Chappee 1.45 FF HTE Installers And Users Instructions
|
Chappee 1.45 FF HTE, 18 R Electrical safety of the appliance is only guaranteed by correct grounding, in compliance with the applicable laws and regulations. Connect the boiler to a 230V monophase + ground power supply by means of the three-pin cable supplied with it and make sure you connect polarities correctly. Use a double-pole switch with a contact separation of at least 3mm in both poles. In case you replace the power supply cable fit a HAR H05 VV-F’ 3x0.75mm 2 cable with an 8mm diameter max. The fuse, a fast-acting type rated 2A, is incorporated into the power supply terminals (remove the black fuse holder to enable inspection and/or replacement). IMPORTANT
6 a) Press either of the keys to access the programming function; the display will show the letter P followed by a number (program line); 020503_0700 Figure 3 b) press the keys until the display shows P1, referring to the time to be set; c) press the keys to set the time; on the display, the letter P will start to flash; d) press the key to save and exit the programming func
Chappee 1.45 FF HTE, 20 Turn the control box downward to access terminal board M2 used for the electrical connections by removing the two protective covers (see figure 9). Terminals 1-2: connection of SIEMENS model QAA73 temperature regulator supplied as accessory. Connection polarity is irrelevant. The jumper fitted across the “TA” terminals 3-4 must be removed. Read the instructions supplied with this accessory for correct installation and programming proce- dures. Terminals 3-4: “TA” room temperature thermostat connection. Thermostats with integral
Chappee 1.45 FF HTE, 13 R We guarantee ease and flexibility of installation for a gas-fired forced draft boiler thanks to the fittings and fixtures supplied (described below). The boiler is especially designed for connection to an exhaust flue / air ducting, with either coaxial, vertical or horizontal terminal. By means of a splitting kit a two-pipe system may also be installed. In case exhaust and intake flues not supplied by CHAPPEEhave been installed, these must be certified for the type of use and must have a maximum pressure drop of 100 Pa. Warnings for the following types of installation: C 13 , C 33 The terminals for the split flue must be provided for within a square with 50 c
Chappee 1.45 FF HTE, Boiler model 1.45 FF HTE 1.55 FF HTE 1.65 FF HTE Category II2H3P II2H3P II2H3P Rated heat input kW 46,4 56,7 67,0 Reduced heat input kW 15 16,0 20,0 Rated heat output 75/60°C kW 45,0 55,0 65,0 - kcal/h 38.700 47.300 55.900 Rated heat output 50/30°C kW 48,7 59,5 70,3 - kcal/h 41.880 51.170 60.460 Reduced heat output 75/60°C kW 14,5 15,5 19,3 - kcal/h 12.470 13.330 15.820 Reduced heat output 50/30°C kW 15,8 16,8 21,0 - kcal/h 13.588 14.450 18.060 Useful efficiency according to 92/42/CEE directive — ★★★★ ★★★★ ★★★★ Cent
Chappee 1.45 FF HTE, 17 R To ensure the correct rated heat input to the maximum and minimum heat input, it is necessary to update the speed (rpm) of the fan, it depends on the lenght of the pipes (par. 12), in accordance with the installation of flue and air pipes as indicated in the tables below. The factory-set value is referred to the minimum length of flue pipe (0÷4 m for concentric, 0÷20 m for twin). To carry such updating, changing the speed of the fan (rpm) at the maximum and minimum heat input, refer to par. 15. COAXIAL PIPE Ø 80/125 (C13-C33-C43) Pipes length (m) 0 - 4 5 - 10 Parametres H536-H613 Max heat output (rpm) 5500 5900 Par
Chappee 1.45 FF HTE, 3 R Instructions pertaining to the user 2. Instructions prior to commissioning Initial lighting of the boiler must be carried out by a licensed technician. Ensure the following ope- rations are carried out: a) compliance of boiler parameters with (electricity, water, gas) supply systems settings. b) compliance of installation with the laws and regulations in force. c) appropriate connection to the power supply and grounding of the appliance. Failure to observe the above will render the guarantee null and void. Prior to commissioning remove the protective plastic coating from the unit. Do not use any tools or abrasive detergents as you may spoil the painted surfaces. This boiler
Chappee 1.45 FF HTE, 7 R - As supplied by the factory the appliance is set up with the domestic hot water function always enabled and the domestic hot water programming function disabled. The instructions for enabling this program are given in chapter 15, which is addressed specifically to installers (parameter H91). If the program is enabled program lines from 31 to 36 must be set up as described in heading 3- 5.1. - press either of the keys to access the programming function; - press these keys until the display shows P5, referring to the temperature to be
Chappee 1.45 FF HTE, 29 R To measure combustion performance and hygiene levels of combustion products, the forced draught boiler models are equipped with two test points on the tapered coupling specifically designed for this purpose. One of the two test points is connected to the exhaust flue duct to allow measurements of the com- bustion products hygienic standards and combustion efficiency. The second test point is connected to the comburant air inlet duct to check possible combustion products circulation in case of coaxial ducts. The exhaust flue duct test point allows measurements of the following: • combustion products temper
Chappee 1.45 FF HTE, 3 157, Avenue Charles Floquet 93158 Le Blanc-Mesnil - Cedex Téléphone : + 33 (0)1 45 91 56 00 Télécopie : + 33 (0)1 45 91 59 50 www.chappee.com BAXI S.A. au capital de 43 214 640 € RCS Bobigny B 602 041 675 A.P.E 282 D
Chappee 1.45 FF HTE, 2 Dear Customer, We are sure your new boiler will comply with all your requirements. Purchasing one of our products satisfies your expectations: good func- tioning, simplicity and ease of use. Do not dispose of this booklet without reading it: you can find here some very useful information, which will help you to run your boiler correctly and efficiently . Do not leave any parts of the packaging (plastic bags, polystyrene, etc.) within children’s reach as they are a potential source of danger. The boilers bear the CE mark in compliance with the basic requirements as laid down in the following Directives: - Gas Directive 90/396/CEE - Performance Directive 92/42/CEE - Ele
Chappee 1.45 FF HTE, 11 R Instructions pertaining to the installer This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure. The boiler must be connected to a central heating system and, on models withis option, to a domestic hot water supply system in compliance with its performances and output power. IMPORTANT! The gas boiler is supplied without the following components witch must be performed exclusively by qualified personnel: • Expansion vessel; • Pressure relief valve; • Circulating pump; • Boiler filling tap. Before connecting the boiler hav
Chappee 1.45 FF HTE, 24 R The domestic hot water pump (P3), which directs flow into an eternal storage tank, is connected to terminals 13-14 of boiler terminal strip M3 (figure 12). The electrical specifications of the pump must be as follows: 230 V AC; 50 Hz; 1 A max; cos φ > 0.8. If the specifications of the installed pump are different, a relay must be wired between the boiler control circuit board and the pump. Remove the resistor from terminals 9-10 of terminal strip M2 (figure 12), and connect the hot water priority NTC sensor, which is supplied as an accessory. The sensing element of
Chappee 1.45 FF HTE, 8 R If a fault occurs, a flashing warning code appears on the display. The fault warnings appear on the main display (figure 1 a) together with the symbol (Figure 4). To reset, press the reset button for at least two seconds. 020503_0500 Figure 4 Fault warnings appear on the secondary display (figure 1 b) alternating with the time, both of them flashing (figure 4.1). It is not possible to reset malfunction warnings which appear on the secondary display as the cause of the alarm has first to be removed. 3.8 Fault wa
Chappee 1.45 FF HTE, 14 Flue terminal diameter 133 mm 133 mm - Each 45° bend reduces the duct max. length by 0,5 m 0,25 m 0,25 m Each 90° bend reduces the duct max. length by 1 m 0,5 m 0,5 m Max. length of flue duct 10 m 15 m 60 m Flue duct terminal Coaxial Ø 80/125 mm Vertical two-pipe Horizontal two-pipe Outer terminal diameter 125 mm 80 mm 80 mm … coaxial flue - air duct (concentric) 990519_0400 Concentric outlet Figure 8 Horizontal flue terminal Ø 80/125 mm installation options LAS flue duct Ø 80/125 mm installation o
5 020503_0800 Figure 2 a) Automatic operation. Operation of the boiler is controlled by the timed program as described in point 3-5.1 “Daily timed program for operation of the central heating system”; b) Manual operation at the maximum temperature set. The boiler comes into operation regardless of the timed program set. The operating temperature is that set using the key (po
Chappee 1.45 FF HTE, 27 If the electronic circuit board is replaced, make sure that the parameters set are those specific to the boiler model, as indicated in the documentation available from the authorised Service Centre. Table 4 Parameter N. H90 H91 H505 H507 H516 H532 H533 H536 H612 H613 H544 H545 H552 H553 H615 H632 H641 H657 Description Setting for domestic hot water reduced temperature (°C) D.H.W. (Domestic Hot Water) program (0 = enabled; 1 = disabled) Maximum tem
Chappee 1.45 FF HTE, 15 Vertical flue terminal Ø 80/125 mm installation options This type of installation can be carried out both on a flat or pitched roof by fitting a terminal, an appropriate weathering tile and sleeve, (supplementary fittings supplied on demand). … twin flue-air ducting This type of ducting allows to disengage exhaust flue gases both outside the building and into single flue ducts. Comburant air may be drawn in at a different site from where the flue terminal is located. The splitting kit consists of a flue duct adaptor (
9 All the faults are displayed in order of importance; if several faults occur simultaneously, the first to be displayed is the one with highest priority. After the cause of the first fault has been removed, the second one will be displayed, and so on. If any given fault occurs frequently, contact the authorised Service Centre. Fault description outdoor temperature p
10 To maintain efficient and safe operation of your boiler have it checked by a Qualified Service En- gineer at the end of every operating period. Careful servicing will ensure economical operation of the system. Do not clean the outer casing of the appliance with abrasive, aggressive and/or easily flammable cleaners (i.e.: gasoline, alcohol, and so on). Always isolate the electr
Chappee 1.45 FF HTE, 23 R c) with AGU2.500 device for control of a low temperature system: Refer to the instructions provided with the AGU2.500 accessories for connection and control of a low temperature zone. In this case the set of some electronic parameters have to be modified (see § 15). The electrical connection and settings needed to control a system divided into zones vary depending on the accessories connected to the boiler. a) Without QAA73 room temperature control device: The contact relating to the request for operation of th
Chappee 1.45 FF HTE, 16 Twin horizontal flue terminals installation options IMPORTANT: Ensure a minimum downward slope of 1 cm toward the outside per each metre of duct length Make sure that the exhaust and intake ducts are securely fixed to the walls. (L1 + L2) max = 60 mL max = 15 m 0310_3002 The maximum length of the suction duct must be 15 metres. Twin vertical flue terminals installation options IMPORTANT: if fitting a single exhaust flue duct, ensure it is adequately insulated (e.g.: with glass wool) wherever the duct passes through building walls. For detailed instructi
Chappee 1.45 FF HTE, 19 Figure 10 0601_2002/CT_0676 Terminal board Terminal board Terminal board Cover Cover 0603_1701/CG_1789 Expansion vessel Safety valve (*) (*) (*) (*) available optional extra P1 = Low loss header pump P2 = Heating circuit pump SI = Low loss header (available optional extra) UR = Central heating unit
Chappee 1.45 FF HTE, 2 Installer’s and User’s Instructions 11 11 1 .45 FF HTE.45 FF HTE .45 FF HTE.45 FF HTE .45 FF HTE 11 11 1 .55 FF HTE.55 FF HTE .55 FF HTE.55 FF HTE .55 FF HTE 11 11 1 .65 FF HTE.65 FF HTE .65 FF HTE.65 FF HTE .65 FF HTE Wall-mounted condensing boilers
Chappee 1.45 FF HTE, 4 KEYS DISPLAY SYMBOLS Central heating mode setting key Data display reset key Parameter setting key (increase value) Parameter setting key (decrease value) Program access and scroll key Program access and scroll keys Reset key Domestic hot water temperature setting key Central heating water temperature setting key Domestic hot water on/off key Resettable alarm warning Flame present (on) Outdoor temperature Standby (off) Operation in manual mode at minimum temperature Operation in manual mode at the maxi- mum temperature set Operation in automatic mode Operation in central heating mode Operation in domestic hot water mode 020503_1 100 Figure
UTICA BOILERS MAHF-125 Boiler Installation, operation & maintenance manual
MAHF-125 |
Chappee initia MASTER 2.24 FF Boiler Installers and users instructions
initia MASTER 2.24 FF |
Bradford White JVS Boiler Installation and operation instructions manual
JVS |
Viessmann Vitodens 200-W System Boiler Technical data manual
Vitodens 200-W System |
Potterton Powermax HE 150 Boiler Installation & servicing instructions manual
Powermax HE 150 |
Chappee NXR3 Boiler Installation manual
NXR3 |
Ferroli ECONCEPT 51 A Boiler Instructions for use, installation and maintenance
ECONCEPT 51 A |
Dunkirk ESC-3090S Boiler Installation, operation & maintenance manual
ESC-3090S |
# | Manufacturer | Model | Document Type | File | Updated | Pages | Size |
---|---|---|---|---|---|---|---|
1 | Zanussi | ZBF11420SA | Operation & user’s manual | zanussi/zbf11420sa-E34.pdf | 18 Dec 2023 | 24 | |
2 | Diono | Radian R120 | Instruction manual | diono/radian-r120-VJ8.pdf | 07 Jan 2024 | 48 | |
3 | Rane | MA 6s | Operator's manual | rane/ma-6s-QU8.pdf | 28 Dec 2023 | 6 | 0.27 Mb |
4 | NHK | KE-5A | Instruction manual | nhk/ke-5a-G95.pdf | 22 Jan 2024 | 35 | |
5 | Escene | SayHi CC800 | Operation & user’s manual | escene/sayhi-cc800-H4J.pdf | 02 Oct 2023 | 83 | |
6 | Omega Engineering | ILD24-C2 | Operation manual | omega-engineering/ild24-c2-FR9.pdf | 14 Jul 2023 | 2 |
Crown Boiler
Tel: (215) 535-8900 • Fax: (215) 535-9736 • www.crownboiler.comManufacturer of Hydronic Heating ProductsP.O. Box 14818 3633 I. StreetPhiladelphia, PA 19134BWF Series Gas-Fired Fan Assisted Hot Water Boilers INSTALLATION INSTRUCTIONS These instructions must be affixed on or adjacent to the boilerWARNING: Improper installa-tion, adjustment, alterati …
BWF095(54 pages) |
COSMOGAS
INSTRUCTION MANUAL FOR INSTALLATION AND MAINTENANCE OF GAS BOILERSPLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE62403425 - R00 07-12-2007_GB-IEMODELES:NOVADENS 24 - 24BNOVADENS 24C - 24PNOVADENS 34 - 34BNOVADENS 34C - 34P
…
NOVADENS 24(56 pages) |
M&G
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Listed to standards: UL-103UL-103HT ULC-S604 ULC-C959 INSTALLATION AND MAINTENANCE INSTRUCTIONS Factory-Built Chimney •BoilerStack •EngineExhaustDuraStack PROMODELS DCL, DAS1, DIS1, DIS2, DIS4 DCL:SingleWallDAS1: Air InsulatedDIS1, DIS2, DIS4: A.E.S Refracto …
DuraVent DuraStack PRO DCL(35 pages) |
Vetus
BoilersCalorifiersWarmwasserspeicherChauffe-eauCalderasCaldaieWH20BWH31BWH45BWH55BWH75BBedieningshandleiding en installatieinstructiesOperation manual and installation instructionsBedienungshandbuch und EinbauanleitungManuel d’utilisation et d’installationManual de manejo y instrucciones de instalaciónManuale per l’uso eistruzioni per il montaggio …
WH20B(20 pages) |
Viessmann
Service instructionsfor contractorsVIESMANNVitoflame 100Type VEH IIIPressure-jet oil burnerfor Vitoplex 200 and 300, 80 to 300 kWfor Vitorond 100 and 200, 80 to 270 kWfor Vitoradial 300-T, 90 to 300 kWFor applicability, see the last pageVITOFLAME 1005692 870 GB 8/2010Please keep safe.
…
Vitoflame 100(56 pages) |
Weil-McLain
In an effort to provide the industry with the best available technology for clean efficient combustion of fuel oil, Weil-McLain has standardized the GOLD Oil boiler burner control offering to include the Carlin 60200-02 primary control and 14,000 volt solid state ignitor. Listed below are some helpful tips for understanding these new controls. Carlin 60 …
SB0002(2 pages) |
Husqvarna Chainsaw 435 II#6AD7T3 435 II: Husqvarna Chainsaw Owner Documentation 435 II, 164 |
Taco Marine Racks & Stands GS-170Taco Marine Racks & Stands GS-170 Installation instruction manual GS-170, 8 |
Sonel Control Unit OR-1Sonel Product User Guide: OR-1 PDF Operating manual - 2MNYT6 OR-1, 4 |
Weed Eater Trimmer 530088959Guide: Weed Eater 530088959 (7U748P, Upd.28/08/2023) 530088959, 8 |
Contax Other KC130TMContax Product Guide: KC130TM PDF Installation - 438LGS KC130TM, 4 |
Mark Lighting Equipment SUPERMULTIPARLED 108/4iOperation & user’s manual for Mark SUPERMULTIPARLED 108/4i Lighting Equipment SUPERMULTIPARLED 108/4i, 8 |
Legacy Monitor LMR1046TLegacy Product Manual: LMR1046T PDF Instruction manual - 315VZ8 LMR1046T, 4 |
Ozone Headsets Blast STOzone Headsets Operation & user’s manual (File: ozone-blast-st-operation-user-s-manual-5, 22/01/2024) Blast ST, 5 |
GE Oven JK1000Oven PDF Owner's manual JK1000, 32 |
Braun Blender MULTIQUICK 3 MR 4050 CABraun Blender Operation & user’s manual (File: braun-multiquick-3-mr-4050-ca-blender-8, 16/10/2023) MULTIQUICK 3 MR 4050 CA, 8 |
Behringer Speakers Eurolive B1200D-PROEurolive B1200D-PRO (Speakers ePDF Manual, #4EF7DY) Eurolive B1200D-PRO, 4 |
S+S Regeltechnik Measuring Instruments PREMASGARD 711 Series#68Y75E: PREMASGARD 711 Series Measuring Instruments Operating instructions, mounting & installation PREMASGARD 711 Series, 32 |