Manualios.com

Ariterm Vedo Installation, Operation And Maintenance Manual

  • Vedo Boiler
  • mabT.mMjuEzcA
  • Installation, Operation And Maintenance Manual
  • PDF / Adobe Acrobat Reader
  • 28

Ariterm Vedo Manual Online:

4.5, 2380 votes
Ariterm Vedo User Manual
Ariterm Vedo User Guide
Ariterm Vedo Online Manual

Text of Ariterm Vedo User Guide:

  • Ariterm Vedo, 2 CONTENTS General .....................................................................................3 Installation ............................................................................4-5 Laddomat 21 Connection diagram ........................................6 Temperature control valve .......................................................7 About burning wood ...............................................................8 Operation .........................................................................

  • Ariterm Vedo, 21 OPERATING MENUS Even if the loading pump is switched ON, it will not rotate if the boiler water temperature is below the pump starting temperature (Set- ting- Tank pump start). You can test the fan and pump operation in the Testing menu. Select Menues and press the arrow right but- ton to access the main menu, which has the sub-menus Service, Settings and Testing Move to the previous menu by pressing the left arrow button. If no button has been activated for one minute, the view returns to the main screen. Service - menu e sett

  • Ariterm Vedo, 7 TEMPERATURE CONTROL VALVE e Ariterm Vedo boiler must be installed in connection with a warm water accumulator. is improves its functionality and extends its life span substantially. By installing the boiler as presented here, it is possible to make the boiler temperature rise quickly and to maintain a steady, high temperature when the boiler is being used. e fact that water is layered in the accumulator ensures a quick supply of warm water soon after heating starts. e heating circuit and household water circuit are connected to the accumulator. Installing a temperature control valve to wood-red

  • Ariterm Vedo, 19 P1 230 VAC 50Hz T2 T1 P3 T6 2. 3.4. 1. CONTENT OF DELIVERY AND INSTALLATION The delivery includes: 1. Control unit 2. Flue gas sensor 3. Boiler water sensor 4. Extension cable Installation It is preferable to place the control unit in a location where no extension is required for the cable of the flue gas or boiler water sensors. The extension cable for flue gas and boiler water sensor is 4 m long. 1. Remove control unit lid. 2. Fluegas fan, loading pump, temperature sensors and 230 VAC voltage input are connected to the terminal strips under- neath the control unit lid. P1=Flue gas fan P3=Loading pump T1=Flue gas sensor T2=Boiler water sensor T6=Acti

  • Ariterm Vedo, 18 General A flue gas fan is a standard equipment for the Ariterm Vedo. e fan system includes a control unit which runs the fan at a set speed during combustion periods. When a combustion period is over, the fan stops automatically. e fan unit can also be preset to work during pellet burning, in which case the rotating speed is set to alternate in line with standby mode and active combustion cycles. e fan control unit can also be used to control the warm water accumulator loading pump. • Flue gas fan: 50W-300W, 1~/230VAC • Warm water accumulator pump: 20W-300W, 1~/230VAC FLUE GAS FAN CONTROL

  • Ariterm Vedo, 16 Part Name Unit 1 Feeding hatch 2 Stoking hatch 3 Primary air vent 4 Secondary air vent 5 Convector door 6 Top door 7 Bottom door 8 Outlet to accumulator DN 32 9 Expansion vessel outlet DN 25 10 Cooling spiral Cu 15 11 Return from accumulator DN 32 12 Draining outlet DN 15 13 Water thermometer / pressure gauge 14 Flue connection 15 Flue gas fan 16 Control valve DN 15 17 Horizontal flue pipe 18 Burnet thermostat / sensor assembly DN 15 MEASUREMENTS AND CONNECTIONS

  • Ariterm Vedo, 10 OPERATION Starting the re: • Open the smoke pipe damper. Adjust primary air vent to 4 and secondary air vent to 5 (on 1 to 7 scale). • Start up the exhaust fan. • Open the feeding hatch, which causes the fire door damper to open automatically. • Stack with small firewood, enough to cover the bottom of the chamber. • Apply kindling on top of the wood. Start a fire. • Close the feeding hatch. • When the fire is properly burning and a layer of charcoal has formed, fill the firebox up no higher than to the top of the

  • 14 From time to time, you should check that the gap between the deflectors and the storage chamber is unblocked. Lift the deflectors from their supports to clean them. Also clean the walls of the storage chamber. Other maintenance procedures Adjustment of the hatches Check that the hatch sits tightly. A leaky fee- ding hatch will cause wood to combust in the

  • 11 Adding rewood Do not add firewood until after the first load has burnt down to a small amount of charcoal. Open the feeding hatch slowly to avoid a cloud of smoke caused by the carbon monoxide that may remain in the firebox. Add firewood. e amount of firewood should not be excessive so that the accumulator can capture all the thermal energy releas

  • Ariterm Vedo, 12 SERVICE AND MAINTENANCE Also check and, if necessary, clean the blades of the flue gas fan. Remove ash from the ce- ramic secondary combustion chamber through the ash box door. Open the convector cleaning door. Before each heating season Once a week and as required in the heating season Check that the holes of the grate are unblocked and that there is no combustion residue left from previous use. Always clean the convector after the flue gas temperature has risen by 30°C from clean boiler value, or the draft has w

  • Ariterm Vedo, 15 • Unscrew both mounting screws of the hinge piece enough to move the hinge. • Move the hinge piece slightly in the direc- tion of the boiler. • Tighten the mounting screws slightly and test whether the hatch now sits more tightly on the hinge side. • Once the hatch is sitting properly, tighten all the screws. If the adjustment tolerance on the hatch runs out, its seal will have to be replaced. Adjusting the hinge: SERVICE AND MAINTENANCE

  • 8 ABOUT BURNING WOOD Before starting the boiler, check the following: • Heating network and boiler are filled with water, pressure at least 0.5 bar • If there is a smoke pipe damper, make sure that it is open • e heat supply pump is switched on • e accumulator or network valves are open • e combustion air outlet is open • e

  • Ariterm Vedo, 13 SERVICE AND MAINTENANCE Make sure that the fire door damper opens and closes as you use the feeding hatch. Make sure that the fire door damper closes when you close the feeding hatch. Remove all turbulators. Clean the boiler convector by brushing the convector pipes clean.

  • Ariterm Vedo, 22 USER MENUS Fan delay time: When the combustion period is launched by pressing the + button, the fan start-up delay begins. During this delay period the flue gases should exceed the set temperature Fan/Temp. limit. When the temperature is above the limit, the fan will run until the temperature drops below the set value again. The factory set delay is 15 minutes. The delay can be set between 3 and 15 minutes. Fan speed: This percentage value expresses the fan rotating speed. It can be set between 0% and 100%. Tank pump start: When the loading pump has be

  • GENERAL Ariterm Vedo is an efficient, modern wood-fired boiler, which can also be equipped with a pellet or oil burner. It complies with the newest pollution and efficiency requirements laid down in D8. e boiler also meets the safety requirements laid down in EN 303-5. Due to the boiler’s excellent burning properties and good insulation, it is highly effici

  • Ariterm Vedo, 4 INSTALLATION Installation of the boiler can only be done by a company or individual with the necessary profes- sional accreditations. Installation should be performed so that it meets the minimum require- ments of the SFS 3332 standard. Electrical and burner installations must be done only by a qualified company or individual. Space requirements An area of 1 metre must be reserved in front of the boiler for cleaning and maintenance pro- cedures. Plumbing connections are located on top of the boiler with the exception of the return

  • Ariterm Vedo, 20 OPERATING MODES AND MENUS Towards the end of active combustion, the temperature of the flow gases will start to fall. When the temperature falls below the limit temperature (factory setting 90 °C, can be set between 70 and 150°C), the fan stops automatically. e factory setting for fan speed during active combustion is 60%. e speed can be adjusted between 0 and 100%. Pellet use If a pellet burner is in use, the fan control unit can be set to monitor the status of the burner (and not the flue gas temperature). e pellet burner active combustion

  • Ariterm Vedo, 17 TECHNICAL DATA TECHNICAL DATA Capacity With wood With pellets With oil 30 kW 30 kW 30 kW Dimensions Width Depth Height Weight (empty) Water capacity Flue connection 570 mm 1016 mm 1345 mm 415 kg 125 L diameter 140 mm (external) Design values Boiler pressure Permitted boiler temperature Size of warm water accumulator Maximum length of firewood 0,5-1,5 bar Max 20-120 °C 1100 – 2500 L 0,5 m Guarantee For Warranty Issues Ariterm Sweden AB refers to our local Distributor. Removal from use A boiler that has reached the end of its useful life can be used for scrap.

Related Products and Documents (Boiler):

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 Pro-Form PFTL78807.1 Operation & user’s manual pro-form/pftl78807-1-47D.pdf 06 Jul 2022 32
2 Beyblade Seaborg Instructions beyblade/seaborg-17E.pdf 12 Nov 2023 2 3.37 Mb
3 Braun NTF 3000 Instruction manual braun/ntf-3000-7IT.pdf 06 Mar 2024 87
4 Samsung DVD-C500 Operation & user’s manual samsung/dvd-c500-DBR.pdf 13 Jun 2023 16 2.26 Mb
5 Mackie d.4 Pro Owner's manual mackie/d-4-pro-L3F.pdf 13 Aug 2023 32
6 KYMCO 50 AGILITY RS 4T Specifications kymco/50-agility-rs-4t-6C5.pdf 31 Dec 2022 1

Similar Resources:

  • Lochinvar

    Crest w/RealTime O2 Trim 100 Series

    (60 pages)
    Service ManualModels: 1000 - 6000Series: 100 This manual must only be used by a qualified heating installer / service technician. Read all instructions, including this manual and the Crest Installation and Operation Manual, before installing. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial …
  • Ferroli

    ATLAS D 30 PLUS UNIT

    (96 pages)
    8cod. 3540U263 — 06/2012 (Rev. 00)ATLAS D 30 PLUS UNITIT - ISTRUZIONE PER L’USO L'INSTALLAZIONE E LA MANUTENZIONEES - INSTRUCCIONES DE USO, INSTALACIÓN Y MANTENIMIENTOTR - KULLANMA, KURULUM VE BAKøM TALIMATLARøEN - INSTRUCTIONS FOR USE, INSTALLATION AND MAINTENANCEFR - INSTRUCTIONS D'UTILISATION, D'INSTALLATION ET …
  • New Yorker

    CLASSIC CG-A SERIES

    (28 pages)
    1 8141959R15-2/04BEFORE INSTALLATION: READ THIS MANUALSAVE THESE INSTRUCTIONSInstalling contractor and homeowner should read and be informed as to the proper installation and operation of this boiler.The manufacturer will not be responsible for improper installation or operation. This manual and all associated instructionmaterial should be conspicuously post …
  • Amerec

    AI18

    (26 pages)
    4211-163 09-17-13 Technical Support: 1-800-363-0251 [email protected] 1 of 26 COMMERCIAL STEAM GENERATOR WITH COOLFLUSH™ AUTO DRAIN OPTION BOILERS FOR LARGE STEAM ROOMS INSTALLATION INSTRUCTIONS MODELS AI 12, AI 18 AI 24, AI 30, AI 36, AI 42 & AI 48 208 and 240V 1 & 3 phase, and 480V 3 …
  • Viessmann

    Vitodens 100-W

    (28 pages)
    VITODENS 100-WGas-fired wall-mounted condensing boiler37 to 118 MBH / 10.8 to 34.6 kWVitodens 100-WWB1B SeriesGas-Fired Wall-Mounted Condensing Boilerwith modulating stainless steel MatriX cylinderburner and stainless steel Inox-Radial heat exchangerfor room air independent operation(using a direct vent system) or roomair dependent operationTechnical Data …
  • Grant

    Vortex Pro Internal Combi Series

    (60 pages)
    UK | DOC 0122 | Rev 1.1 | May 2018Grant Vortex Pro Internal CombiCombi XS, Combi 21, Combi 26 and Combi 36 Condensing Oil Boiler RangeInstallation and Servicing Instructions …

Comments, Questions and Opinions: