Manualios.com

Coopra 40C Installation Manual

Coopra 40C Manual Online:

3.1, 2025 votes
Coopra 40C User Manual
Coopra 40C User Guide
Coopra 40C Online Manual

Text of Coopra 40C User Guide:

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 29 8.11.7. Inspection / cleaning / replacement of the ionisation probe • unplug the plug of the ionisation probe (low voltage). • remove the two screws from the ionisation clamp. • remove the ionisation probe from the lid of the unit. • check the ionisation probe. • the ionisation probe must be straight and clean (a slight deposit is normal). • clean or replace the ionisation probe. 8.11.8. Ionisation probe or ionisation cable makes short circuit with earth The negatively charged ions created

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 25 6.12. Flue sensor Switching the supply voltage on makes the flue sensor active. If the flue sensor measures a temperature below –25°C, the regulation locks with the message flue sensor interruption (‘4’). Low load: If the flue gas temperature goes above 80°C, the burner is limited to low load. If the flue gas temperature goes below 70°C, the blocking actions will be automatically removed. The display shows continuous �

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 28 8.11. Malfunction code 'F' (flashing) After three failed attempts in a row, the unit will lock (flashing 'F'). This can have very different causes: • no gas • no ignition • bad flame formation • bad ionisation current 8.11.1. Gas control will not open (no voltage) Careful !!! 210 VDC If the gas control is not connected, the Manager will see this at the beginning of the heat demand as a malfunction and therefore lock. To measure the voltage on the gas control, the gas contro

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 14 CHAPTER 3. SUSPENDING THE UNIT 3.1. The unit Before unpacking the unit, check whether the type of gas to be used corresponds with the specification on the packing. If you have any questions, contact your supplier. To prevent back injury, take account of the fact that the weight of the unit is roughly 35 kg. 3.2. Suspension Place an O-ring in the middle of each of the connections present (1) - (5). Remove the caps from the pipes of

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 32 2007 Coopra Advanced Heating Technologies b.v. All rights reserved. Nothing from this document may be duplicated and/or made public by means of printing, photocopy, microfilm or in any other way without prior written permission from the manufacturer. This also applies to the appropriate drawings and/or diagrams. The information supplied in this document is based on general data with regard to constructions, material

  • Coopra Advanced Heating Technologies Installation manual 40 EN 15 3.5.2. Modulating room thermostat (if applicable). Connect to terminals (1) and (2) The modulating room thermostat must be fitted in the same building as the unit. Strip about 5 mm off the insulation of the wires of the room thermostat. Stick the stripped ends of the wires into connections (1) and (2) of the

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 17 Pre-adjustment to be done in voltage-free condition: - LPG GAS – Turn venturi-screw clockwise 3 completely down on its seat. Then turn the venturi screw anti-clockwise 4 for 1/2 complete turns. - N ATURAL GAS – Turn venturi-screw clockwise 3 completely down on its seat. Then turn the venturi screw anti-clockwise 4 for 3 complete turns. With a vernier callipers the distance between venturi-screw (1) and the Top of the venturi-stud (1) has to be measured

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 18 4.10. Changing over to LPG-gas First: the venturi adjusting screw fully clockwise until it blocks. Fit a flue gas analyser (CO 2 meter) in the measurement opening of the flue tube canal. Full load on LPG Activate the chimney sweeper function on full load. Turn the venturi adjusting screw fully clockwise until it blocks. Unscrew the venturi adjusting screw half a full turn anti- clockwise. Try to start the appliance. Unscrew the venturi adjusting screw another half a full turn anti-clockwise. Try to start the appliance. Repeat till the boiler starts. (A guide for the dim

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 11 1.12. Pump and hydraulic resistance The pump characteristic and the resistance graph of the unit are given below. If set on automatic function (menu setting) the electronics switches the speed of the pump to “high” or “low”, depending on the temperature demand: • Dt > 30 °C : the pump runs „high speed“. • Dt < 10 °C : the pump runs „low speed“. Dt = Setpoint temperature deducted with the actual Flow temperature

  • Coopra Advanced Heating Technologies Installation manual 40 EN 27 CHAPTER 8. MALFUNCTIONS High voltage! The wiring of the pump, the three-way valve, fan and wiring of the gas control can be under a voltage of 230 VAC. 8.1. Draining the unit • On the central heating side: Switch the unit off and open the filling tap. • On the HWS side: Switch the unit off. Shut the in

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 4 CHAPTER 1. 1.1. Technical data Boiler type 40C Gas type natural gas G20 LPG gas G30/G31 Mains voltage / Frequency 230 V / 50 Hz Power consumption (max.) 144 W Electrical data Thermostat voltage 24 V Height 600 mm Width 360 mm Depth 300 mm Dimensions and weight Weight 35 kg CO 2 8.2% - 8.8% 9.2% - 9.8% CO (0% 0 2 ) 12 – 100 ppm Emission value NO X (0% O 2 ) 10 – 30 ppm at 80/60ºC < 70ºC Flue gas- temperature at 50/30ºC < 35ºC Maximum c

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 24 Fan: The fan is running at the required speed for modulating heat demand. When the measured fan speed deviates from the desired speed, post rinse will be performed. Ionisation: If the ionisation fails, a restart is made, providing this is not the third time within the burner demand. If this is the third time, the Manager will lock-out. Pump monitoring: If the temperature difference between flow and return is greater than 30°C, the pump switches to a high speed. When the temperature difference dr

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 7 1.4. Diagrams 1.4.1. Functional flow diagram F1 L F2 N + - FSP -t -t -t -t -t -t BURNER FLOW X17.6 X7.1 X7.2 X7.4 X14 X6.4 X6.1 X12 X8.6 X8.2 X4.4 X3.5 X3.4 X3.2 X3.1 X22.2 X22.1 X4.6 X4.5 X4.3 X4.1 X8.5 X8.4 X8.3 X8.1 X6.3 X9.2 X1.3 X10.2 X11.2 X9.1 X1.4 X10.1 X11.1 X16.7 X16.6 X16.3 X16.2 X15.2 X15.1 X15.3 X18.1 X18.3 X17.5 X19.1 X17.2 X19.2 X17.3 ROOM THERMOSTAT 24VAC ROOM THERMOSTAT 230VAC EbV THERMOSTAT OPENTHERM THERMOSTAT PC CONNECTION FLUE GAS OUTSIDE WATER PRESSURE + P - RETURN DHW INLET EXTERNAL TANK TANK THERMOSTAT GLOW IGNITER LN IONISATION GAS VALVE 230 VRAC COMBUSTION F

  • Coopra Advanced Heating Technologies Installation manual 40 EN 26 CHAPTER 7. MAINTENANCE High voltage! ! ! The wiring of the pump, the three-way valve, fan and wiring of the gas block can be under a voltage of 230 VAC. Serial connection A PC or Lapt op can be con nect ed for an extensive diagnosis and display of the functionality. The necessary c

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 12 CHAPTER 2. INSTALLATION 2.2. Mounting the assembly bracket To mount the assembly bracket on a brick wall of sufficient thickness, use the screw plugs that are supplied. When you have determined the place of assembly, proceed as follows: 1. Draw the position of the hole (1) in the strap of the assembly bracket. 2. Use a masonry drill of 8 mm diameter to drill a hole with a sufficient depth in the wall. 3.

  • Coopra 40C, EN Installation Manual Heating Boiler . . . Type 40C Wall hung, fan flue, room sealed gas boiler CHAPTER 1. GENERAL CHAPTER 2. INSTALLATION CHAPTER 3. SUSPENDING THE UNIT CHAPTER 4. COMMISSIONING CHAPTER 5. TEMPERATURE REGULATIONS CHAPTER 6. BURNER STATES and MONITORING CHAPTER 7. MAINTENANCE CHAPTER 8. MALFUNCTIONS CE-CERTIFICATE 2007 E000129032

  • Coopra 40C, Coopra Advanced Heating Technologies Installation manual 40 EN 23 CHAPTER 6. BURNER STATES and MONITORING Pump Standby Pre rinse Ignition In operation Post rinse afterrun Standby heat demand fan gas valve glow plug ionisation pump t=0sec

Related Products and Documents (Boiler):

Comparable Devices:

# Manufacturer Model Document Type File Updated Pages Size
1 Insignia NS-PCS21 Guide d'installation rapide insignia/ns-pcs21-871.pdf 26 Jun 2023 2
2 Bradford White Powered Direct Vent Series Installation and operating instructions manual bradford-white/powered-direct-vent-series-7F4.pdf 13 Apr 2023 43 0.34 Mb
3 Microtek 997M Operation & user’s manual microtek/997m-A6O.pdf 08 Aug 2023 26
4 Bunn IMIX-14 Installation & operating manual bunn/imix-14-HL2.pdf 09 Dec 2023 17 3.8 Mb
5 Palsonic MODEL 5179G Owner's manual palsonic/model-5179g-2ZS.pdf 11 Jul 2022 24 0.41 Mb
6 Sierra Wireless AirCard 881 Wireless Modem Installation manual sierra-wireless/aircard-881-wireless-modem-B18.pdf 17 May 2023 60 0.69 Mb

Similar Resources:

  • Potterton

    Promax 15 HE

    (44 pages)
    Installation & Service InstructionsPromax15 HE & 24 HEThis is a Wall Mounted Powered Flue Condensing Boiler Gas Fired Central Heating Unit.The boiler meets the requirements of Statutory Instrument “ The Boiler (Efficiency) Regulations 1993 No3083” and isdeemed to meet the requirements of Directive 92/42/EEC on the energy efficiency requirements f …
  • Ideal Boilers

    RS 60P

    (4 pages)
    CAUTION - To avoid the possibility of injury during the operation or cleaning of this appliance, care should be taken when handling the edges of sheet steel components Ideal Mexico Super 2 Appliance G.C. No. CF 60P 41 349 49 Ideal Mexico Super 2 US 60P Appliance G.C. No. 41 349 61 CF 75P 41 349 50 RS 75P 41 349 …
  • HTP

    MODCON1000

    (69 pages)
    Mod ConInstallationStart-UpMaintenancePartsWarrantyMODCON1000 / MODCON1700“LP” Denotes Propane Gas Operation“HL” Denotes Installed High and Low Gas Pressure SwitchesThis manual must only be used by a qualied installer / service technician. Read all instructions in this manual before installing. Perform steps in the given order. Failure to do so co …
  • TES

    TES Series

    (15 pages)
    DNAGNITAREPO,NOITALLATSNIROFSNOITCURTSNIECIVRESTES®SEIRESRELIOBDERIF-,reliobnonoitamrofnignikeesnehW.rotcartnocgnitaehruoyllac,reliobotsriaperroecivresroF.lebaLgnitaRnonwohssarebmuNlaireSdnarebmuNledoMrelioBedivorprebmuNledoMrelioBrebmuNlaireSrelioB etaDnoitallatsnIrotcartnoCgnitaeHrebmuNenohPsserddAGASgGASASGAS/OIL …
  • Vaillant

    0020180635

    (80 pages)
    en System installation instructionscs Systém návod k instalacide System Installationsanleitungfi Järjestelmän asennusohjeetfr Notice d’installation du systèmehr Upute za instaliranje sustavanl Systeem installatiehandleidingno Installasjonsveiledning forsystemsk Návod na inštaláciu systémusl Navodila za namestitev sistemasv System installationsanvi …
  • Halstead

    Buckingham III BF40

    (4 pages)
    Instructions for UseHAlSTEADBucking hamIIIBalanced Flue BoilersBF40, BF50 & BF60CE:References in these instructions toBritish Standards and StatutoryRegulations/Requirements apply only to the United Kingdom.For Ireland the rules in force must be used.The instructions consist of two parts, Installation and Servicing Instructions and Instructions for Use.T …

Comments, Questions and Opinions: