Manualios.com

C&M 24 Installation And Operating Instructions Manual

  • 24 Boiler
  • maX6JM23n.TAE
  • Installation And Operating Instructions Manual
  • PDF / Adobe Acrobat Reader
  • 24

C&M 24 Manual Online:

4.5, 2443 votes
C&M 24 User Manual
C&M 24 User Guide
C&M 24 Online Manual

Text of C&M 24 User Guide:

  • C&M 24, 8 5 Please check that you are familiar with the installation requirements before commencing work.(section 6) The installation accessories described in the following list are included in the boiler packaging. - Hanging bracket - A paper template (showing the dimensions of the boiler with 5 mm side clearances, fitting instructions and commissioning instructions) - Connection tails - Screws and wall plugs - Connection washers and filters - Installation manual Method of positioning the boiler on the wall. The paper template can be used to ensure the correct positioning of kitchen cabinets etc. It also details the commi

  • 21 This appliance is suitable for Natural gas or LPG. A gas conversion must be made by a competent person. 17 18 If these solutions do not cure the fault, call a qualified professional Fault The boiler doesn’t start Red indicator alight Noises in CH system Radiators rise in temperature During summer season Cause No gas, no water or no electricity Air in the gas pipe Room thermostat swi

  • C&M 24, 14 Menu - 3 - Boiler options DISPLAY ACTION CONFIGURATION Section Digit 1 Digit 2 and 3 Under floor heating system 0 0 : no 1 : yes Factory setting once x times Menu - 4 - Boiler settings Section Digit Digit 1 2 and 3 Room thermostat operation 0 0 : Burner only 0 1 : Burner and pump Pump speed 1 0 : High speed 1 1 : Low speed Pump post circulation duration 2 0,0 min From 0 to 5 minutes by step of 0.5 min. 2 0,5 min 2 1,0 min 2 5,0 min Maximum Central Heating flow temperature 4 50°C 4 80°C CH anti cycling delay 8 0,0 min From 0 to 7 minutes by step of 0.5 min. 8 0,5 min 8 2,5 min 8 5,0 min CH maximum output limitation Model 24 From step 0 (P. min.) 8 kW Value from to step

  • 2 These instructions are suitable for the CENTORA GREEN System boilers : Do not forget the Log Book! Chaffoteaux & Maury supports Benchmark, the heating industry code to ensure the correct installation, commissioning and servicing of domestic central heating systems. To The Householder Make sure you have a completed Log Book for your boiler. This provides a re

  • C&M 24, 5 1.- Steel chassis complete with expansion vessel 2.- Sealed chamber 3.- Burner and heat exchanger assembly 4.- Air / gas connection 5.- 24 V modulating fan 6.- Gas valve 7.- Ignition electrode 8.- Ionisation probe 9.- Ignitor 10.- Combustion products manifold 11.- 24 V transformer 12.- Siphon 13.- Electrical box 14.- Pump 15.- Shunt plate 16.- Pressure gauge 18.- Automatic air separator and automatic vent 19 - Central heating flowswitch 21.- Central heating control thermistor 23.- Overheat sensor 42.- Silencer 1 2 3 4 5 6 8 11 12 13 14 35 30 24 34 1 INSTALLER’S

  • C&M 24, 10 6 P V P Fig. 12 Making the Electrical Connections Hinge down the electrical box to gain access to the electrical connections. Push in the tabs P (Fig 12) on either side of the boiler and pivot the box forward. Connect the main cable M to live, neutral and earth. If using a room thermostat or other external control : Undo the two retaining screws V , remove cover and remove cable clamp. J (right side) (Fig. 13) Remove connector C from the PCB in the cover Connect the external control cable in place of the link S on the multipin plug C Reconnect multipin plug into the socket on the printed circuit board. Secure the cable using

  • C&M 24, 15 Menu - 5 - Combustion rate control mode X X X X DISPLAY ACTION CONFIGURATION wait 5 ” Combustion rate control mode OFF Switching on the combustion rate control mode. Central heating output reach the maximum power set in menu 4 section 9. Central heating temperature is displayed in celsius degrees. The 3 dots indicate that the combustion rate control is ON at maximum output. Switching the combustion rate down to minimum power. Central heating temperature is displayed in celsius degrees. The dot indicates that the combust

  • 4 5 INSTALLING THE BOILER ...............................................................................................................................8 Method of positioning the boiler on th wall...............................................................................................8 Connecting the boiler to the system....................................

  • C&M 24, 20 As with your car, your boiler will work more reliably and efficiently if regularly serviced. We recommend an annual service check. The service history of the appliance will be marked on the logbook. 14 Turn off the boiler - Press on key 29 , to switch off CH mode. The green indicator 30 will stop - Switch off the main electrical supply - Shut off the gas service tap 39 (fig. 21) Note : In this conditions, the anti-freeze system is inoperative Stand by mode A fixed digit at the centre of the display and the green indicator 33 on Putting the boiler in stand by mo

  • C&M 24, 19 Switching on 1. Check that pressure in central heating system is above 0.7 bar and below 1.5 bar with the pressure gauge 16. 2. Check that the gas service tap is opened at the gasmeter and main power is on. Green indicator Power ON 33. 3. Open the gas tap 39 (Fig. 20). The boiler is now ready to use. Attention ! If the boiler stays a long time without working, some air in the gas pipe can hinder the first lightings. (please refer to Section 18 Incorrect Function) Switching on Central heating Press on key 29 , the green indicator 30 will

  • C&M 24, 1310360g- 3/2004 Chaffoteaux & Maury are continuously improving their products and therefore reserve the right to change specifications without prior notice and accepts no liability for any errors or omission in the information contained in this document. Manufacturer: Chaffoteaux & Maury - France Commercial subsidiary: MTS (GB) Limited MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone: (01494) 755600 Fax: (01494) 459775 Internet: www.chaffoteaux.co.uk E-mail: [email protected] Technical Support Help Line: 0870 241

  • C&M 24, CONDENSING WALL HUNG BOILER Central Heating - Fanned Flue system Installation and Operating Instructions Centora green system 24 Centora green system 30 c Manufactures N° Model Type Gas Council N° 200905821037.31 Centora Green System 24 Nat 41 - 980 - 12 200906822037.31 Centora Green System 30 Nat 41 - 980 - 31 GB IE Unit 3A, Thornton Road Ind. Estate Off Hockney Road Bradford, BD8 9HQ 01274 488 388 www.heatingspares247.com

  • C&M 24, 6 0 4 3 2 1 5 6 100 200 800 700 600 500 400 300 900 1000 1100 l/h mCE Débit mini (robinets thermostatiques fermés) Hauteur manométrique GVF GVO PVF PVO 20 40 60 80 100 120 Pf 140 160 180 200 220 240 0,7 0,8 0,9 1,0 1,1 1,2 1,3 1,4 1,5 1,6 1,7 1,8 1,9 2,0 Capacité maximale de l'installation (en litres) 80°C 70°C 60°C 50°C 40°C 260 Pression à froid pour le circuit chauffage (en bar) C liter 2 3 Fig. 5 Fig. 6 440 450 mini pour entretien With packaging : 24 43 kg 30 45,5 kg 108 108 JLN I 88 J L N 232 235 32 380 212 360 50 67 850 737 Safety valve center line All dimensions

  • C&M 24, 7 4 Location The boiler can be installed on any suitable internal wall. Provision must be made to allow the correct routing of the flue and siting of the terminal to allow the safe and efficient removal of the flue products. A compartment or cupboard may be used provided that it has been purpose-built or modified for the purpose. It is not necessary to provide permanent ventilation for cooling purposes. Detailed recommendations are given in BS 5440 pt 2. If it is proposed that it is installed in a timber framed building then reference must be made to British Gas Document DM2, or advice sought from CORGI. Avoid to install the boiler

  • C&M 24, 3 CUSTOMER CARE Page Guarantee ............................................................................................................................................................ 2 Statutory Requirements .......................................................................................................................................2 Contents ...............................................................................................................................................................3 INTRODUCTION ...........................................................................................................................................

  • C&M 24, 11 7 T T 1 2 Fig. 16 Fitting the casing Remove the protecting film from the casing : - Position the casing as shown in Fig. 16 - Slide down the casing and put the casing holes on the plastic pins located on the top of the chassis - Control the correct position of the casing onto the boiler - Tighten the 4 screws located at the bottom as shown in Fig. 15. 8 A A A A Fig.15 bar 0 1 3 4 Fig. 14 D 16 37 39 41 Commissioning and Testing (continued) Fitting the Casing By pass and Pump The boiler is fitted with a pre-adjusted by pass. Although adjustmen

  • C&M 24, 18 USER’S INSTRUCTIONS Control panel (Fig. 19) 16.- Pressure gauge 24.- Display temperature adjustment 27.- Setting key 28.- Setting key 29.- Switch for Central Heating mode 30.- Green indicator Central Heating 31.- Key to reduce the Central Heating temperature 32.- Key to increase the Central Heating temperature 33.- Green indicator - Power ON 34.- Orange indicator - Burner ON 35.- Red indicator - Lock out / flame failure 36.- Reset button 12 Connecting bracket Taps shown in Open position(fig. 21) 37 : Central heating flow isolating valve 39 : Gas service tap 41 : Central heating return isolating valve 43 : Central heating pressure relief valve 16 24

  • C&M 24, 22 19 Model Centora Green System 24 Centora Green System 30 Appliance category........................................... II 2H3P II 2H3P Heat gross input C/H maxi ............................... 27.8 kW 94534 Btu/h 31.6 kW 107843 Btu/h Heat output C/H 50°/30° maxi.......................... 26 kW 88732 Btu/h 30 kW 102383 Btu/h Heat output C/H 80°/60° maxi.......................... 24 kW 81907 Btu/h 28 kW 95557 Btu/h C/H operating temperature............................... 80°C max 25°C min 80°C max 25°C min C/H circuit pressures Min operating................. 0.7 bar 10 Ib/in 2 0.7 bar 10 Ib/in 2 C/H circuit pressures Max operating................ 2.5 ba

More Instructions:

DOWNLOAD

Related Products and Documents (Boiler):

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 Grace Digital Pandora GDI-IR2550P Operation & user’s manual grace-digital/pandora-gdi-ir2550p-8KX.pdf 12 Oct 2022 51 0.53 Mb
2 Casio CTK-495 Operation & user’s manual casio/ctk-495-7HW.pdf 08 Oct 2023 36 14.45 Mb
3 Audi V6 BITURBO Manual  audi/v6-biturbo-2PC.pdf 17 Dec 2022 72 3.41 Mb
4 Lenovo ThinkCentre Edge 91z Benutzerhandbuch lenovo/thinkcentre-edge-91z-98H.pdf 09 Sep 2023 108
5 Rotel RB-976MkII Owner's manual rotel/rb-976mkii-G1V.pdf 08 Mar 2024 31 2.37 Mb
6 Sony XR-CA410 Operating instructions manual sony/xr-ca410-76S.pdf 03 Apr 2023 124 1.47 Mb

Similar Resources:

  • Aerco

    KC Series

    (118 pages)
    REVISED JULY 8, 2011 GF-111LN OMM-0029_0B KC Series Low NOx Gas-Fired Water Heater USER MANUAL Applicable to Serial Numbers G-11-0694 and Above KC Series Low NOx Gas Fired Water Heating System Natural Gas or Propane Fired, Condensing and Forced Draft Hot Water Heater 1,000,000 BTU/HR Input Patent No. 4,852,524 …
  • Nibe

    ECS 40

    (144 pages)
    InstallatörshandbokExtra klimatsystemSEInstaller manualExtra climate systemGBInstallateurhandbuchZusätzlicher Heiz- und KühlkreisDEAsentajan käsikirjaLisälämmitysjärjestelmäFIIHB 1934-9231401ECS 40/ECS 41LEKLEKLEKS1155 / S1255 / VVM S320 / VVM S325 / SMO S40F1145 / F1155 / F1245 / F1255 / F1345 / F1355 / F370 / F470 /F730 / F750 / VVM 225 / VVM 310 / …
  • Bradford White

    LAARS NEOTHERM LC NTH1200

    (12 pages)
    User’s Manual Doc. 1256AH2353000AFOR YOUR SAFETY: This product must be installed and serviced by a professional service technician, qualied in hot water boiler and heater installation and maintenance. Improper installation and/or operation could create carbon monoxide gas in ue gases which could cause serious injury, property damage, or death. Improp …
  • Ideal Boilers

    Imax xtra F320

    (4 pages)
    users guideYour Ideal users guideSee reverse for installation & servicing guideWhen replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers.xtraModels …
  • UNMAK

    UKY/DUO Series

    (27 pages)
    ÜKY/DUO Boiler User Manual ÜNLÜSOY Yapı Malzemeleri Sanayi ve Ticaret Ltd. Şti. Pancar Organize Sanayi Bölgesi, 2. Etap No:2, Torbalı – İZMİR Tel: 444 35 32, Faks: 0232 469 2412 www.unmak.com …
  • Quick

    B3

    (56 pages)
    Manuale d’uso BOILER SERIE B3User’s Manual WATER HEATER SERIES B3Manuel de l’utilisateur CHAUFFE-EAU SERIE B3Benutzerhandbuch BOILER BAUREIHE B3Manual del usuario CALENTADOR SERIE B3Manual de uso AQUECEDOR SÉRIE B3Bruksanvisning VATTENVÄRMARE SERIE B3Handleiding BOILER SERIE B3 BOILER B3 B3 15 B3 20 B3 25 B3 30 B3 40 B3 60 B3 80High Qu …

Comments, Questions and Opinions: