo HE H12, 42 evo HE H - Installation & Servicing SERVICING Rear Front Combustion chamber LH Side RH Side nm8748 7 6 5 65 COMBUSTION CHAMBER INSULATION REPLACEMENT 1 The insulation boards used in the combustion chamber of this product are made of high temperature glass fibres with a binder of organic and inorganic materials. Wolseley Centers Ltd. recommend that, for your own comfort and safety and to comply with good working practice, the procedure described below is followed: 1. Refer to Frame 52. 2. Remove the boiler front and sealing panels. Refer t

  • Evo HE H12, 21 evo HE H - Installation & Servicing INSTALLATION 25 CONDENSATE PIPE TERMINATION CONFIGURATIONS . . . continued BOILER cla7773 3. INTERNAL CONNECTION TO SOIL AND VENT STACK * Make connection to SVP using a solvent welded saddle BOILER External wall Ground Level Termination to Soak away cla7774 minimum 500mm BOILER External wall Ground Level Open end of pipe direct into gulley below grating but above water level DRAIN cla7775 4. TERMINATION TO SOAK AWAY 5. TERMINATION TO DRAIN / GULLEY Termination into a down pipe can take place providing it can be confirmed that the down pipe is part of a combined waste and rain wa

  • Evo HE H12, 5 evo HE H - Installation & Servicing GENERAL CONTENTS Air Supply ....................................................................... 9 Benchmark Commissioning Checklist ..................... 54 Boiler Clearances ......................................................... 6 Boiler Exploded Diagram ............................................ 14 Electrical Connections ............................................... 27 Electrical Supply ........................................................... 9 El

  • Evo HE H12, 32 evo HE H - Installation & Servicing INSTALLATION 42 GENERAL CHECKS Make the following checks for correct operation: 1. Central Heating The correct operation of ANY programmer and all other system controls should be proved. Operate each control separately and check that the main burner or circulating pump, as the case may be, responds. Ensure the external controls are calling for heat. After ignition the display should read: 2. Gas Rate Operate the boiler for 10 minutes. Check the boiler gas rate (see Table 2), ensuring the boiler is at full output whilst measurements are

  • Evo HE H12, 37 evo HE H - Installation & Servicing SERVICING Gasket Orifice plate Ecl 2336 5 3 7 4 55 BURNER REPLACEMENT 54 FAN REPLACEMENT 1. Refer to Frame 52. 2. Remove the boiler front and sealing panels. Refer to Frames 45 & 46. 3. Disconnect the electrical leads from the fan. 4. Unscrew the gas pipe union connection to the injector housing. 5. Unscrew and remove the screw retaining the fan mounting bracket. 6. Remove the fan and venturi assembly. 7. Remove the 3 screws and remove the venturi assembly, noting the orientation of the venturi in relation to the fan body. 8. Transfer the venturi assembly to the new fan, replacing th

  • Evo HE H12, 35 evo HE H - Installation & Servicing SERVICING 50 CLEANING THE HEAT EXCHANGER 49 CLEANING THE CONDENSATE 'S' TRAP 1. Undo the plastic union nut on the condensate ‘S’ trap outlet. 2. Remove the 2 screws. 3. Pull the trap down and forward to remove. 4. Flush out any deposits with clean water. 51 REASSEMBLY Reassemble the boiler in the following order. 1. Refit the condensate ‘S’ trap, ensuring that it is full of water. 2. Refit the sump cover plate. 3. Refit the electrodes (check dimensions Frames

  • Evo HE H12, 13 evo HE H - Installation & Servicing GENERAL Safety valve setting 3.0 bar 2.5 bar 2.0 bar Vessel charge and initial 0.5 1.0 1.5 0.5 1.0 1.5 0.5 1.0 system pressure bar bar bar bar bar bar bar bar Total water content of system Expansion vessel volume litres litres 25 2.1 2.7 3.9 2.3 3.3 5.9 2.8 5.0 50 4.2 5.4 7.8 4.7 6.7 11.8 5.6 10.0 75 6.3 8.2 11.7 7.0 10.0 17.7 8.4 15.0 100 8.3 10.9 15.6 9.4 13.4 23.7 11.3 20.0 125 10.4 13.6 19.5 11.7 16.7 29.6 14.1 25.0 150 12.5 16.3 23.4 14.1 20.1 35.5 16.9 30.0 175 14.6 19.1 27.3 16.4 23.4 41.4 19.7 35.0 200 16.7 21.8 31.2 18.8 26.8 47.4 22.6 40.0 225 18.7 24.5 35.1 21.1 30.1 53.3 25.4

  • Evo HE H12, 47 evo HE H - Installation & Servicing FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING Does the pump setting give a differential across the boiler in excess of 25 o C ? Can the overheat condition be reset by pressing the boiler reset button when the system is cold ? YES YES NO 72 L.......A........ (OVERHEAT ERROR) Fill and vent the system and open all isolation valves Is the boiler and CH system filled with water and all isolation valves open ? NO Replace overheat thermostat 73 L....8..... (FAN ERROR) Is nominal 330 V DC present across red and blue at the fan connector as reset button is pressed? Replace fan YES NO

  • Evo HE H12, Advanced High Efficiency Boilers Installation & Servicing Instructions See reverse for evo HE Users Guide Manufactured exclusively for Wolseley Centers Ltd. by Ideal Boilers For details of document amendments, refer to page 3 H12, H16, H19, H22 (V3 Flue System) Wall mounted, balanced flue, fanned gas boiler October 2007 UIN 203323 A02 203323-2.pmd 21/09/2007, 11:261

  • Evo HE H12, 44 evo HE H - Installation & Servicing SERVICING 67 BOILER SEALING PANEL SEAL REPLACEMENT 1. Refer Frame 52. 2. Remove the front panel. Refer to Frame 45. 3. Remove the boiler sealing panel. Refer to Frame 46. 4. Remove the old seal from the casing and thoroughly clean the casing surfaces. 5. Fit the new adhesive seals - note that they are supplied to the correct length for the relevant sides. 6. Reassemble in reverse order. Note. Ensure that the boiler sealing panel is correctly seated, compressing the seal to make an airtight joint. 7. Check operation of boiler. Refer to Frame 52. 68

  • 23 evo HE H - Installation & Servicing INSTALLATION FLUE OUTLET Flue duct support Vertical connector 90 o elbow 45 o elbow Roof Flue Extentsion Duct nm8810 Flue Terminal Flue Seal Collar - Flat Roof Flue Seal Collar - Tile Roof 29 ROOF FLUE KIT CONTENTS / OPTIONS 28 FITTING THE OPTIONAL ROOF FLUE KIT (Flat or Pitched) nm8736 Note. A flat or pitched roof flashing plate (not suppli

  • Evo HE H12, 40 evo HE H - Installation & Servicing SERVICING 62 MAINS SWITCH REPLACEMENT 1. Refer to Frame 52. 2. Remove the boiler front and bottom panel. Refer to Frames 45 & 46. 3. Remove the 2 control box screws and lower the control box. 4. Push out the mains switch from the rear, as shown. 5. Refit the new switch, ensuring that the electrical leads are replaced on the correct terminals (refer to Frame 38) and the key on the switch is correctly aligned with the slot in the plastic moulding. 6. Reassemble in reverse order. 7. Check operation of the boiler. Refer to Frame 52. 61 CONTROL BOX REPLACEMENT 1. Refer to Frame 52.

  • 22 evo HE H - Installation & Servicing INSTALLATION nm8755 2 1 3 Note. Before fitting the flue turret fill the condensate trap within the boiler by pouring a cupful of water into flue outlet A. Make sure the plastic cap is removed from the end of the condensate drain adapter. Take care to ensure that the water is only poured into the flue outlet, and does not spill into the boiler casing

More Instructions:

DOWNLOAD

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 Philips SRU4008/27 Owner's manual philips/sru4008-27-UK8.pdf 30 Jan 2023 39 0.74 Mb
2 Frigidaire RH30WC55G Parts catalog frigidaire/rh30wc55g-P64.pdf 31 Jan 2024 4 0.62 Mb
3 Greenlee PA9676 Instruction manual greenlee/pa9676-66F.pdf 07 Feb 2023 2
4 Lenovo ThinkPad Z60t 2513 Install manual lenovo/thinkpad-z60t-2513-77O.pdf 14 Aug 2022 2
5 JVC TK-C8301RU Instructions manual jvc/tk-c8301ru-322.pdf 07 Feb 2023 48
6 Motorola Astro Digital Spectra Series Parts list motorola/astro-digital-spectra-series-62Q.pdf 04 Aug 2022 12

Similar Resources:

  • Navien

    NFB-301C

    (4 pages)
    1󱂓 Unpacking Navien Condensing BoilerUser’s Information Manual, Installation & Operation ManualAir VentCondensate TrapVent Termination CapsWall FlangesWall Mounting Bracket (with Anti-Vibration Rubber Pad)* Included in the L boxTapping Screws and Anchors (x6)Pressure Relief Valve, HeatingConversion KitOutdoor Temperature Sensor and CableAir Vent …
  • Bosch

    Worcester Greenstar 8000 Series

    (80 pages)
    6720883855 (2019/01) UK/IEInstallation and Maintenance InstructionsGas fired condensing system boilerGreenstar 8000 StyleGR8700iW 30 S | GR8700iW 35 S | GR8700iW 30 SB | GR8700iW 35 SB …
  • Viessmann

    VITOTRONIC 200

    (104 pages)
    VIESMANNInstallation and serviceinstructionsfor contractorsVitotronic 200Type KW1Weather-compensated, digital boiler control unitFor applicability, see the last pageVITOTRONIC 2005862 699 GB 8/2008 Please keep safe. …
  • Pelltech

    PK100

    (30 pages)
    Pellet boiler PK30, PK50, PK100 and PK160 Installation and user manual DK9803A3 …
  • Rinnai

    Demand Duo 80

    (32 pages)
    Demand Duo™ 80 Installaon and Operaon Manual — Do not store or use gasoline or other ammable vapors and liquids in the vicinity of this or any other appliance. — WHAT TO DO IF YOU SMELL GAS • Do not try to light any appliance. • Do not touch any electrical switch; do not use any phone in your …
  • Grant

    70/90

    (44 pages)
    USER, INSTALLATIONandSERVICING INSTRUCTIONSEuroflame Outdoor Condensing OilBoilersFor use with Kerosene onlyPart No. IRL 010 Rev. 02 April 2010Euroflame External Moduleswith outputs from 50,000 to 120,000 Btu/hThis appliance is deemed a controlled service and specific regional statutoryrequirements may be applicable.After installing the boiler leave these in …

Comments, Questions and Opinions: